Post-Fire Inspection, Material Testing, Repair, and Field Load Testing of a Full-Scale Concrete Box Girder Bridge: Delta Bridge Case Study
Abstract
Share and Cite
Eisa, A.S.; Hassan, H.; Badran, M.A.; El-Zohairy, A. Post-Fire Inspection, Material Testing, Repair, and Field Load Testing of a Full-Scale Concrete Box Girder Bridge: Delta Bridge Case Study. Infrastructures 2026, 11, 76. https://doi.org/10.3390/infrastructures11030076
Eisa AS, Hassan H, Badran MA, El-Zohairy A. Post-Fire Inspection, Material Testing, Repair, and Field Load Testing of a Full-Scale Concrete Box Girder Bridge: Delta Bridge Case Study. Infrastructures. 2026; 11(3):76. https://doi.org/10.3390/infrastructures11030076
Chicago/Turabian StyleEisa, Ahmed S., Hilal Hassan, Mohamed A. Badran, and Ayman El-Zohairy. 2026. "Post-Fire Inspection, Material Testing, Repair, and Field Load Testing of a Full-Scale Concrete Box Girder Bridge: Delta Bridge Case Study" Infrastructures 11, no. 3: 76. https://doi.org/10.3390/infrastructures11030076
APA StyleEisa, A. S., Hassan, H., Badran, M. A., & El-Zohairy, A. (2026). Post-Fire Inspection, Material Testing, Repair, and Field Load Testing of a Full-Scale Concrete Box Girder Bridge: Delta Bridge Case Study. Infrastructures, 11(3), 76. https://doi.org/10.3390/infrastructures11030076