Next Article in Journal
Influencing Factors and Control Measures for Post-Construction Settlement of High-Fill Red Clay Embankment
Previous Article in Journal
Optimization of Metallic Support Geometry for Automotive Doors Using CAD, CAE, and Taguchi Method to Improve Structural Rigidity
Previous Article in Special Issue
Use of Plant Growth Regulators for Sustainable Management of Vegetation in Highway
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
This is an early access version, the complete PDF, HTML, and XML versions will be available soon.
Article

Development of a Methodology for Optimizing Repair Interval Timing for Mining Equipment Units

1
Department of Transport Engineering and Logistics Systems, Faculty of Transport, Logistics and Engineering Economics, Non-Profit Joint-Stock Company “Abylkas Saginov Karaganda Technical University”, 56 Mira Boulevard, Karaganda 100027, Kazakhstan
2
KazMinerals Bozshakol, Ekibastuz 141200, Kazakhstan
*
Authors to whom correspondence should be addressed.
Eng 2025, 6(12), 362; https://doi.org/10.3390/eng6120362
Submission received: 11 November 2025 / Revised: 3 December 2025 / Accepted: 3 December 2025 / Published: 11 December 2025
(This article belongs to the Special Issue Interdisciplinary Insights in Engineering Research)

Abstract

This study presents a methodology for optimizing repair intervals of mining equipment by integrating economic efficiency and reliability criteria. A review of existing maintenance strategies revealed their limitations, and a mathematical model was developed that incorporates both projected financial expenditures and the probability of equipment failures, enabling more accurate prediction of the optimal repair timing. This study introduces a novel integration of the Weibull reliability distribution with a cost-convolution optimization model, explicitly capturing the trade-off between economic efficiency and failure risk. Unlike traditional fixed-schedule approaches, the proposed model provides analytically optimized repair intervals derived from observed degradation trends. Statistical analysis demonstrates that unplanned repairs are, on average, 56% more costly than scheduled ones, highlighting the need to revise current preventive maintenance practices. The cost comparison is based on 34 restoration records collected from publicly available supplier price lists and field maintenance logs, converted into a unified currency. Based on operational data and reliability parameter estimation, the optimal repair interval was determined to be 5129 machine hours, which minimizes both the probability of failure and total maintenance-related financial losses, while reducing unplanned downtime. Unlike traditional fixed-schedule approaches, the proposed model allows adaptive adjustment of maintenance intervals according to the actual degradation characteristics of the equipment. The practical significance of the research lies in its ability to help mining enterprises reduce expenditures on corrective repairs, extend the service life of machinery, and improve overall operational efficiency. The findings contribute to advancing maintenance optimization in the mining industry, supporting more sustainable and cost-effective equipment management.
Keywords: repair interval optimization; mining equipment; Weibull distribution; maintenance cost analysis; reliability modeling; preventive maintenance; unplanned downtime; equipment availability; economic efficiency repair interval optimization; mining equipment; Weibull distribution; maintenance cost analysis; reliability modeling; preventive maintenance; unplanned downtime; equipment availability; economic efficiency

Share and Cite

MDPI and ACS Style

Kadyrov, A.; Kukesheva, A.; Daribzhan, M.; Aidraliyev, A. Development of a Methodology for Optimizing Repair Interval Timing for Mining Equipment Units. Eng 2025, 6, 362. https://doi.org/10.3390/eng6120362

AMA Style

Kadyrov A, Kukesheva A, Daribzhan M, Aidraliyev A. Development of a Methodology for Optimizing Repair Interval Timing for Mining Equipment Units. Eng. 2025; 6(12):362. https://doi.org/10.3390/eng6120362

Chicago/Turabian Style

Kadyrov, Adil, Aliya Kukesheva, Miras Daribzhan, and Aibek Aidraliyev. 2025. "Development of a Methodology for Optimizing Repair Interval Timing for Mining Equipment Units" Eng 6, no. 12: 362. https://doi.org/10.3390/eng6120362

APA Style

Kadyrov, A., Kukesheva, A., Daribzhan, M., & Aidraliyev, A. (2025). Development of a Methodology for Optimizing Repair Interval Timing for Mining Equipment Units. Eng, 6(12), 362. https://doi.org/10.3390/eng6120362