Next Article in Journal
Windows and Doors Extraction from Point Cloud Data Combining Semantic Features and Material Characteristics
Next Article in Special Issue
Estimating the Concrete Ultimate Strength Using a Hybridized Neural Machine Learning
Previous Article in Journal
Design for Seismic Resilient Cross Laminated Timber (CLT) Structures: A Review of Research, Novel Connections, Challenges and Opportunities
Previous Article in Special Issue
Investigation of the Earthquake Performance Adequacy of Low-Rise RC Structures Designed According to the Simplified Design Rules in TBEC-2019
 
 
Article
Peer-Review Record

GIS-Based Risk Assessment of Structure Attributes in Flood Zones of Odiongan, Romblon, Philippines

Buildings 2023, 13(2), 506; https://doi.org/10.3390/buildings13020506
by Jerome G. Gacu 1,2,3, Cris Edward F. Monjardin 1,2,4,*, Kevin Lawrence M. de Jesus 1,4 and Delia B. Senoro 1,2,4
Buildings 2023, 13(2), 506; https://doi.org/10.3390/buildings13020506
Submission received: 14 January 2023 / Revised: 3 February 2023 / Accepted: 9 February 2023 / Published: 13 February 2023

Round 1

Reviewer 1 Report

Please refer to attachment 

Comments for author File: Comments.pdf

Author Response

Please see the attachment

Author Response File: Author Response.pdf

Reviewer 2 Report

 

The paper is interesting, but some minor problems could be addressed in its final version:

Damage Cost (in Php) – should be presented in USD or other international currency,

In the table 1 Reference could be added in bot forms Name and date + No of citation

Line 59 - …..built environment…. – it should be explained built in which sense?

“..” line 157

Fig 2 is fuzzy.

It seems unnecessary in Figure 2 to link the study diagram with its results Flood risk for building. Especially since the source of the figure does not indicate a literature reference, and it seems that the central part of the figure should be cited.

In Table 2 References should be last column not first,

In the Table 2 in Vulnerability Parameters should not be Flooring material per square meter of the building, and other factors too?

Formula 2 have some mistakes

Author Response

Please see attachment

Author Response File: Author Response.pdf

Back to TopTop