Holism and Territorial Spatial Planning Reform in China: Evolutionary Challenges and Governance Measures Under Chinese-Style Modernization
Abstract
1. Introduction
2. Research Design and Methods
2.1. Research Design and Research Questions
2.2. Data Sources and Scope of Materials
2.3. Operationalization of the Analytical Framework and Coding Scheme
2.4. Research Workflow and Analytical Steps
2.5. Credibility Controls and Study Limitations
2.6. Empirical Illustration: Shenzhen Coding Example on “Transport Construction–Ecological Baselines”
3. Territorial Spatial Planning System-Building from a Holistic Theoretical Perspective
3.1. Connotations of Holism
3.2. Feasibility and Necessity of Introducing a Holistic Analytical Perspective
3.2.1. Domestic Research Trajectory and the Need for Holistic Spatial Governance
3.2.2. International References, Transferability, and Boundary Conditions
3.2.3. Comparison with Related Theoretical Frameworks: Systems Theory, Complex Adaptive Systems, and Holism
3.3. Spatial Planning and Theory Construction Under the Perspective of Holism
3.3.1. Spatial Planning from a Holistic Perspective
3.3.2. Theory Construction for Territorial Spatial Planning Under Holism
4. Evolutionary Pathway of Planning Innovation Under Chinese-Style Modernization
4.1. A Retrospective Review of the Evolution of Territorial Spatial Planning Innovation
4.1.1. “Top-Down Transmission”: Territorial Planning in the Planned-Economy Era (1949–1978)
4.1.2. Reform Experimentation: System-Building During the Reform and Opening-Up Period (1978–1992)
4.1.3. Coexistence of Multiple Plans: The Urban “Growth Machine” Under the Market System (1992–2010)
4.1.4. Overlapping Mandates: Contradictions and Conflicts During the Development Transition (2010–2018)
4.1.5. Multi-Plan Integration: Territorial Spatial Planning Under the Modernization of National Governance (2018–Present)
4.2. Innovation Pathways in the Evolution of Spatial Planning from a Holistic Perspective
4.2.1. Attribute Cognition: From Partial Understanding Toward More Comprehensive and Continuous Development
4.2.2. Relational Structuring: From Single-Objective Service to a Pluralistic Governance System
4.2.3. Feedback and Testing: From Fragmented Management to Centralized Governance
5. Challenges and Governance Responses in Spatial Planning Reform Under Chinese-Style Modernization
5.1. Real-World Challenges of Planning Reform
5.1.1. The Development–Protection Tension
5.1.2. The Challenge of Governance Coherence Under Chinese-Style Modernization
5.1.3. Conflicts Among Complex Relations
5.1.4. Grasping the Whole and the Parts
5.2. Solutions for Modernization-Oriented Governance from a Holistic Perspective
5.2.1. Governance Responses for Balancing Development and Protection
5.2.2. Coherence and Complex Relations
5.3. Comparative Implications and Boundary Conditions
6. Conclusions and Discussion
6.1. Key Governance Bottlenecks: Three Types of Chain Misalignment
6.2. International Applicability and Boundary Conditions
6.3. Study Limitations
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
Appendix A. Traceable Evidence Base and Coding Materials
Appendix A.1. Policy and Institutional Corpus Inventory (1949–Present)
| Section/Notes | Policy ID | Year | Level | Document Type | Material Type | Document/Material Title |
|---|---|---|---|---|---|---|
| Stage I (1949–1978).Planned Economy | [National: Laws/Resolutions/Plans/Notices (codable texts, D)] | |||||
| N01 | 1947 | National | Law | D | 《中国土地法大纲》 | |
| N02 | 1950 | National | Law | D | 《中华人民共和国土地改革法》 | |
| N05 | 1953 | National | Meeting Decision/Resolution | D | 《关于农业生产互助合作的决议》 | |
| N07 | 1955 | National | Development Plan/Five-Year Plan | D | 《中华人民共和国发展国民经济的第一个五年计划 (1953–1957)》 | |
| N08 | 1956 | National | Plan/Outline | D | 《1956–1967年全国农业发展纲要 (农业发展纲要 40 条)》 | |
| N10 | 1956 | National | Policy Document/Regulation | D | 《区域规划编制与审批暂行办法 (草案)》 | |
| N11 | 1958 | National | Policy Document/Regulation | D | 《关于工作方法 60 条 (草案)》 | |
| N12 | 1958 | National | Meeting Decision/Resolution | D | 《关于在农村建立人民公社问题的决议》 | |
| N13 | 1958 | National | Policy Document/Regulation | D | 《关于开展人民公社土地利用规划工作的通知》 | |
| N15 | 1965 | National | Other | D | 《关于第三个五年计划安排情况的汇报提纲》 | |
| N16 | 1977 | National | Other | D | 《关于经济计划的汇报要点》 | |
| [National: Institutional events/milestones (non-codable, E)] | ||||||
| N03 | 1952 | National | Institutional Event/Milestone | E | 黑龙江省集贤县三道岗地区开展土地区划 | |
| N04 | 1952 | National | Institutional Event/Milestone | E | 农业部成立国营农场管理总局 | |
| N06 | 1954 | National | Institutional Event/Milestone | E | 友谊农场建立: 首次有组织地开展土地利用规划工作 | |
| N09 | 1956 | National | Institutional Event/Milestone | E | 成立农垦部, 统一管理军垦农场与地方国营农场 | |
| N14 | 1959 | National | Institutional Event/Milestone | E | 农业部提出“边普查、边规划、边行动…将成果落实到生产中” | |
| N17 | 1978 | National | Institutional Event/Milestone | E | 土地利用局设立 (后改称土地管理局) | |
| Stage II (1978–1992). Reform exploration/system experimentation | [National: Laws/Ordinances/Notices/Rules (codable texts, D)] | |||||
| N19 | 1982 | National | Policy Document/Regulation | D | 《县级土地利用总体规划要点》 | |
| N20 | 1984 | National | Meeting Decision/Resolution | D | 《关于经济体制改革的决定》 (十二届三中全会) | |
| N21 | 1986 | National | Policy Document/Regulation | D | 《关于加强土地管理制止乱占耕地的通知》 | |
| N22 | 1986 | National | Law | D | 《中华人民共和国土地管理法》 | |
| N23 | 1987 | National | Policy Document/Regulation | D | 《关于开展土地利用总体规划的通知》 | |
| N24 | 1987 | National | Ordinance/Regulation | D | 同年多项配套: 全国规划纲要/编制审批办法/县规程/耕地占用税/建设用地办法/联合通知等 | |
| N26 | 1989 | National | Policy Document/Regulation | D | 《关于加强省级国土规划工作的通知》 | |
| N27 | 1990 | National | Plan/Outline | D | 《全国国土总体规划纲要 (草案)》 | |
| N28 | 1990 | National | Law | D | 《中华人民共和国城市规划法》 | |
| [National: Pilot programs/institutional milestones (non-codable, E)] | ||||||
| N18 | 1980 | National | Institutional Event/Milestone | E | 第二次农业区划会议: 县级土地利用总体规划试点启动 (多县试点) | |
| N25 | 1988 | National | Institutional Event/Milestone | E | 全国城市、县城总体规划基本完成 | |
| [Shenzhen: master plans/general plans (codable texts, D)] | ||||||
| S01 | 1980 | Shenzhen | Plan/Outline | D | 《深圳市经济特区城市发展纲要》 | |
| S02 | 1982 | Shenzhen | Plan/Outline | D | 《深圳经济特区社会经济发展规划大纲》 | |
| S03 | 1984 | Shenzhen | Urban Master Plan | D | 《总规 (1986)》 | |
| S04 | 1985 | Shenzhen | Specialized Plan | D | 《深圳特区道路交通规划》 | |
| S05 | 1990 | Shenzhen | Specialized Plan | D | 《深圳市城市规划标准与准则》 | |
| Stage III (1992–2010s). Parallel plans/growth-oriented governance | [National: Laws/ordinances/plan outlines (codable texts, D)] | |||||
| N29 | 1993 | National | Plan/Outline | D | 《全国土地利用总体规划纲要》草案 | |
| N30 | 1993 | National | Meeting Decision/Resolution | D | 《中共中央关于建立社会主义市场经济体制若干问题的决定》 | |
| N31 | 1993 | National | Ordinance/Regulation | D | 《村庄和集镇规划建设管理条例》 | |
| N32 | 1994 | National | Ordinance/Regulation | D | 《基本农田保护条例》 | |
| N34 | 1996 | National | Policy Document/Regulation | D | 《关于加强城市规划工作的通知》 | |
| N35 | 1998 | National | Law | D | 《中华人民共和国土地管理法》 (1998修订) | |
| N36 | 2003 | National | Plan/Outline | D | 《全国土地利用总体规划纲要 (2003–2020)》 | |
| N38 | 2008 | National | Law | D | 《城乡规划法》 | |
| N39 | 2008 | National | Policy Document/Regulation | D | 《国务院关于印发全国土地利用总体规划纲要 (2006―2020年) 的通知》 | |
| N40 | 2010 | National | Plan/Outline | D | 《全国主体功能区规划》 | |
| [National: macro-institutional turning points (non-codable, E)] | ||||||
| N33 | 1994 | National | Institutional Event/Milestone | E | 分税制改革 | |
| N37 | 2006 | National | Institutional Event/Milestone | E | “十一五”纲要首次官方使用“国土空间”概念 | |
| [Shenzhen: master plans/general land-use plans (codable texts, D)] | ||||||
| S06 | 1998 | Shenzhen | Ordinance/Regulation | D | 《深圳市城市规划条例》 | |
| S07 | 2000 | Shenzhen | Urban Master Plan | D | 《总规 (1996)》 | |
| S08 | 2002 | Shenzhen | Specialized Plan | D | 《深圳2030城市发展策略》 | |
| S09 | 2006 | Shenzhen | General Land-Use Plan | D | 《深圳市土地利用总体规划 (2006–2020年)》 | |
| S10 | 2009 | Shenzhen | Specialized Plan | D | 《深圳市城市更新规划》 | |
| S11 | 2010 | Shenzhen | Urban Master Plan | D | 《深圳市城市总体规划 (2010–2020)》 | |
| Stage IV (2010–2018). Coordination trials under fragmentation | [National: central documents/plans (codable texts, D)] | |||||
| N41 | 2010 | National | Central Document/Planning Proposal | D | 《关于制定国民经济和社会发展第十二个五年规划建议的说明》 | |
| N42 | 2014 | National | Plan/Outline | D | 《国家新型城镇化规划 (2014–2020年)》 | |
| N43 | 2014 | National | Policy Document/Regulation | D | 《关于开展市县“多规合一”试点工作的通知》 | |
| N44 | 2015 | National | Central Document/Planning Proposal | D | 《中共中央关于制定国民经济和社会发展第十三个五年规划的建议》 | |
| [National: reform milestones and concept formation (non-codable, E)] | ||||||
| N45 | 2011 | National | Institutional Event/Milestone | E | “十二五”科技发展规划首次出现“国土空间规划”概念 | |
| N46 | 2013 | National | Institutional Event/Milestone | E | “多规合一”改革试点阶段启动 (以十八届三中全会/中央城镇化工作会议为标志) | |
| N47 | 2013 | National | Institutional Event/Milestone | E | 中央城镇化工作会议: 国家规划与市场力量“两只手” | |
| N48 | 2014 | National | Institutional Event/Milestone | E | 市县级“多规合一”试点推进 | |
| N49 | 2015 | National | Institutional Event/Milestone | E | 首批省级空间规划暨“多规合一”试点 (海南、宁夏) | |
| [Shenzhen: related studies/thematic plans (codable texts, D)] | ||||||
| S12 | 2010 | Shenzhen | Urban Master Plan | D | 《深圳市城市总体规划 (2010–2020)》 | |
| S13 | 2012 | Shenzhen | Implementation Rules/Normative Document | D | 《深圳市城市更新办法实施细则》 | |
| S14 | 2016 | Shenzhen | Supporting Study/Thematic Research | D | 《深圳 2035 城市总体规划—城市设计新理念 (2016–2035)》 | |
| Stage V (2018–present). Territorial spatial planning system restructuring | [National: top-level institutions/guidelines/standards (codable texts, D)] | |||||
| N50 | 2019 | National | Policy Document/Regulation | D | 《中共中央国务院关于建立国土空间规划体系并监督实施的若干意见》 | |
| N51 | 2020 | National | Guideline/Standard | D | 《市级国土空间总体规划编制指南 (试行)》 | |
| N52 | 2020 | National | Guideline/Standard | D | 《省级国土空间规划编制指南 (试行)》 | |
| N53 | 2021 | National | Data Standard | D | 《国土空间用途管制数据规范 (试行)》 | |
| N54 | 2022 | National | Policy Document/Letter | D | 《自然资源部关于在全国开展三区三线划定工作的函》 | |
| N55 | 2025 | National | Technical Guideline | D | 《生态环境分区管控技术指南 总纲》 | |
| [Regional/Provincial: Greater Bay Area and Guangdong (codable texts, D)] | ||||||
| R01 | 2019 | Regional | Strategic Outline | D | 《粤港澳大湾区发展规划纲要 (近期至 2022, 远期 2035)》 | |
| P01 | 2020 | Guangdong Province | Provincial Territorial Spatial Master Plan | D | 《广东省国土空间规划 (2021–2035)》 | |
| [Shenzhen: municipal master plan and thematic plans (codable texts, D)] | ||||||
| S15 | 2018 | Shenzhen | Specialized Plan | D | 《深圳市海岸带综合保护与利用规划 (2018–2035)》 | |
| S16 | 2019 | Shenzhen | Specialized Plan | D | 《深圳市城中村 (旧村) 综合整治总体规划 (2019–2025)》 | |
| S17 | 2020 | Shenzhen | Municipal Territorial Spatial Master Plan | D | 《深圳市国土空间总体规划 (2021–2035)》 | |
| S18 | 2021 | Shenzhen | Specialized Plan | D | 《深圳市公园建设发展专项规划 (2021–2035)》 | |
| S19 | 2021 | Shenzhen | Specialized Plan | D | 《深圳市养老服务设施布局专项规划 (2021–2035)》 | |
| S20 | 2021 | Shenzhen | Specialized Plan | D | 《深圳市医疗卫生设施布局专项规划 (2021–2035)》 | |
| S21 | 2021 | Shenzhen | Specialized Plan | D | 《深圳市应急疏散救援空间规划 (2021–2035)》 | |
| S22 | 2021 | Shenzhen | Specialized Plan (14th Five-Year Plan) | D | 《深圳市综合交通“十四五”规划》 | |
| S23 | 2021 | Shenzhen | Specialized Plan (14th Five-Year Plan) | D | 《深圳市应急管理体系和能力建设“十四五”规划》 | |
| S24 | 2021 | Shenzhen | Specialized Plan (14th Five-Year Plan) | D | 《深圳市城市更新和土地整备“十四五”规划》 | |
| S25 | 2022 | Shenzhen | Specialized Plan | D | 《深圳市基础教育布局专项规划 (2022–2035)》 | |
| S26 | 2023 | Shenzhen | Specialized Plan | D | 《深圳市无障碍城市专项规划 (2023–2035)》 | |
| S27 | 2024 | Shenzhen | Specialized Plan | D | 《深圳市基础教育布局专项规划 (2024–2035)》 | |
| S28 | 2024 | Shenzhen | Specialized Plan | D | 《深圳市综合立体交通网规划方案 (2024–2035)》 | |
| S29 | 2025 | Shenzhen | Specialized Plan | D | 《深圳市地下空间资源利用规划 (2025–2035)》 | |
| S30 | 2025 | Shenzhen | Specialized Plan | D | 《深圳市湿地保护规划 (2025–2035)》 | |
| [District-level: Nanshan District (codable texts, D)] | ||||||
| D01 | 2020 | Nanshan District | Zonal Plan | D | 《深圳市南山区国土空间分区规划 (2021–2035)》 | |
| D02 | 2021 | Nanshan District | Specialized Plan (14th Five-Year Plan) | D | 《南山区城市更新和土地整备“十四五”规划》 | |
| D03 | 2021 | Nanshan District | Specialized Plan (14th Five-Year Plan) | D | 《南山区文体旅游发展“十四五”规划》 | |
| D04 | 2021 | Nanshan District | Specialized Plan (14th Five-Year Plan) | D | 《深圳市南山区创新型现代产业体系十四五发展规划》 | |
| D05 | 2021 | Nanshan District | Specialized Plan (14th Five-Year Plan) | D | 《数字政府和智慧南山建设“十四五”规划》 | |
| [Statutory regulatory plans: subarea texts (codable texts, D)] | ||||||
| Z01 | 2018 | Shenzhen | Statutory Regulatory Plan (Map) | D | 《南山 08-03&08-04 号片区 [红树湾地区]法定图则文本》 | |
| Z02 | 2020 | Shenzhen | Statutory Regulatory Plan (Map) | D | 《南山 06-05 号片区 [同乐地区 (北区)]法定图则文本》 | |
Appendix A.2. Stage Delineation and Turning-Point Rationale
| Stage | Institution/Policy | Function | Time Span | Governance Shifts (Cognition–Relation–Testing) |
|---|---|---|---|---|
| Stage I. Top-down allocation (planned economy): founding of the PRC in 1949 (institutions/governance goals) | Land Reform Law (1950) (《土地改革法》) | Reconstructed the land regime and established a production-organization-centered logic for spatial resource allocation. | 1949–1978 | Cognition: space understood as a planned factor of production and construction carrier; Relation: strongly hierarchical, top-down transmission; Testing: plan execution and administrative appraisal dominate, with weak feedback. |
| First Five-Year Plan (1953–1957) (《第一个五年计划》) | Highly planned construction tasks; spatial allocation subordinated to national plans. | |||
| Directives/resolutions on People’s Communes and land-use planning (1958–1959) | Land allocation and implementation driven by administrative mobilization and plan quotas. | |||
| Stage II. Reform exploration (system experimentation): Reform and Opening-up since 1978 (governance goals/institutions) | Reform and Opening-up (1978) | Shifted from plan-command dominance to a hybrid “plan + market” allocation framework; emerging commodity economy and rising demand for development-oriented planning under the dual-track system. | 1978–1992 | Cognition: expanded from “planned space” to coordinated space for development and resource allocation; Relation: plan and market co-exist, sectoral plans begin to differentiate and fragment; Testing: early use of land-use control/legal instruments, but corrective feedback remains limited. |
| Key points for county-level general land-use planning (1982) (《县级土地利用总体规划要点》) | Early planning techniques and compilation frameworks formed, emphasizing coordinated land use. | |||
| Land Administration Law (1986) (《土地管理法》) | Legalized land-use control and farmland protection, forming hard constraints via “control–approval” mechanisms. | |||
| City Planning Law (1990) (《城市规划法》) | Legalized urban planning and established foundational institutions for plan-making and management. | |||
| Stage III. Multiple plans in parallel (growth machine): market-economy framework established in 1992 (governance goals/institutions) | Establishment of the socialist market-economy system (1992) | Local development incentives strengthened; spatial planning became more instrumental to growth, with land marketization and fiscal reforms jointly driving expansion. | 1992–2010 | Cognition: planning increasingly serves growth-oriented development organization; Relation: strengthened local growth incentives and parallel sectoral plans accumulate conflicts; Testing: constraints exist but are frequently negotiated or bypassed through project-based discretion. |
| Revision of the Land Administration Law and strengthened land-use control (1998) | The central state strengthened macro-constraints through land-use control and farmland protection to respond to growth-driven expansion pressures. | |||
| National Outline for General Land-Use Planning (2003–2020) (2003) (《全国土地利用总体规划纲要 (2003–2020)》) and related documents | Responded to expansion pressures through scale control and baseline constraints. | |||
| Urban and Rural Planning Law (2008) (《城乡规划法》) | Extended planning from “urban” to integrated urban–rural planning, improving the plan-making–implementation–supervision chain. | |||
| Stage IV. Fragmented mandates (rising conflicts and coordination trials): Major Function-Oriented Zoning in 2010 (tools/testing and governance goals) | National Major Function-Oriented Zoning Plan (2010) (《全国主体功能区规划》) | Introduced strategic, binding planning for development and protection, promoting functional zoning and differentiated regulation. | 2010–2018 | Cognition: shift toward ecological civilization and governance modernization; Relation: cross-level and cross-sector mandate overlaps intensify, prompting exploration of coordination mechanisms; Testing: differentiated zoning and constraint tools expand, while adjustment/learning mechanisms begin to emerge. |
| NDRC Notice No. 1971 (2014) on launching county/city “Multiple-Plan Integration” pilots (《开展市县“多规合一”试点通知》) | Used the “one blueprint” approach to address plan conflicts and coordination dilemmas. | |||
| Overall Plan for Reforming the Ecological Civilization System (2015) (《生态文明体制改革总体方案》) | Institutionalized ecological civilization and spatial balance ideas, strengthening development–protection coordination. | |||
| Provincial spatial planning pilot program (2017) (《省级空间规划试点方案》) | Scaled multiple-plan integration from county/city pilots to provincial pilots, exploring a unified alignment system. | |||
| Stage V. Planning system restructuring (“One Plan”/territorial spatial planning): 2018 institutional reform and MNR (mandates/tools/testing) | State Council Institutional Reform Plan (2018) (《国务院机构改革方案》) | Established the Ministry of Natural Resources (MNR), consolidating mandates (e.g., MFZ and urban–rural planning administration) to lay the foundation for a unified spatial planning system. | 2018–present | Cognition: territorial spatial planning as an integrated public policy tool for national spatial governance; Relation: unified system strengthens vertical constraints and horizontal coordination; Testing: institutionalization of the evaluate–adjust–accountability closed loop, with stronger supervision and enforceability. |
| Opinions on establishing and supervising the territorial spatial planning system (2019) (《建立国土空间规划体系并监督实施的若干意见》) | Established a nationally unified territorial spatial planning system with clear mandates and top-level “multiple-plan integration” design. | |||
| Regulations for Implementing the Land Administration Law (2021) (《土地管理法实施条例》) | Further legalized requirements such as land-use regulation under territorial spatial planning, clarifying that where territorial spatial plans are in place, separate general land-use plans should no longer be prepared. |
Appendix A.3. Codebook and Coding Decision Rules
| Code | Indicator (Table 1) | Operational Definition | Inclusion Criteria | Exclusion Criteria | Primary/Secondary Coding and Conflict Resolution Rules (Priority) | Typical Keywords/Phrases (Search Cues) |
|---|---|---|---|---|---|---|
| C1 | Goal positioning/spatial value (goals–weights–terms) | Fix governance goals, value orientation, and priorities into comparable terms/metrics. | Goal/positioning/orientation + specified object/scope; or explicit weights/priority/indicator terms harmonization. | Slogan-only statements (e.g., “pursue high-quality development”) without a governed object or explicit terms/metrics. | If a clause also specifies procedures (V-codes), treat “why” as primary: C1 as primary, V as secondary. | goals system; overall positioning; strategic orientation; indicator system; priority; weight; unified terms |
| C2 | Baseline boundary/scope of regulated objects (object–scope–applicability) | Institutionalize the regulated object(s), scope, spatial delineation, and applicability of redlines/baselines/boundaries. | Boundary delineation, scope/object, spatial distribution, applicability; boundary adjustment conditions/exceptions. | Only says “strictly protect/hold the baseline” without object, spatial boundary, or applicability rules. | When “allow/prohibit list” or “exception approval” co-exists: C2 primary (boundary ontology), V1/V3 secondary (control/procedure). | redline delineation; three lines; boundary scope; applicable objects; core zone; buffer zone; zoning |
| C3 | Auditable trade-off rules (development–protection) | Translate development–protection conflicts into verifiable rules/thresholds rather than broad principles. | Non-avoidance demonstration; necessity thresholds; equivalency/offset; compensation; auditable trade-off rules. | Abstract phrases like “coordinate/balance” without rules, thresholds, or audit mechanisms. | If trade-off is implemented via procedures (e.g., higher-level approval/justification): C3 primary, V3 secondary; if mainly boundary + exception: C2 primary. | trade-off; necessity; non-avoidance; equivalency; offset; compensation; justification; audit |
| C4 | Core concept definitions (terms/data standards) | Unify terminology, classification standards, and data definitions to reduce divergence across agencies/levels. | Glossary/definitions; classification standards; data dictionary; consistent terms; change logs. | One-off explanatory descriptions without a standardized requirement or formalized text. | If both C1 and C4 appear: decide by clause focus—goal/terms → C1 primary; terminology/data standards → C4 primary. | definition; terminology; classification; terms; data dictionary; standards; consistency |
| R1 | Vertical mandate allocation (tiered power–responsibility list) | Clarify central–provincial–municipal/county responsibility boundaries, delegation, and transmission rules. | Decentralization/recentralization; mandate lists; delegation/authorization; boundary of responsibilities; accountability transmission. | Task assignments without mandate boundaries or authorization rules. | If accountability (V6) also appears: R1 primary (structure), V6 secondary (consequences). | tiered mandates; authorization boundary; delegation; recentering; transmission; appraisal |
| R2 | Horizontal inter-departmental coordination (platform/joint mechanism/data sharing) | Institutionalize cross-department coordination into standing mechanisms/platforms. | Joint conference; coordination platform; data-sharing catalog; joint review; minutes/resolutions. | “Strengthen coordination” without a concrete mechanism or carrier. | If clause mainly specifies project list + responsible units: R3 primary, R2 secondary. | joint mechanism; coordination platform; shared data; joint review; meeting minutes |
| R3 | Plan alignment and resource translation (constraints → projects/plans) | Translate higher-level constraints into project pipelines, annual plans, and sequencing arrangements. | Alignment tables; project pipeline; annual rolling plans; milestones; factor/implementation chain. | Vision statements without lists/sequencing/translation chain. | If mainly “project list + responsible units” → R3 primary; if mainly “monitoring/early warning/adjustment” → V5/V6 primary. | alignment; translation; project pipeline; list; annual plan; rolling; sequencing; milestones |
| R4 | Conflict coordination and adjudication (dispute-handling pathway) | Provide a procedural pathway from dispute initiation to adjudication, filing, and disclosure. | Dispute/adjudication/arbitration/review; accept–decide–file–disclose procedures. | Generic “coordinate/handle properly” without adjudication procedures. | If accountability (V6) appears: R4 primary (procedure), V6 secondary (consequences). | dispute; adjudication; arbitration; review; acceptance; filing; disclosure |
| V1 | Land-use control rules (allow/prohibit lists; zoning control) | Constrain land-use conversion and access through lists and zoning-based rules. | Allow/prohibit/negative list; zoning control; access conditions; permit checklist; conversion applications. | “Strict control/strict approval” without lists or zoning rules. | If boundary delineation (C2) also appears: C2 primary, V1 secondary; if the clause focus is access lists: V1 primary. | allow/prohibit; negative list; access; conversion; zoning control; permit checklist |
| V2 | Indicator constraint and correction entry (threshold–correction) | Convert evaluation results into triggerable correction via thresholds and defined entry points. | Thresholds; over-capacity; correction entry; deviation correction; “dual evaluation” linked to correction. | “Conduct evaluation/strengthen constraints” without thresholds or correction entry. | If both “publication” and “threshold trigger” appear: V2 primary, V5 secondary; if mainly publication/early warning: V5 primary. | threshold; deviation; correction; over-capacity; dual evaluation; rectification entry |
| V3 | Procedural triggers (exception approval/recentralization/EIA, etc.) | Turn conflict scenarios into triggerable, auditable procedures (approval/justification/EIA). | Higher-level approval; exception approval; non-avoidance demonstration; EIA trigger; flowcharts. | “Approve/strictly check” without explicit triggers and procedure nodes. | If clause focus is major projects occupying redlines/EIA triggers: V3 primary; if focus is boundary object: C2 primary, V3 secondary. | submission for approval; recentering; approval; justification; non-avoidance; EIA; trigger; procedure |
| V4 | Implementation list and sequencing (projectization) | Decompose implementation into project lists, responsibility allocation, and timelines. | Project list; milestones; annual implementation plan; rolling updates. | Directions only, without project lists and sequencing. | If clause mainly “project list + responsible units”: V4 primary; if emphasizes standing coordination platform: R2 secondary. | project list; annual plan; milestones; responsibility breakdown; rolling; sequencing |
| V5 | Monitoring, evaluation and early warning (publication–ledger–alerts) | Institutionalize monitoring/evaluation publication to create early-warning and issue-ledger entries. | Monitoring; evaluation reports; publication; early-warning lists; issue ledgers; circulars. | Internal self-assessment only; generic “strengthen monitoring” without publication/ledger mechanisms. | If thresholds trigger correction: V2 primary, V5 secondary; if mainly publication/alerts: V5 primary. | monitoring; evaluation; publication; early warning; ledger; issue list; bulletin |
| V6 | Feedback adjustment and accountability/incentives (closed-loop correction) | Specify adjustment procedures, timelines, responsible actors, and accountability/incentive arrangements. | Adjustment procedures; timelines; back-feeding updates; responsibility; accountability/audit; public disclosure; third-party evaluation. | “Adjust in due course/strengthen supervision” without process, timeline, responsibilities, or consequences. | If clause focus is adjustment flow/back-feeding: V6 primary; if focus is adjudication procedure: R4 primary, V6 secondary. | adjustment; revision; time limit; back-feeding; audit; accountability; disclosure; third-party evaluation |
Appendix A.4. Clause-Level Evidence Chain Log
| Stage | Policy ID | Clause Location | Evidence (Excerpt + Summary) | Codes (Primary + Secondary) | Evidence Strength (1–3) |
|---|---|---|---|---|---|
| I | N02 | 第 2 条 (没收范围) | 列明没收对象: 地主“土地、耕畜、农具、多余粮食及多余房屋”, 并限定“其他财产不予没收”。 | V1 (Primary) + C2 (Secondary) | 3 |
| 第 5 条 (非地主认定 + 200% 阈值) | 规定多类群体“不以地主论”, 并设置“人均不超过当地平均 200% 则保留, 超过部分得征收”, 对特殊弱势群体可酌情照顾。 | C4 (Primary) + C3 (Secondary) | 3 | ||
| 第 10 条 (接收与统一分配) | 没收征收所得由“乡农民协会接收”, 并“统一公平分配”给无地少地农民; 同时规定地主亦分得一份以维持生计。 | R3 (Primary) | 3 | ||
| 第 11 条 (分配单位 + 跨乡调剂) | 以乡/行政村为单位分配; 区/县农民协会可在乡村间“必要调剂”; 交错土地按耕种归属划归分配。 | R1 (Primary) + R3 (Secondary) | 3 | ||
| 第 31 条 (成分评定程序 + 申诉) | 阶级成分按“自报公议”民主评定, 报区政府批准; 异议者可在15日内向县人民法庭申诉并判决执行。 | V3 (Primary) + R4 (Secondary) | 3 | ||
| 条款 (互助合作组织原则) | 强调互助合作的组织方式与生产组织安排, 提出通过合作组织推动农业生产与资源配置。 | R2 (Primary) | 2 | ||
| 章节 (计划任务与空间安排) | 建设任务高度计划化, 空间安排服从国家计划与工业布局需求。 | C1 (Primary) + R1 (Secondary) | 2 | ||
| N07 | 条款 (农业发展目标与指标) | 提出农业发展总体目标与关键指标, 强调按纲要推进农业空间与生产组织。 | C1 (Primary) | 2 | |
| 条款 (区域规划编制审批) | 规定区域规划编制与审批的基本程序与责任主体。 | V3 (Primary) + R1 (Secondary) | 2 | ||
| 条款 (工作方法与组织动员) | 以“工作方法”形式规定组织动员、任务分解与执行方式。 | R3 (Primary) | 2 | ||
| 条款 (人民公社制度安排) | 提出建立人民公社的制度安排与组织结构, 强化集体化组织形式。 | R1 (Primary) + R2 (Secondary) | 2 | ||
| II | N22 | 条款 (土地利用规划工作通知) | 要求开展人民公社土地利用规划工作, 推动规划成果用于生产安排。 | R3 (Primary) | 2 |
| 条款 (三五计划安排提纲) | 提出第三个五年计划安排要点, 强调重点建设与资源配置。 | C1 (Primary) | 2 | ||
| 条款 (经济计划汇报要点) | 强调经济计划编制与执行要点, 突出计划管理与落实。 | V5 (Primary) | 2 | ||
| 总体要求 (县级土地利用总规) | 提出县级土地利用总体规划编制的基本目标、内容与方法框架。 | C1 (Primary) + C4 (Secondary) | 3 | ||
| 条款 (指标体系与控制要求) | 强调用地指标、耕地保护与用途管制要求, 形成指标约束体系。 | V2 (Primary) + V1 (Secondary) | 3 | ||
| 条款 (审批程序) | 规定规划编制、审查、批准的程序与责任主体。 | V3 (Primary) + R1 (Secondary) | 3 | ||
| 决定 (经济体制改革) | 提出经济体制改革方向, 推动计划与市场并存的资源配置逻辑。 | C1 (Primary) | 2 | ||
| 通知 (制止乱占耕地) | 强调加强土地管理、制止乱占耕地, 提出审批与处罚等措施。 | V1 (Primary) + V6 (Secondary) | 3 | ||
| 土地管理法 (1986) | 确立土地管理的法律框架, 强调耕地保护与用地审批。 | V1 (Primary) + R1 (Secondary) | 3 | ||
| 通知 (开展土地利用总规) | 明确要求开展土地利用总体规划, 规定组织实施与时间安排。 | R3 (Primary) + V4 (Secondary) | 2 | ||
| N23 | 配套规章 (同年多项) | 同年出台编制审批办法、县规程、占用税、建设用地办法等配套制度。 | C4 (Primary) + V3 (Secondary) | 3 | |
| 通知 (省级国土规划) | 强调加强省级国土规划工作, 提出组织与协调要求。 | R1 (Primary) | 2 | ||
| 全国国土总体规划纲要 (草案) | 提出全国尺度的国土总体规划框架与目标。 | C1 (Primary) | 2 | ||
| 城市规划法 (1990) | 确立城市规划法律框架, 明确规划编制、审批与实施管理。 | V3 (Primary) + V6 (Secondary) | 3 | ||
| III | N36 | 纲要 (特区城市发展) | 提出特区城市发展方向与总体定位。 | C1 (Primary) | 2 |
| 规划大纲 (社会经济发展) | 提出社会经济发展目标与空间开发需求。 | C1 (Primary) | 2 | ||
| 总规 (1986) | 形成总体空间结构与功能布局, 确立城市发展框架。 | C2 (Primary) + V1 (Secondary) | 2 | ||
| 道路交通规划 | 提出道路交通系统布局与建设安排。 | R3 (Primary) | 2 | ||
| 规划标准与准则 | 规定城市规划标准与技术准则。 | C4 (Primary) | 3 | ||
| 全国土地利用总规纲要 (草案) | 提出全国土地利用总体规划纲要框架与控制方向。 | C1 (Primary) + V2 (Secondary) | 2 | ||
| 决定 (市场经济体制) | 确立社会主义市场经济体制, 强化地方发展激励。 | R1 (Primary) | 2 | ||
| 条例 (村镇规划) | 规范村庄和集镇规划建设管理。 | V3 (Primary) | 2 | ||
| N38 | 基本农田保护条例 | 明确基本农田保护制度与管控要求。 | C2 (Primary) + V1 (Secondary) | 3 | |
| 通知 (加强城市规划) | 强调加强城市规划工作与管理。 | V6 (Primary) | 2 | ||
| 土地管理法 (1998 修订) | 强化用地审批与耕地保护, 完善土地用途管制制度。 | V1 (Primary) + V6 (Secondary) | 3 | ||
| 纲要 (2003–2020) | 提出用地总量控制、耕地保护与结构优化等约束目标。 | V2 (Primary) + C1 (Secondary) | 3 | ||
| 城乡规划法 (2008) | 扩展规划法定范围, 强调城乡统筹与实施监督。 | V6 (Primary) + R2 (Secondary) | 3 | ||
| 国务院通知 (2006–2020 纲要) | 明确全国土地利用总规实施要求与任务分解。 | R3 (Primary) + V4 (Secondary) | 2 | ||
| N40 | 主体功能区规划 | 提出主体功能分区与差别化管控导向。 | C2 (Primary) + V1 (Secondary) | 3 | |
| 深圳城市规划条例 | 确立地方规划管理制度与程序。 | V3 (Primary) | 3 | ||
| 总规 (1996) | 提出城市空间结构与功能布局调整。 | C1 (Primary) + C2 (Secondary) | 2 | ||
| IV | N41 | 深圳2030策略 | 提出长期发展战略与空间发展愿景。 | C1 (Primary) | 2 |
| 土地利用总规 (2006–2020) | 提出用地规模、结构与耕地保护控制要求。 | V2 (Primary) + V1 (Secondary) | 3 | ||
| 城市更新规划 | 提出城市更新方向与机制安排。 | R3 (Primary) + V4 (Secondary) | 2 | ||
| 总规 (2010–2020) | 提出空间结构与发展边界等总体安排。 | C2 (Primary) + C3 (Secondary) | 2 | ||
| “十二五”规划建议说明 | 提出发展目标与规划导向。 | C1 (Primary) | 2 | ||
| 新型城镇化规划 | 提出城镇化目标、空间格局与政策工具组合。 | C1 (Primary) + R2 (Secondary) | 2 | ||
| 市县“多规合一”试点通知 | 启动多规合一试点, 强调“一个平台、一张蓝图”等。 | R2 (Primary) + C4 (Secondary) | 3 | ||
| N42 | “十三五”规划建议 | 提出高质量发展与治理现代化方向。 | C1 (Primary) | 2 | |
| 深圳总规 (2010–2020) | 延续并细化城市空间结构与用地控制安排。 | C2 (Primary) + V1 (Secondary) | 2 | ||
| 城市更新办法实施细则 | 细化城市更新程序、主体责任与实施要求。 | V3 (Primary) + V4 (Secondary) | 3 | ||
| 深圳2035总规城市设计专项 | 提出面向2035的城市设计理念与空间品质导向。 | C1 (Primary) | 2 | ||
| 总论: 多规合一/规划地位 | “融合…实现‘多规合一’…对各专项规划的指导约束作用”。 | C4 (Primary) + R2 (Secondary) | 3 | ||
| 问题诊断: 碎片化与低权威 | “类型过多…重叠冲突…审批复杂…朝令夕改”。 | R1 (Primary) + V5 (Secondary) | 3 | ||
| 总体要求: 顶层设计与基础性作用 | “做好国土空间规划顶层设计…在国家规划体系中发挥基础性作用”。 | C1 (Primary) + R1 (Secondary) | 3 | ||
| 三类空间: 生态/农业/城镇 | 强调划定生态、农业、城镇三类空间并分类管控。 | C2 (Primary) + V1 (Secondary) | 3 | ||
| “三区三线”与底线约束 | 提出“三区三线”划定及严格管控要求。 | C2 (Primary) + V1 (Secondary) | 3 | ||
| V | N50 | 用途管制: 清单化与准入约束 | 强调国土空间用途管制、准入条件与清单管理。 | V1 (Primary) | 3 |
| 规划编制: 统一底图与统一标准 | 强调统一底图、统一标准、统一数据。 | C4 (Primary) | 3 | ||
| 实施监督: 全过程与信息公开 | 强调规划实施监督、监测评估与信息公开。 | V5 (Primary) + V6 (Secondary) | 3 | ||
| 评估—调整—问责闭环 | 提出建立评估、调整、问责机制。 | V6 (Primary) | 3 | ||
| 部门协同与统筹协调机制 | 强调跨部门协同、统筹协调。 | R2 (Primary) | 2 | ||
| 市级总规编制: 内容框架与成果体系 | 规定市级国土空间总体规划成果框架与编制要点。 | C4 (Primary) + V4 (Secondary) | 3 | ||
| 市级总规: 底线管控与边界表达 | 强调底线管控、边界表达、开发强度等要求。 | C2 (Primary) + C3 (Secondary) | 3 | ||
| 市级总规: 实施传导与项目化衔接 | 强调规划传导到专项/项目与年度计划。 | R3 (Primary) + V4 (Secondary) | 3 | ||
| N52 | 省级总规: 统筹与约束传导 | 规定省级国土空间规划统筹与对下传导要求。 | R1 (Primary) + C1 (Secondary) | 3 | |
| 省级总规: 指标体系与刚性约束 | 强调指标体系、底线与刚性约束。 | V2 (Primary) + C1 (Secondary) | 3 | ||
| 用途管制数据规范: 字段/口径/编码 | 规定用途管制数据字段、口径与编码标准。 | C4 (Primary) | 3 | ||
| 三区三线划定: 流程与技术要求 | 提出三区三线划定的技术路线与工作流程。 | V3 (Primary) + C2 (Secondary) | 3 | ||
| 大湾区纲要: 空间协同与要素流动 | 强调区域协同、要素流动与空间格局优化。 | R2 (Primary) + C1 (Secondary) | 2 | ||
| S17 | 广东省国土空间规划: 省级底线与传导 | 强调省域底线管控、开发保护格局与对下传导。 | R1 (Primary) + C2 (Secondary) | 2 | |
| 海岸带规划: 底线边界与例外程序 | 以生态红线/海岸带管控明确底线边界与例外程序。 | C2 (Primary) + V3 (Secondary) | 3 | ||
| 城中村整治规划: 更新与底线约束衔接 | 提出城中村整治的目标、边界与实施要求。 | C3 (Primary) + V4 (Secondary) | 2 | ||
| 深圳市国土空间总规: 统一底图与三类空间 | 强调统一底图、三类空间与底线约束。 | C4 (Primary) + C2 (Secondary) | 3 | ||
| 深圳市总规: 用途管制与准入规则 | 强调用途管制、准入约束与清单管理。 | V1 (Primary) | 3 | ||
| 深圳市总规: 监测评估与动态调整 | 提出监测评估、动态调整与纠偏机制。 | V6 (Primary) + V5 (Secondary) | 3 | ||
| 公园专项规划: 设施布局与实施清单 | 提出公园体系布局与实施项目清单。 | V4 (Primary) | 2 | ||
| 养老设施专项规划: 布局标准与供给机制 | 提出设施布局、标准与供给机制。 | C4 (Primary) + V4 (Secondary) | 2 | ||
| S15 | 医疗设施专项规划: 布局与用地保障 | 提出医疗设施布局与用地保障机制。 | R3 (Primary) + V4 (Secondary) | 2 | |
| 应急疏散救援空间规划: 风险与空间响应 | 提出应急空间布局与响应机制。 | C1 (Primary) + V4 (Secondary) | 2 | ||
| 综合交通“十四五”: 项目库与实施评估 | 提出交通项目库与实施评估安排。 | V4 (Primary) + V5 (Secondary) | 2 | ||
| 应急管理“十四五”: 能力建设与考核 | 提出能力建设任务与考核安排。 | V5 (Primary) | 2 | ||
| 城市更新和土地整备“十四五”: 任务分解与责任 | 提出更新整备任务分解、责任主体与推进机制。 | R3 (Primary) + V4 (Secondary) | 2 |
Appendix A.5. Operational Governance Toolkit Mapping
| Dimension | Indicator (Table 1) | Operational Policy Tool | Lead/Responsible Actor(s) | Trigger Condition(s) | Key Deliverable(s) |
|---|---|---|---|---|---|
| Cognition | Goal positioning; spatial value | Goals–Weights–Terms memorandum: translate multi-goals (e.g., ecological civilization vs. high-quality development) into comparable weights/priorities and indicator definitions. | Central/provincial lead agencies (e.g., MNR) + local natural resources authorities | Upstream goal adjustments; dense rollout of sectoral policies; goal conflicts across departments | Unified terms note; indicator definition sheet; goal-weight specification |
| Baseline boundary; scope of regulated objects | Applicability + adjustment conditions + exception procedures: specify which objects the redline/baseline applies to, conditions for adjustment, and how exceptions are approved. | Provincial coordination + municipal/county implementation | Boundary conflicts/encroachment; major project siting; ecological risk alerts | Applicable-object list; adjustment request template; exception procedure flowchart | |
| Auditable trade-off rules (development–protection) | Auditable trade-off institutionalization: codify development–protection trade-offs into verifiable rules/thresholds (not principle-only statements). | Provincial coordination + municipal/county execution | Control conflicts inside/outside development boundary; projects touching redlines/baselines | Trade-off clauses; audit checklist; access/admission decision sheet | |
| Core concept definitions (terms/data standards) | Glossary and data dictionary: standardize key concepts and data terms (e.g., baseline/redline/boundary; land-use types; renewal vs. land readjustment). | Provincial standardization lead + cross-department coordination | Divergent definitions across departments/regions; inconsistent data causing approval disputes | Glossary; data dictionary; terms-change log | |
| Relation | Vertical mandate allocation (tiered responsibility list) | Tiered mandates list: central/provincial focus on baseline constraints and key indicator definitions; municipal/county focus on translation into project lists and sequencing. | Central/provincial set the list + municipal/county undertake | Indicator decomposition; approval authority changes; unclear cross-level responsibilities | Mandate list (authorization boundaries); transmission rules; undertaking notes |
| Horizontal coordination; role division | Standing coordination platform (joint conference + data sharing): shift “coordination” from ad hoc meetings to institutionalized platforms. | Municipal lead + participating departments | Multi-department approval conflicts; inconsistent data terms; major project coordination | Consultation rules; agenda list; data-sharing catalog; minutes/resolutions | |
| Plan alignment; factor/resource allocation | Alignment rules + list-based translation: convert higher-level constraints into project pipeline/annual rolling plans to form a traceable chain. | Municipal/county lead implementation | Annual plan preparation; sectoral plan revisions; project pipeline updates | Project list; sequencing schedule; constraint-to-project alignment table | |
| Conflict coordination mechanism | Dispute-handling pathway (adjudication procedure): clarify “who raises–who accepts–how to decide–how to file/disclose”. | City/provincial adjudication body (as institutionally specified) | Disputes unresolved by consultation; boundary/indicator conflicts | Procedure text; decision memo template; filing and disclosure mechanism | |
| Testing | Land-use control rules | Differentiated control rules: zoning-based regulation inside/outside development boundary (e.g., green/blue lines; forest/wetland) with explicit lists. | Municipal/county execution + provincial supervision | Boundary touchpoints or land-use conversion applications | Control clauses; negative list; permit review checklist |
| Indicator constraint mechanism | Indicator constraints + correction mechanism: integrate “dual evaluation” into the evaluate–adjust–accountability loop and specify correction entry points. | Provincial coordination + municipal/county execution | Evaluations show overload/shortfalls; indicators deviate beyond thresholds | Threshold table; correction application/approval record; adjustments | |
| Implementation list and sequencing | Implementation planning tool: decompose implementation into project list and timetable to form a traceable execution chain. | Municipal/county lead | Annual rolling plans; key area programs | Project pipeline; annual implementation plan; milestone and responsibility table | |
| Monitoring/evaluation and early warning | Institutionalized publication of monitoring/evaluation: publish results regularly to create early-warning and correction entry points. | Provincial/municipal evaluation bodies | Monitoring alerts; boundary/indicator deviation | Evaluation reports; early-warning list; issue ledger | |
| Feedback adjustment procedures | Feedback correction “procedure–timeline–responsible actor”: specify adjustment workflow, correction deadlines, responsible actors, and back-feeding mechanisms. | Provincial coordination + municipal/county execution | Trigger thresholds reached; evaluation alerts; adjudication outcomes | Adjustment; process records; back-feeding update note | |
| Accountability and incentives | Accountability and incentive tools: audit/accountability rules with information disclosure, public participation, and third-party evaluation to reduce implementation risks. | Discipline inspection/audit | Overdue correction; unlawful boundary/indicator changes; major negative impacts | Accountability action; audit report; public notice; third-party evaluation report |
References
- Lin, J. Theory and Practice of National Spatial Planning. West. Hum. Settl. J. 2020, 35, 4. [Google Scholar]
- Wang, Y.; Zhang, J.; Wang, Z. Evolutionary Path and Governance Response of my country’s Spatial Planning from a Holistic Perspective. Planner 2021, 37, 11–16. [Google Scholar]
- Fan, J. The New Trend of Modernization of my country’s Spatial Governance System after the 19th National Congress of the Communist Party of China. Bull. Chin. Acad. Sci. 2017, 32, 396–404. [Google Scholar]
- Meng, P.; Wang, Q.; Lang, H.; Jiang, R. Challenges and Reform Directions of China’s National Spatial Planning under the Modernization of Spatial Governance—Reflections Based on a Series of Seminars on Key Issues of National Spatial Governance. China Land Sci. 2019, 33, 8–14. [Google Scholar]
- Ma, G. Research on Urban-Rural Integrated Planning Based on Holism. Doctoral Dissertation, Nanjing University, Nanjing, China, 2015. [Google Scholar]
- Jörgenfelt, C.; Partington, H. A critical analysis of J.C. smuts’ theory of holism. Eur. J. Integr. Med. 2019, 31, 100980. [Google Scholar] [CrossRef] [Scilit]
- Wang, H. The Scientific Construction of the Theory of Integrated Urban-Rural Planning and the Chinese Model of Urbanization. Int. Urban Plan. 2012, 27, 77–88. [Google Scholar]
- Wang, H. Habitat III, the Nature of the Middle-Income Trap and Planning Reforms in my country’s Post-Middle Development Period: A Reconsideration of Holism. Int. Urban Plan. 2017, 32, 1–25. [Google Scholar] [CrossRef] [Scilit]
- Lin, J.; Qiao, G.; Wu, Y. An Exploration of the “One Blueprint” Approach in City and County-Level Integrated Planning: A Case Study of the Integrated Planning Pilot Project in Huantai County, Shandong Province. Urban Dev. Stud. 2017, 24, 47–52. [Google Scholar]
- Zhu, X.; Cui, G.; Huang, Q. From urban-rural coordination to multi-plan integration: The origin and practice of territorial spatial planning in Zhejiang. Urban Plan. 2019, 43, 27–36. [Google Scholar]
- Yao, K.; Yang, Y. Exploration of the Coordination and Implementation Practices of Municipal-Level Territorial Spatial Planning. South. Archit. 2021, 2, 34–38. [Google Scholar]
- Zuo, W.; Tang, Y.; Chen, B. A Critical Analysis of the Fundamental Logical Relationships in Land Spatial Planning in the New Era. Planner 2019, 35, 5–13. [Google Scholar]
- Zhao, M. A Discussion on the Logic and Operational Strategies of Constructing a National Spatial Planning System. Urban Plan. Forum 2019, 4, 8–15. [Google Scholar]
- Medeiros, E. From smart growth to European spatial planning: A new paradigm for EU cohesion policy post-2020. Eur. Plan. Stud. 2017, 25, 1856–1875. [Google Scholar] [CrossRef] [Scilit]
- Albrechts, L.; Healey, P.; Kunzmann, K.R. Strategic Spatial Planning and Regional Governance in Europe. J. Am. Plan. Assoc. 2003, 69, 113–129. [Google Scholar] [CrossRef] [Scilit]
- Saizen, I.; Mizuno, K.; Kobayashi, S. Effects of land-use master plans in the metropolitan fringe of Japan. Landsc. Urban Plan. 2006, 78, 411–421. [Google Scholar] [CrossRef] [Scilit]
- Sorensen, A. Conflict, consensus or consent: Implications of Japanese land readjustment practice for developing countries. Habitat Int. 2000, 24, 51–73. [Google Scholar] [CrossRef] [Scilit]
- Brenner, N. Decoding the Newest “Metropolitan Regionalism” in the USA: A Critical Overview. Cities 2002, 19, 3–21. [Google Scholar] [CrossRef] [Scilit]
- Maantay, J. Zoning law, health, and environmental justice: What’s the connection? J. Law Med. Ethics 2002, 30, 572–593. [Google Scholar] [CrossRef] [Scilit]
- Cabanillas, F.J.J.; Aliseda, J.M.; Gallego, J.A.G.; Jeong, J.S. Comparison of regional planning strategies: Countywide general plans in USA and territorial plans in Spain. Land Use Policy 2013, 30, 758–773. [Google Scholar] [CrossRef] [Scilit]
- Zhu, Y.; Song, J.; Bai, Y. China’s Urban Regeneration Evolution from 1949 to 2022: From the Perspective of Governance Mode. Land 2024, 13, 1806. [Google Scholar] [CrossRef] [Scilit]
- Owlett, T.E.; Liu, L.; Underhill, A.P. Emerging approaches to the development of urbanization in early China. Archaeol. Res. Asia 2018, 14, 1–6. [Google Scholar] [CrossRef] [Scilit]
- Kung, J.K.S.; Lin, Y.M. The decline of township-and-village enterprises in China’s economic transition. World Dev. 2007, 35, 569–584. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Z. The Establishment of the Theory of Socialist Market Economy in 1992 and Its Rise as the Theoretical Pillar for China to Deepen Reform and Opening Up; Springer: Singapore, 2020; pp. 181–197. [Google Scholar]
- Yu, Y.; Hamnett, C.; Ye, Y.; Guo, W. Top-down intergovernmental relations and power-building from below in China’s urban redevelopment: An urban political order perspective. Land Use Policy 2021, 109, 105633. [Google Scholar] [CrossRef] [Scilit]
- Liu, Y.; Zhou, Y. Territory spatial planning and national governance system in China. Land Use Policy 2021, 102, 105288. [Google Scholar] [CrossRef] [Scilit]
- Xiong, J.; Yue, W.; Xia, H.; Wang, T.; Liu, Y.; Pijanowski, B.C. Will China’s territorial spatial planning policies enhance land use sustainability? An integrated assessment under global environmental change. Resour. Environ. Sustain. 2025, 21, 100228. [Google Scholar] [CrossRef] [Scilit]
- Xiang, B.; Chen, Y.; Zhang, Y. Effects of the pilot policy on integrated urban-rural development in China: A quasi-natural experiment analysis. Cities 2026, 168, 106420. [Google Scholar] [CrossRef] [Scilit]
- Xin, S.; Qian, H. From Urban Planning to Territorial Spatial Planning: The Evolution of China’s Planning System and the Persistent Barriers to Urban–Rural Integration. Land 2025, 14, 1520. [Google Scholar] [CrossRef] [Scilit]
- He, J.; Tan, Y. Evolution logic of urban spatial growth governance and its enlightenment in China: From a perspective of spatial governance. J. Urban Manag. 2025, 14, 590–606. [Google Scholar] [CrossRef] [Scilit]
- Yu, P.; Yung, E.H.K.; Chan, E.H.W.; Wong, M.S.; Wang, S.; Chen, Y. An integrated approach for examining urban fragmentation in metropolitan areas: Implications for sustainable urban planning. J. Clean. Prod. 2023, 419, 138151. [Google Scholar] [CrossRef] [Scilit]
- Luan, C.; Liu, R.; Peng, S. Land-use suitability assessment for urban development using a GIS-based soft computing approach: A case study of Ili Valley, China. Ecol. Indic. 2021, 123, 107333. [Google Scholar] [CrossRef] [Scilit]
- Tang, S.Y. Rethinking local and regional governance in China: An institutional design and development perspective. Urban Gov. 2021, 1, 51–58. [Google Scholar] [CrossRef] [Scilit]
- Lee, C.C.; Qian, A. Regional differences, dynamic evolution, and obstacle factors of cultivated land ecological security in China. Socio-Econ. Plan. Sci. 2024, 94, 101970. [Google Scholar] [CrossRef] [Scilit]
- Lv, T.; Zeng, C.; Lin, C.; Liu, W.; Cheng, Y.; Li, Y. Towards an integrated approach for land spatial ecological restoration zoning based on ecosystem health assessment. Ecol. Indic. 2023, 147, 110016. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Q.; Tang, F.; Chen, H.; Li, F.; Chen, Z.; Jiao, Y. Assessing landscape fragmentation and ecological connectivity to support regional spatial planning: A case study of Jiangsu province, China. Ecol. Indic. 2024, 162, 112063. [Google Scholar] [CrossRef] [Scilit]
- Wang, S.; Yao, W.; Ma, Y.; Shang, E.; Zhang, S.; Chen, F.; Zeng, Y. Optimizing natural boundary definition and functional zoning in protected areas: An integrated framework encompassing species, landscapes and ecosystems. Glob. Ecol. Conserv. 2024, 49, e02781. [Google Scholar] [CrossRef] [Scilit]
- Lin, J.; Wu, T.; Zhang, Y.; Zhao, Y. Reflections on a unified land spatial use control system. J. Nat. Resour. 2019, 34, 2200–2208. [Google Scholar]
- Ye, Z.; Gao, H.; Wu, W. Local government capacity and response strategies to central policy piloting goals: A case study of China’s new-type urbanization plan. Humanit. Soc. Sci. Commun. 2024, 11, 1648. [Google Scholar] [CrossRef] [Scilit]
- Wiegant, D.; Dewulf, A.; Van Zeben, J. Alignment mechanisms to effectively govern the sustainable development goals. World Dev. 2024, 182, 106721. [Google Scholar] [CrossRef] [Scilit]
- Wei, Y.H.D. Restructuring for growth in urban China: Transitional institutions, urban development, and spatial transformation. Habitat Int. 2012, 36, 396–405. [Google Scholar] [CrossRef] [Scilit]
- Wang, J.; Lin, Y.; Glendinning, A.; Xu, Y. Land-use changes and land policies evolution in China’s urbanization processes. Land Use Policy 2018, 75, 375–387. [Google Scholar] [CrossRef] [Scilit]
- Yu, L.; Chen, C.; Jiang, T. Dilemmas, Transformations, and Reflections on Spatial Planning. Urban Plan. 2020, 44, 15–21. [Google Scholar]
- Wu, J.; Song, Y.; Lin, J.; He, Q. Tackling the uncertainty of spatial regulations in China: An institutional analysis of the “multi-plan combination”. Habitat Int. 2018, 78, 1–12. [Google Scholar] [CrossRef] [Scilit]
- Wu, J.; Guo, Q.; Hewings, G.J.D. Land regulating economy as a policy instrument in urban China. Cities 2019, 94, 225–234. [Google Scholar] [CrossRef] [Scilit]
- Xu, F.; Wang, Z.; Chi, G.; Zhang, Z. The impacts of population and agglomeration development on land use intensity: New evidence behind urbanization in China. Land Use Policy 2020, 95, 104639. [Google Scholar] [CrossRef] [Scilit]
- Du, L.; Wei, M.; Zhang, S.; Pan, J. Unveiling the policy intervention effects of natural resource regulation on firm-level pollution emissions: Evidence from China’s restrained land supply. Resour. Policy 2023, 86, 104081. [Google Scholar] [CrossRef] [Scilit]
- Ma, J.; Tian, L.; Zhang, Y.; Yang, X.; Li, Y.; Liu, Z.; Zhou, L.; Wang, Z.; Ouyang, W. Global property rights and land use efficiency. Nat. Commun. 2024, 15, 8525. [Google Scholar] [CrossRef] [Scilit]
- Qu, Y.; Wang, S.; Tian, Y.; Jiang, G.; Zhou, T.; Meng, L. Territorial spatial planning for regional high-quality development—An analytical framework for the identification, mediation and transmission of potential land utilization conflicts in the Yellow River Delta. Land Use Policy 2023, 125, 106462. [Google Scholar]
- Cheng, P.; Fan, Y.; Tang, H.; Liu, K.; Wu, S.; Zhu, G.; Jiang, P.; Guo, W. Research review on land development rights and its implications for China’s national territory spatial planning. Heliyon 2024, 10, e35227. [Google Scholar] [CrossRef] [Scilit]
- Chen, F.; Liu, Y. An integrated analysis framework for territorial space governance: Combining land use classification and functional evaluation toward spatial zoning. Habitat Int. 2025, 166, 103572. [Google Scholar] [CrossRef] [Scilit]




| Dimension | Indicator 1 | Indicator 2 | Indicator 3 | Indicator 4 | Indicator 5 | Indicator 6 |
|---|---|---|---|---|---|---|
| Cognitive level | Goal positioning | Spatial values | Baseline boundaries | Development–protection trade-offs | Scope of objects | Core concept specification |
| Relational level | Vertical allocation of administrative powers | Horizontal inter-departmental coordination | Division of roles among actors | Inter-level plan alignment | Allocation of key resources | Conflict coordination mechanisms |
| Testing level | Land-use control rules | Indicator-based constraint mechanisms | Implementation checklist and sequencing | Monitoring–evaluation and early warning | Feedback and adjustment procedures | Accountability and incentive mechanisms |
| Framework Element | Transferability | China-Specific Attributes and Calibration |
|---|---|---|
| Diagnostic logic | Diagnostic grammar: goal/boundary → authority–responsibility → feedback/correction | Dominant mechanisms vary (admin/legal/market/community); avoid treating China as default baseline |
| Cognitive level | Goals and objects; prioritization; trade-off sources | Macro narratives → indicatorized tasks; calibrate to national public values and goal system |
| Relational level | Coordination structures; transaction costs; cross-scale and multi-actor bargaining | Hierarchical transmission; central–local incentives; map to federalism/local autonomy/polycentricity |
| Testing level | Closed-loop capacity (evaluation–adjustment–accountability) | Inspection/assessment + land-use control + baseline constraints; substitute functionally equivalent mechanisms |
| Methods and evidence | Clause-level policy coding; cross-stage comparison; replicable template | Avoid literal translation (e.g., “multi-plan integration”, “five levels & three categories”); re-code via functional equivalence |
| Theory | Core Focus | Key Mechanism | Strength | Limitation | Governance Output |
|---|---|---|---|---|---|
| Systems theory | Systemic wholeness | Coupling and feedback | Strong holistic orientation | Lacks criteria for an authority–instrument closed loop | Explains system coupling |
| CAS | Evolution and emergence | Self-organization and adaptation | Strong in explaining complexity | Lacks built-in consistency testing and closed-loop outputs | Explains evolutionary mechanisms |
| Holism | Organic integration | Cognition–relation–testing | Operational closed loop | Requires clear evidence units and decision rules | Consistency testing and integration pathway |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Share and Cite
Hong, C.; Zhang, Z.; Zhu, X.; Zeng, P. Holism and Territorial Spatial Planning Reform in China: Evolutionary Challenges and Governance Measures Under Chinese-Style Modernization. Land 2026, 15, 347. https://doi.org/10.3390/land15020347
Hong C, Zhang Z, Zhu X, Zeng P. Holism and Territorial Spatial Planning Reform in China: Evolutionary Challenges and Governance Measures Under Chinese-Style Modernization. Land. 2026; 15(2):347. https://doi.org/10.3390/land15020347
Chicago/Turabian StyleHong, Chenyuxuan, Zichun Zhang, Xigang Zhu, and Peng Zeng. 2026. "Holism and Territorial Spatial Planning Reform in China: Evolutionary Challenges and Governance Measures Under Chinese-Style Modernization" Land 15, no. 2: 347. https://doi.org/10.3390/land15020347
APA StyleHong, C., Zhang, Z., Zhu, X., & Zeng, P. (2026). Holism and Territorial Spatial Planning Reform in China: Evolutionary Challenges and Governance Measures Under Chinese-Style Modernization. Land, 15(2), 347. https://doi.org/10.3390/land15020347