Joshi, D.; Gholami, H.; Mohapatra, H.; Ali, A.; Streimikiene, D.; Satpathy, S.K.; Yadav, A.
The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty. Sustainability 2022, 14, 9819.
https://doi.org/10.3390/su14169819
AMA Style
Joshi D, Gholami H, Mohapatra H, Ali A, Streimikiene D, Satpathy SK, Yadav A.
The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty. Sustainability. 2022; 14(16):9819.
https://doi.org/10.3390/su14169819
Chicago/Turabian Style
Joshi, Devendra, Hamed Gholami, Hitesh Mohapatra, Anis Ali, Dalia Streimikiene, Susanta Kumar Satpathy, and Arvind Yadav.
2022. "The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty" Sustainability 14, no. 16: 9819.
https://doi.org/10.3390/su14169819
APA Style
Joshi, D., Gholami, H., Mohapatra, H., Ali, A., Streimikiene, D., Satpathy, S. K., & Yadav, A.
(2022). The Application of Stochastic Mine Production Scheduling in the Presence of Geological Uncertainty. Sustainability, 14(16), 9819.
https://doi.org/10.3390/su14169819