1. Introduction
The global automotive landscape is experiencing a rapid and transformative shift towards electric vehicles (EVs), driven by environmental concerns [
1] and technological advancements [
2]. Researchers increasingly recognize the decarbonization of the energy grid as vital, with electric vehicles playing a crucial role in this transition [
3]. Because EVs often remain stationary for significant periods of time [
4], they offer an opportunity to use their batteries as flexible energy resources when connected to the grid [
5,
6].
Bidirectional charging is essential for realizing this potential, allowing EVs to contribute to the grid beyond merely fulfilling transportation needs. The functionality extends valuable flexible consumer services [
7,
8] beyond flexibly charging the energy needed for transportation [
9]. This research specifically focuses on understanding and mitigating control delays within state-of-the-art bidirectional charging systems.
The integration of EVs into grid services requires a sophisticated control architecture, illustrated in
Figure 1. External controllers—such as transmission system operators (TSOs), distribution system operators (DSOs), home energy management systems (HEMS), aggregators, virtual power plants (VPPs), or balancing responsible parties (BRPs)—monitor grid conditions and issue control signals to the electric vehicle charging system (EVCS), which consists of an EV paired with an electric vehicle supply equipment (EVSE), through the charging infrastructure. Acting on real-time measurements requires a fast communication path from measurement to action, which involves optimization in all parts of the control loop [
10]. Recent reviews have highlighted the growing complexity of EV–transportation–grid integration, emphasizing the need for accurate modeling and optimization strategies to support smart management and grid services [
11]. Ecosystem architectures which integrate communication between the necessary market participants are currently being developed within projects such as Coalition of the Willing on Bidirectional Charging [
12], EU Sustainable Transport Forum [
13], International Energy Agency (IEA) task 53—Interoperability of Bidirectional Charging (INBID) [
14]. The architectures aims to integrate the control flow, as shown in
Figure 1, along with monetary and auxilary data flows. In this paper, the focus will be on the reaction time of the EVCS to a power setpoint change initiated by an external entity. As shown in
Figure 2, the fundamental component of an interoperable infrastructure is the hardware of the combined EVCS.
Bidirectional charging transforms an EV into a versatile energy asset, extending the energy limitations of EVs beyond the coverage of driving needs [
15]. Researchers have investigated a range of applications—from local energy optimization to grid-scale support—using both unidirectional [
8] and bidirectional [
16,
17] technology. In Vehicle-to-Grid (V2G) applications, a fleet of electric vehicles can collectively support the stability and efficiency of the electrical grid. This includes providing frequency services to balance supply and demand, such as frequency regulation, offering voltage support to maintain grid quality, and alleviating network stress through congestion management techniques like peak shaving. In contrast, vehicle-to-home/building (V2H, V2B) applications focus on local energy optimization behind the meter. These allow an EV owner to increase the self-consumption of renewable generation on-site or to perform price arbitrage by storing inexpensive off-peak energy and discharging it to power a home or building during high-cost periods.
Depending on the specific use case, the functional requirements of EVs and EVSE must progressively increase.
Figure 2 illustrates a development framework outlining the essential steps toward full V2G integration, ranging from basic hardware readiness to complete interoperability with third-party systems. This progression includes hardware capabilities, communication protocols, grid compliance, and interoperability testing. Intermediate stages may already support applications such as Vehicle-to-Load (V2L) and Vehicle-to-Home (V2H), serving as foundational milestones toward comprehensive grid interaction.
Different applications impose distinct response requirements on bidirectional charging [
18,
19]. In the DK-2 zone, ancillary services require power adjustment within 1.3 s for FFR, and for FCR-D, a reaction within 2.5 s and 86% of the bid power within 7.5 s. In DK-1, connected to continental Europe, FCR-D requirements are slightly relaxed: initial response within 2 s, 50% within 15 s, and full activation in 30 s [
20].
Figure 3 illustrates how faster EVCS response broadens the range of feasible use cases and enhances economic potential. This study evaluates the responsiveness of bidirectional systems to enable broader service participation.
Europe is moving towards standardization with the ‘Combo 2’ combined charging system (CCS2) plug [
21,
22] and ISO 15118–20 for bidirectional charging [
23]. The ISO 15118 standard family defines the communication interface between an Electric Vehicle Communication Controller (EVCC) and a Supply Equipment Communication Controller (SECC), enabling intelligent charging. ISO 15118–1 [
24] outlines general use cases, including bidirectional power transfer (BPT), and covers all (open systems interconnection) OSI layers. ISO 15118–2 [
25], covering layers 3–7, specifies application-level protocols but omits BPT support. ISO 15118–3 [
26] addresses layers 1–2, using Power Line Communication over the Control Pilot pin. The recently released ISO 15118–20 [
27] is an updated second-generation Part 2 that adds BPT functionality to the stack. This technical specification diverges from the early bidirectional implementations using CHAdeMO, which in Denmark continues to provide frequency support via normal frequency containment reserve (FCR-N) [
28]. This standardization effort, supported by initiatives like the Coalition of the Willing on Bidirectional Charging, the EU Sustainable Transport Forum, D4E, CharIn and IEA Task 53, aims to ensure interoperability and widespread adoption of bidirectional charging technology. Interoperability across the entire EV charging ecosystem, including bidirectional charging, is a key goal for a sustainable and controllable mass of EVs [
29,
30]. This paper evaluates the response time of bidirectional hardware compliant with ISO 15118–20, focusing on grid-related performance parameters. The objective is to validate the consistency of the three foundational steps illustrated in
Figure 2, thereby advancing toward full interoperability.
This study investigates the dynamic performance of ISO 15118–20 DC charging to evaluate the applicability for grid services, with a specific focus on:
Characterizing control delays and response times for various power transitions.
Observe and characterize EVCS behavior during power flow reversal (PFR) as a fundamental operational aspect of bidirectional charging.
Provide black box parameters for further (aggregation) modelling studies.
Comparison of CCS performance with existing and historic CHAdeMO implementations.
This paper is organized as follows:
Section 1.1 provides an extended background on bidirectional charging standards with CCS2 and CHAdeMO.
Section 2 outlines the experimental setup and methodology used to evaluate EVCS response dynamics.
Section 3 presents the results, including time-series analyses and key performance indicators across configurations.
Section 4 discusses the implications of the findings, including communication delays, ramping behavior, and PFRs. Finally,
Section 5 concludes the paper and suggests directions for future research.
1.1. Extended Background
To contextualize the research objectives, this section provides a background on the fundamental differences between the two bidirectional charging standards mentioned above. Focus will be given to the dynamic communication between the EVCC and the SECC, which allows real-time control capabilities essential for grid service applications.
1.1.1. CCS2 and ISO 15118–20 DC
ISO 15118–20 defines a client-server communication model for DC charging, where the EVCC acts as the client and the SECC, part of the EVSE, serves as the server. Before initiating active power transfer, several prerequisites must be fulfilled: a secure Transport Layer Security (TLS) 1.3 session, successful session setup, authorization, and completion of DC_ChargeParameterDiscovery and PowerDelivery(Start). Once these steps are completed and the contactors are closed, the system enters dynamic DC mode. In this mode, the SECC is granted more control authority, allowing it to respond to external grid signals while maintaining coordination with the EV. The EVCC cyclically sends DC_ChargeLoopReq messages every 100–500 ms, containing its current status, target values, and operational limits. The SECC responds with DC_ChargeLoopRes, which includes its status, allowed limits, and the proposed EVSETarget.
When an external controller issues a new setpoint, the SECC first validates and stages it based on grid constraints, connector ratings, and ramping policies. This setpoint is not directly applied to the power modules. Instead, the SECC awaits the next cyclic request from the EVCC. Upon receiving it, the SECC embeds the new target in its response. The EVCC then checks feasibility—consulting battery management and thermal systems—and either accepts or rejects the target. If accepted, the SECC applies ramping constraints (e.g., respecting ramping rates) before forwarding the setpoint to the power modules. The modules report actuals and tracking status, and further adjustments may be negotiated through continued message exchange.
Figure 4 illustrates this communication flow, emphasizing the layered validation and synchronization required for safe and flexible power transfer in dynamic mode.
1.1.2. CHAdeMO DC
CHAdeMO has proven its reliability in bidirectional applications through extensive testing and successful real-world deployments [
31]. It consistently delivers grid services like frequency regulation and peak shaving [
15], with studies such as Zehinno’s confirming its strong performance [
32].
CHAdeMO communication operates over the controller area network (CAN) protocol, enabling real-time data exchange between the EV and the EVSE during DC charging. The protocol has the EVSE acting as the controller and the EV as the follower. During an active charging session, the EV continuously sends status messages to the EVSE. Based on this feedback, the EVSE dynamically adjusts the output current and voltage to optimize charging performance and ensure safety.
A cyclic exchange of CAN frames, typically every 100 ms, regulates the power in real-time. The EVSE sends a charging command frame specifying the desired current and voltage, and the EV responds with a charging status frame that confirms whether it can meet the request or requires an adjustment. This loop enables fine-grained control of charging power, allowing for features such as power ramping, thermal management, and state-of-charge-based modulation. For bidirectional power flow, the same communication structure is used to reverse the power flow, with the EVSE requesting discharge parameters and the EV confirming its capability and readiness.
2. Materials and Methods
To evaluate the dynamic response of a bidirectional EVCS under various control scenarios, a series of controlled experiments were conducted using the Watt & Well bidirectional DC EVSE in grid-following BPT mode with AC/DC conversion happening off-board. The setup includes two 11 kW Bidirectional Modular Power Unit (BMPU) modules from Watt & Well configured via the peripheral expander board (EVIX) to support both CCS2 with ISO 15118–20 and CHAdeMO protocols. The Keysight Charging Discovery System (CDS) and SL1800A Regenerative DC Emulator were used to emulate an electric vehicle, allowing precise control over battery voltage and communication behavior.
Figure 5 shows the physical test setup as deployed during the experiments.
2.1. KPIs for Testing
This paper highlights the power response of a bidirectional EVCS to externally issued setpoint changes entering the system boundary. For fast services, anticipating the delay between issuing a command and observing the response is essential.
Figure 6 presents key performance indicators (KPIs) that support detailed modeling, characterize the system’s dynamic behavior, and identify opportunities for improvement within the EVCS.
The KPIs used to measure the system’s performance are defined below.
Communication and Control Delay (
): This measures the time from when the system provides a command across the EVCS boundary in
Figure 1 until the grid connection of the EVCS shows the first reactions. This parameter signifies the time it takes for the EVCS to process the setpoint signal and conduct internal coordination between components.
Converter Ramping Time (): The time required for the EVCS to reach after departing from the previous current . This parameter is influenced by the power electronics used.
Converter Ramping Rate (): The rate at which power changes during the ramping phase, used to compare different values. For the sake of simplicity, are used interchangeably where is the battery voltage.
Total Reaction Time (): The combined time of and , representing the overall delay from when a setpoint is issued until the power output stabilizes.
The response is decomposed into a delay component () and a ramp component (), each stemming from distinct subsystems. Optimizing involves improving communication protocols and high-level control logic, whereas depends on the low-level control of converter hardware. This separation enables targeted optimization and supports linear modeling of EVCS behavior. The delay reflects protocol-dependent communication latency and control system safety margins, whereas hardware dynamics govern the ramp time. This decomposition provides a practical approximation for further analytical modeling.
2.2. Test Procedure
To quantitatively evaluate the KPIs defined in
Section 2.1, a standardized test procedure was developed and executed. The test sequence for each run, illustrated in
Figure 7, was explicitly designed to generate a comprehensive dataset that captures the dynamic behavior of the EVCS. Drawing inspiration from prior research on CHAdeMO dynamics by Zecchino et al. [
32], the sequence is structured to assess performance across various critical scenarios, including simple step changes in the current setpoint, and power flow reversal (PFR) events. A priming period for the run ensures that the previous power flow direction of each step is known. Preliminary tests showed that a 5-s interval between setpoint changes was sufficient to stabilize the current.
Three independent runs were performed for each configuration, ensuring repeatability and identifying potential outliers. The configuration encompassed a range of operational modes and hardware setups to analyze the system’s flexibility and performance under different conditions. It is essential to note that while the EV emulator, CDS, enabled the precise manipulation of voltage to simulate specific battery behaviors, the tests involving real Electric Vehicles (EVs) were subject to the vehicle’s actual battery voltage.
Figure 7 illustrates the setpoint sequence transmitted to the EVCS during each iteration. It should be noted that the two steps
RPT to FPT and
FPT to RPT perform a PFR, as the power flow direction changes. What is not so obvious is that
0 to RPT_1 is also a PFR as the EVCS, even though it has no active power flow, remains in a state of forward power transfer (FPT) from the previous step until the set point is actioned.
The tested configurations are:
CDS–400V-S1–11kW: A single BMPU connected through CCS2 to the CDS, at .
CDS–400V-P2–22kW: Both BMPUs operating in parallel, connected to the CDS at to achieve charging power up to 22 kW.
CDS–800V-S2–22kW: Both BMPUs operating in series, connected to the CDS at 800 V to evaluate high-voltage DC charging performance.
CDS–575V-S2–22kW: Both BMPUs in a series configuration, connected to the CDS at an intermediate voltage of 575 V.
CDS–575V-S2–10kW: Both BMPUs in series connected to the CDS at 575 V, with the EVSE control limiting power to 10 kW.
EV9–575V-S2–10kW: A real-world test with both BMPUs in series, connected to a Kia EV9 with and via a CCS2 interface, EVSE control limiting power to 10 kW.
LEAF–385V-S1–11kW: A CHAdeMO protocol test using a single BMPU connected to a Nissan Leaf, with and .
was measured before the test runs and is assumed constant throughout the 70-s testing period. This assumption is justified by the relatively low charging currents and the negligible change in state of charge (SOC), i.e.,
, as illustrated in
Figure 7.
To estimate the voltage deviation caused by the charging currents, we apply the methodology from [
33], using the following expressions:
where the assumed per-unit internal resistance of the battery is
.
Table 1 summarizes the resulting voltage deviations for the two vehicles under test.
As shown, the voltage deviation due to charging currents of a maximum of 18 A (KIA EV9) and 31 A (Nissan Leaf) remains within . The specific hardware components used to realize these test configurations are detailed in the subsequent section.
2.3. Test Setup
The experimental setup consists of three main subsystems: the EVSE, the control system, and the EV. The tests performed revolve around the Watt & Well bidirectional DC EVSE in multiple configurations connected to both the CDS and different EVs, as shown in
Figure 8.
The BMPUs are capable of up to 10.5 kW of FPT—charging and 11 kW of reverse power transfer (RPT)—discharging. The converter can operate at up to 500 V DC and up to 30 A of FPT current or 32 A of RPT current [
34]. They are connected on the AC side to a 3-phase 400 V grid through a CEE plug, and on the DC side to the EVIX board, which is connected to the EVs through the CCS2 or CHAdeMO connectors. The EVIX board contains contactors that modularly configure the BMPUs in parallel, series, or solo connection to either the CCS2 or CHAdeMO DC connections. The power modules are controlled from the electrical vehicle interface (EVI) boards, where A controls the CCS2 connector and B controls the CHAdeMO connector and communicates internally on a CANopen network [
35]. The EVI boards are connected to the Raspberry Pi, which runs the sequence described in
Figure 7 to send automated signals mimicking the EVI browser graphical user interface (GUI). A PC is further used to provide initial control of the test, set power limits, and monitor the charging process through the provided EVI browser GUI, as outlined by Sevdari [
36].
The KIA EV9, Nissan Leaf, or CDS are then connected to the EVSE. The CDS is a Keysight SL1040A hardware emulator (with the SL1550A EV–EVSE Charging Communication Interface Tester for ISO 15118–20 and SL1800A Regenerative DC Emulator) that mimics the behavior of an EV battery and communicates on the CP line via ISO 15118–20 for these tests. The KIA EV9 and Nissan Leaf are real EVs equipped with CCS2 and CHAdeMO plugs, respectively, and are used to validate the performance of the EVSE in real-world conditions. The Kia EV9 used for the test was a pre-production version operating with ISO 15118–20.
TLS 1.3 was disabled on both ends during all CCS2 testing, as the required public key infrastructure (PKI) is not yet fully integrated or openly supported by available equipment. While TLS is mandatory for full ISO 15118–20 compliance, its role as a message encryption layer is assumed to have negligible impact on the response dynamics of active power transfer sessions, since key exchange and authentication occur prior to charging. Consequently, the encryption/decryption process introduces only minimal latency during the charging phase. Although ISO 15118–20 mandates mutual authentication via TLS 1.3 and secure certificate exchange, widespread interoperability rermains pending. The PKI ecosystem remains under development, and most OEMs and EVSE manufacturers have yet to implement or expose the necessary certificate management interfaces [
37,
38].
2.4. Measurement Setup
The measurement setup was designed to capture both the communication and power flow changes crossing the EVCS boundaries (see
Figure 1) in high resolution. For the measurements, a Keysight Oscilloscope is introduced in
Figure 9 as the primary measurement device, measuring the DC side current to analyze the direct response of the charging system. The DC current was sampled at 1 kHz, providing high-resolution data of the power flow dynamics. To ensure accurate timing of measurements, the Raspberry Pi sets an output of a general-purpose input/output (GPIO) pin high to trigger the oscilloscope measurement after receiving confirming feedback that the EVI board has received the setpoint change. This approach eliminates potential synchronization uncertainties in the communication chain.
2.5. Post Processing
Post-processing was performed using measurements of GPIO signals and DC currents captured via an oscilloscope. The time points
and
in
Figure 6 were defined as the first and last measurements where the current deviated by more than 5% from the initial (
) and final (
) steady-state levels, respectively. Importantly, the absolute deviation was considered, under the assumption that any significant change—regardless of direction—indicates successful communication processing.
4. Discussion
To better understand the performance of the EVCS, this section seeks to linearize the temporal response observed in the time series data. The response observed in
Figure 11 can be assumed to be piecewise linear, with initial delays caused by communication and control latencies, followed by a ramping phase influenced by configuration and power setpoints. To isolate communication delays and ramping rates, transitions involving power flow reversal (PFR)—as defined in
Section 2.2—are excluded from the initial analysis. These PFR transitions deviate significantly from ideal behavior and will be discussed separately. Finally, the difference between the CCS2 and CHAdeMO results will be highlighted and compared to previous research on the same topic.
4.1. Isolating Communication Delay
To determine the pure communication delay, a systematic analysis was performed on the raw measurement data,
, which includes both communication and control system latencies. The total measured time, from the dispatch of a control signal to an observed reaction of the converter, encompasses not only the communication between components of the EVCS (
Figure 8) but also intentional control delays, which appear to be dependent on the specific type of power transition. To isolate the communication delay (
), it is necessary to exclude measurements where control system delays are a significant and variable component, which is seen in PFR transitions.
The remaining
measurements, which correspond to transitions that do not involve a PFR, are considered to be representative of the actual communication delay. These filtered data points were then aggregated to compute the mean and coefficient of variation (CV), standard deviation normalized with mean, providing a statistically robust measure of the typical communication latency within the system, provided as
in
Table 2.
4.2. Converter Ramping Rate
Following the isolation of communication delays, this section focuses on the ramping behavior of the EVCS. The nature of How the power ramping scales is a critical parameter for grid-interactive applications, and understanding its dynamics is essential for accurate modeling and control.
From the data of
Figure 14 the performance of the converters alone is summarized into
which again excludes the PFR transitions. The converters’ performance is also shown in
Table 2 as
, and the CCS2 performs 50% better than with the CHAdeMO.
Interestingly, parallel stacking of BMPUs in the 400 V configuration does not lead to a proportional increase in ramping rate. The ramping behavior remains nearly identical to that of a single module, indicating that the ramping rate is not a function of nominal power capacity but rather constrained by shared control logic or communication bottlenecks. This suggests that the system’s ramping capability is limited by factors other than available power hardware, such as internal coordination delays or firmware limitations.
These findings imply that while power scaling through parallelization increases nominal capacity, it does not enhance dynamic response. Therefore, for applications requiring fast power modulation, higher-voltage architectures are preferable.
4.3. Power Flow Reversal Delays
In the previous sections, the additional delays observed for steps including PFR of the converters were neglected. However, the transition from consuming to producing power (or vice versa) is an essential aspect of bidirectional EVCS performance and the results showed a sizeable impact on the dynamics. This performance gap can be attributed to the delay imposed by the multi-layered control stack (Supervisor, Plug Module, Chipset, Power Converter) required for safe and coordinated operation. As the PFR delay is observed in the
for
0 to RPT_1 and
RPT to FPT, but more pronounced in the
for
FPT to RPT, we will investigate the overhead PFR time from the complete response time:
. With the data availible we can determine the
by subtracting
of non PFR steps from the three PFR steps:
In Equations (4) and (5) the communication,
, is included in both subtractions and thus it is added again as
for the given protocol from
Table 2. The results of this analysis are summarized in
Table 3, which presents the
metrics for each configuration. The values indicate the additional time required for the EVCS to transition between power flow states, highlighting the impact of PFR on overall system responsiveness.
Within the table, the values for are presented for each configuration, showing the time taken to transition between different power flow states. The results indicate that PFR delays, , range from 0 to 1.7 s, depending on the configuration and power level. A horizontal comparison across configurations reveals interesting patterns. For instance, transitions from FPT to RPT appear consistently faster than other transitions.
It is important to note that the observed delays during power flow reversal do not originate from the internal dynamics of the BMPU hardware. According to the BMPU-R2 specification datasheet [
34], the total delay from receiving a CANbus message to reaching a new setpoint is at most 750 ms, independent of the magnitude or direction of the setpoint change. This strongly suggests that the additional delay observed during PFR transitions is a system-level phenomenon, primarily governed by the SECC controller and the layered communication logic (Supervisor, Plug Module, Chipset, Power Converter) of the specific EVSE. This interpretation is further supported by the fact that configurations involving stacked BMPUs—requiring more coordination across modules—exhibit extended PFR delays, indicating that synchronization and supervisory control overheads are the dominant contributors.
4.4. Comparison with CHAdeMO
Table 2 compares dynamic performance of the Watt & Well EVSE operated with CCS2 and CHAdeMO, and positions these results against previous studies [
32]. Overall, both the modern communication stacks show improvements over the 2018 CHAdeMO 10 kW Magnum Cap V2G system as
is reduced from 4 s to approximately 0.4–0.5 s. Similarly, the ramping capability has increased even when considering the higher nominal power of the Watt & Well EVSE, indicating substantial advances in controller design and implementation. Between the two protocols, CCS2 shows lower communication latency and faster ramping. However, the overall transition time
remains similar in
Table 2, as the calculations of CCS2 include measurements of two BMPUs with a 20 kW nominal power, inducing longer PFR intervals and thereby offsetting its advantages.
Looking at the coefficients of variation, it can be observed that there is an overall slightly higher variation in the CCS2, since six different configurations are considered, whereas CHAdeMO only includes one. Communication and delay CVs are near unity for both protocols, reflecting the cyclic communication initiation actions discussed peviously. By contrast, CCS2’s PFR CV (0.312) is substantially lower than CHAdeMO’s (0.679), suggesting tighter cyclic communication between the EVCC and SECC. Still, the dominant trend is clear: modern implementations dramatically outperform early systems, with CCS2 trading faster communication and stronger converter ramps for a longer, but more consistent, PFR phase. Yet, the most notable improvements stem from refined converter control, reflecting the intense research and development efforts in recent years [
42].
These findings have important implications for grid-interactive applications. The reduced communication delays and enhanced ramping capabilities of modern EVCS enable more responsive and reliable participation in ancillary services. However, the inherent PFR delays must be carefully considered in system design and operation, as they represent a non-negligible overhead that can impact overall responsiveness. Future work should explore methods to mitigate PFR delays in fast grid service provision, focusing on two approaches: optimizing the EVSE control system to reduce PFR response time, or integrating the observed delays into the aggregated control of multiple EVCS to ensure that individual units do not hinder time-critical grid responses.
4.5. Discussion of Method
The experimental method provided clear and reproducible insights into EVCS dynamics, but it has limitations that affect interpretation. Most critically, the timing reference relies on the Raspberry Pi pulling a GPIO high only after it receives confirmation that the EVI accepted the setpoint. Consequently, the measured delay represents a lower bound, as the actual communication latency can be higher. Adding round-trip timing measurements at both ends would provide an accurate decomposition of pure communication latency.
The measurements were intentionally focused on the DC side to capture the converters’ direct response. For grid-level implications, however, AC-side current and real-time battery voltage levels should also be recorded. AC measurements quantify auxiliary and conversion losses, and simultaneous voltage logging enables precise power calculations, eliminating the need to assume a constant battery voltage.
Test coverage and protocol comparisons can be strengthened. The current procedure uses a limited set of step sizes and primarily full power transitions. Including a broader range of intermediate setpoints will reveal startup and nonlinear behaviors. Voltage levels significantly affect ramping rates; future experiments should standardize voltage and power caps when comparing CCS2 and CHAdeMO (for example, repeat 400 V and 575 V tests with identical 10 kW limits) to decouple protocol effects from operating point differences. Likewise, evaluating series/parallel BMPU stacking under identical constraints will clarify scaling behaviors.
Finally, the CDS emulator performed closely to a real EV in these tests; however, broader validation across various vehicle types and states of charge is recommended before generalizing the results. Implementing these refinements will enhance accuracy, facilitate fairer protocol comparisons, and enhance the applicability of conclusions for grid services.
5. Conclusions
This paper has presented a detailed experimental analysis of bidirectional electric vehicle charging systems, focusing on the dynamic response characteristics of a Watt & Well EVSE operating under ISO 15118–20 via CCS2 and CHAdeMO interfaces. The study provides updated and validated measurements of bidirectional charging controllability delays, including communication latency, ramping behavior, and power flow reversal (PFR) overheads. These results significantly advance the understanding of EVCS responsiveness and offer a refined basis for modeling and validating bidirectional charging systems in time-critical grid applications.
The measured delays—typically below 0.4 s for communication and around 0.5 s for ramping—demonstrate that modern bidirectional EVCS are capable of sub-second responsiveness. However, transitions involving a PFR were found to introduce an additional delay of approximately 1 s. These updated controllability metrics are particularly relevant for time-critical services such as primary frequency regulation, where rapid and predictable power modulation is essential. Future work should extend this analysis by integrating external control path delays—including those from aggregators, EMS, and grid operators—which were not considered in this study but are crucial for full-stack validation of grid service readiness.
The comparative evaluation of CCS2 and CHAdeMO implementations reveals that while CCS2 offers lower communication latency and stronger ramping performance, overall transition times remain similar due to protocol-specific control logic and hardware configurations. These findings underscore the importance of standardized testing across voltage levels and power caps to isolate protocol effects from hardware-dependent behavior. Future studies should explore protocol performance under harmonized operating conditions, including intermediate setpoint changes of various natures, to better understand nonlinear control dynamics and optimize system responsiveness. Moreover, the results highlight the influence of battery voltage and converter configuration on dynamic performance. Operating at nominal voltages yields faster ramping and lower delays, while deviations from nominal conditions introduce control overheads. This suggests that future EVSE designs should prioritize voltage adaptability and modular control strategies to ensure consistent performance across diverse EV platforms. Additionally, testing with a broader range of EV models and states of charge will be essential to validate the generalization of these findings and support the development of scalable, interoperable V2G ecosystems.
Finally, the study confirms that the ISO 15118–20 standard provides a robust framework for enabling bidirectional charging and dynamic grid integration. The refined controllability delays presented here offer a valuable reference for both real-time modeling and system-level validation. As the EV charging ecosystem evolves, future developments should focus on mitigating PFR delays through the use of advanced control algorithms and firmware enhancements. This transition is essential, as the CHAdeMO plug is being phased out and all modern vehicles of Europe now adopt the CCS2 interface. Furthermore, CCS2 combined with ISO 15118–20 is becoming a legal requirement within the EU, reinforcing the urgency of this shift. However, despite the transition, widespread deployment is still pending, as most EVs and EVSEs have yet to implement the standard and expose applications using the public key infrastructure required for TLS 1.3.