Abstract
Bridges play an increasingly indispensable role in endorsing the economic and social development of societies by linking highways and facilitating the mobility of people and goods. Concurrently, they are susceptible to high traffic volumes and an intricate service environment over their lifespans, resulting in undergoing a progressive deterioration process. Hence, efficient measures of maintenance, repair, and rehabilitation planning are critical to boost the performance condition, safety, and structural integrity of bridges while evading less costly interventions. To this end, this research paper furnishes a mixed review method, comprising systematic literature and scientometric reviews, for the meticulous examination and analysis of the existing research work in relation with maintenance fund allocation models of bridges (BriMai_all). With that in mind, Scopus and Web of Science databases are harnessed collectively to retrieve peer-reviewed journal articles on the subject, culminating in 380 indexed journal articles over the study period (1990–2025). In this respect, VOSviewer and Bibliometrix R package are utilized to create a visualization network of the literature database, covering keyword co-occurrence analysis, country co-authorship analysis, institution co-authorship analysis, journal co-citation analysis, journal co-citation, core journal analysis, and temporal trends. Subsequently, a rigorous systematic literature review is rendered to synthesize the adopted tools and prominent trends of the relevant state of the art. Particularly, the conducted multi-dimensional review examines the six dominant methodical paradigms of bridge maintenance management: (1) multi-criteria decision making, (2) life cycle assessment, (3) digital twins, (4) inspection planning, (5) artificial intelligence, and (6) optimization. It can be argued that this research paper could assist asset managers with a practical guide and a protocol to plan maintenance expenditures and implement sustainable practices for bridges under deterioration.
1. Introduction
Transportation infrastructure assets form the backbone of modern society, enabling mobility, commerce, and access to essential services [1]. Robust transport networks are vital for human well-being and economic prosperity, as they facilitate daily activities and the efficient movement of goods and people [2]. Bridges are vital components of transportation infrastructure that connects these networks together [3]. However, aging bridge stock, increasing traffic demands, and the intensifying effects of climate change present significant challenges for bridge management and conservation globally [4]. Bridges are subject to various forms of deterioration and degradation factors related to material properties, including chemical, design and construction, physical, operational, environmental, and force majeure factors [5]. Inadequate maintenance or delayed repairs can further accelerate deterioration, as small defects (cracks, leaks, etc.) grow to larger problems. Over time, the compounding effects of weathering, material aging, and heavy use can compromise structural capacity and serviceability. Without timely intervention, these factors may render bridges as structurally deficient, posing restrictions or safety risks to users.
Recent assessments of bridge infrastructure underscore the urgency of the maintenance challenge [6]. In the United States, the Federal Highway Administration (FHWA) has reported that there are over 617,000 bridges, and as of the latest evaluations, about 7.4% of them are rated in “poor” condition [7]. The American Society of Civil Engineers (ASCE) has given U.S. bridges an overall grade of “C” in its infrastructure report card, reflecting a middling state of health, with many structures in need of rehabilitation [8]. Similarly, in Canada, national evaluations reveal significant maintenance needs. The 2019 Canadian Infrastructure Report Card found that nearly 40% of municipal roads and bridges were in fair, poor, or very poor condition, with about 80% of them being over 20 years old [9]. Such statistics highlight a substantial backlog of aging bridges that require maintenance or replacement in the coming years. While a bridge rated as poor is not necessarily unsafe for use, it does flag structural deficiencies that mandate repair or stricter inspection to ensure safety.
Effective maintenance strategies are essential to preserve bridge functionality, extend service life, and ensure public safety. Worldwide, transportation agencies employ formal Bridge Management Systems (BMSs) to guide the upkeep and preservation of bridge networks [10]. A BMS is a decision-support system designed for structuring optimal programs and strategies of maintenance, repair, and rehabilitation (MRR) while satisfying their structural and resource constraints [11]. Allocating MRR funds efficiently helps to avoid a growing backlog of bridge work. Such accumulated deferrals can increase repair expenses to the extent that restoring deteriorated bridges may cost more than building new ones [12,13]. However, the challenge lies in the optimal allocation of limited financial resources to a growing inventory of aging structures. In response, researchers have developed maintenance optimization models that analyze possible actions (such as routine maintenance, repair, rehabilitation, or replacement) and schedules under budget constraints to recommend the optimal maintenance program [12]. The goal is to achieve the best possible outcomes in terms of safety, serviceability, and cost effectiveness over the bridge’s lifecycle. Traditional maintenance approaches often rely on periodic inspections and reactive repairs, which may not be sufficient to address the complexities of bridge deterioration and budget constraints.
Recent advancements in technology and analytical methods have led to more sophisticated maintenance optimization models. These models incorporate various factors, such as bridge condition assessments, deterioration predictions, risk analyses, and budget limitations, to prioritize maintenance actions [14]. For instance, optimization techniques, including multi-objective optimization and decision-support systems, have been developed to balance tradeoffs between different maintenance objectives and constraints [15]. Moreover, the integration of emerging technologies, such as machine learning and artificial intelligence, has enhanced the predictive capabilities of maintenance models. These technologies enable the analysis of large datasets from structural health-monitoring systems to identify patterns and predict future deterioration, facilitating proactive maintenance planning [16]. In addition to technical considerations, effective bridge maintenance optimization also involves organizational and policy aspects. Implementing comprehensive BMSs that integrate data collection, analysis, and decision-making processes is crucial for systematic maintenance planning. Such systems support asset managers in making informed decisions regarding maintenance priorities and resource allocation.
In essence, bridge maintenance budget allocation models improve equity, transparency, and accountability by replacing subjective or intuition-driven decisions with a data-driven, systematic process. Basically, these models apply standardized criteria, such as structural condition, traffic volume, and age to all bridges, ensuring that funding is allocated based on objective needs rather than favoritism. In addition, these models foster transparent decision-making because their inputs, weighting factors, and final scoring are documented and visible, allowing bridge managers to see exactly how and why each funding decision is made. Finally, accountability is strengthened as decision-makers are thereby able to create a defensible and clear audit trail for public expenditure against biased maintenance interventions.
Despite significant scholarly contributions, there remains a lack of consolidated understanding regarding the evolution, impact, and research gaps in maintenance budget allocation modeling for bridge infrastructure. A scientometric review, combined with a systematic literature review, offers a rigorous approach to evaluating knowledge trends, identifying leading contributors, and mapping intellectual structures in this field. Scientometric methods allow for a data-driven analysis of publication patterns, citation networks, and thematic developments, providing a meta-perspective on how bridge maintenance budgeting models have matured and diversified since the early 1990s [17].
2. Research Methodology
The allocation of maintenance budgets for existing bridge structures has been a critical concern in infrastructure management over the past three decades. Aging bridge inventories, constrained financial resources, and increasing traffic demands necessitate efficient and effective budget allocation strategies to ensure structural safety and serviceability. This conducted review systematically examines the evolution of maintenance budget allocation models, highlighting key methodologies, advancements, and trends in the field. This study employs a systematic literature review methodology, adhering to the widely recognized standards outlined in the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) statement. In this context, PRISMA offers a methodical framework for systemized identification, screening, and synthesis of pertinent research studies, bolstering scientific replicability and credibility of the review process [18,19,20]. Appendix A outlines PRISMA checklist 2020 and a PRISMA flow diagram of this research study. Figure 1 depicts a graphical representation of the data collection and processing of the literature review work on BriMai_all. It is a mixed-review methodology, comprising of both bibliometric analysis and systematic review of the current state of the art in the field of BriMai_all. The retrieval period spanned from 1990 to 20 April 2025, encompassing journal articles and book chapters in English language. In order to extract the most relevant documents, initial phrase searches and data extraction were carried out using Scopus and Web of Science databases. Several databases are available for performing bibliographic analysis, including Web of Science, Scopus, PubMed, Cochrane Library, Lens, Dimensions, and OpenAlex; each offer distinctive features and functions. Web of Science and Scopus are the most comprehensive and dominant literature databases across nearly all academic disciplines, which are often used for bibliometric analysis and systematic review [21,22,23]. With that in mind, the pertinent literature was gathered from the Scopus dataset using the TITLE-ABS-KEY search syntax, allowing for probing the title, abstract, and keywords of research records. In the Web of Science core collection, related indexed documents were garnered using the topic search function that looks into their title, abstract, keywords, and keywords plus fields. Thereafter, the designed search strategy yielded 1065 Scopus publications (1032 journal articles and 33 book chapters) and 1578 WOS publications (1547 journal articles and 31 book chapters). It is worth noting that thesaurus files were created in VOSviewer software to evade semantic errors, remove redundant and non-informative terms, and merge duplicates [24,25]. Thereafter, the resultant search strings are listed in Table 1.
Figure 1.
Methodological framework of the mixed review approach of BriMai_all literature.
Table 1.
Descriptions of formulated query strings.
Subsequently, the scientific articles from Web of Science and Scopus databases were merged into a consolidated dataset to undertake bibliometric analysis. The titles and abstracts of the blended database were meticulously examined to filter out non-pertinent and repeated publications. After completing the review process, relevant literature documents were narrowed down to 357 journal articles and 4 book chapters. Snowballing is a supplementary method in systematic literature reviews where researchers identify additional relevant studies by examining references (backward snowballing) and citations (forward snowballing) of selected articles [26,27]. It enhances the comprehensiveness of reviews by uncovering key works missed in database searches, especially in interdisciplinary fields. Additionally, it aids in enhancing the reliability and depth of literature synthesis as well as tracing the evolution of research themes through citation networks, providing historical context, and identifying seminal works [28,29]. Hitherto, the processes of forward and backward snowballing resulted in including an additional 19 journal articles, expanding the final dataset to a set of 380 scientific documents divided into 376 journal articles and 4 book chapters. Following that, this research study adopts VOSviewer software (version 1.6.20) [17] and Bibliometrix R package (version 4.3.3) [30] to visualize co-occurrence, co-authorship, co-citation, authors’ productivity, temporal co-word, publication growth, and citation trend analyses.
3. Scientometric Review Analysis
This section covers the main aspects of scientometric analysis examining publication data, citations, and authorship networks, which aid in identifying emerging fields and influential research contributions.
3.1. Publication Trend
The conducted publication trend aims to provide a historical understanding of the bridge maintenance-related studies, testing maturity and established interest, and understanding whether the interest trend is growing for this topic or it is declining. Figure 2 provides a detailed graphical representation of yearly publications concerning maintenance budget allocation models for existing bridge structures from 1993 to 2025. The figure’s blue columns indicate the number of articles published each year. In contrast, the dashed blue regression curve—derived from a fourth-order polynomial model using (Y–1993) as the independent variable—captures the overall upward trend in research output. The early exploration phase, spanning from 1993 to 2001, is characterized by modest publication activity, with annual counts rarely exceeding five, highlighting the nascent state of the field. From 2002 to 2014, during the steady development phase, publication numbers consistently ranged from 5 to 12 articles per year, reflecting a growing interest in the topic. However, the trend experienced a dramatic shift from 2015 onward, entering a rapid development phase, illustrated by a surge in publications that peaked at 38 articles in 2022. This increase underscores the intensifying scholarly focus within this domain. The regression equation (Equation (1)), determined through least squares fitting, has an R2 value of approximately 73%, indicating that the regression model accounts for over 73% of the variability in publication counts.
where AP is the annual number of publications and Y is the publication year.
Figure 2.
Yearly publication trends for maintenance budget allocation models of existing bridge structures (1990–2025).
Figure 3 illustrates the mean total citations per year from 1993 to 2025. The data reveal significant year-to-year variability: the earlier years show relatively low average citations, dipping to as low as 0.30 in 1996, alongside intermittent spikes such as 3.06 in 1997 and a peak of 4.65 in 2000. The subsequent years exhibit fluctuations, with notable increases during specific periods (for instance, 3.62 in 2003, 3.87 in 2014, and 4.06 in 2019) contrasted by lower averages in others. These variations indicate that the field experiences heightened impact and attention phases, likely reflecting bursts of influential research, while other years experience more moderate activity.
Figure 3.
Yearly mean total citations for maintenance budget allocation studies of existing bridge structures (1990–2025).
3.2. Document Analysis
Table 2 and Table 3 summarize the most highly cited articles on maintenance budget allocation models for existing bridge structures over the past three decades. Notably, the articles are ranked according to their total citations during the study period, emphasizing their significance within the field. The top-ranked article, “Maintenance and Management of Civil Infrastructure Based on Condition, Safety, Optimization, and Life-Cycle Cost” (2007), garnered 362 citations and achieved a normalized score of 6.08. This work illustrates how multi-objective optimization employing genetic algorithms can generate diverse maintenance strategies that balance structural performance, safety, and life-cycle costs, ultimately facilitating more informed decision-making. In second place, “Life-Cycle Cost Design of Deteriorating Structures” (1997) received 299 citations and a normalized score of 3.37. This article presents a reliability-based optimization approach that significantly reduces maintenance costs by utilizing non-uniform inspection intervals while preserving structural reliability. The other articles in the table further contribute by providing insights into system-level reliability approaches, advanced inspection scheduling through genetic algorithms, and innovative risk-based decision-making frameworks incorporating sustainability and resilience considerations. This table illustrates the evolution of maintenance optimization methodologies from early analytical models to sophisticated simulation and algorithm-based approaches. It highlights the increasing focus on balancing cost, safety, and performance in infrastructure management.
Table 2.
Summary of influential articles on maintenance budget allocation models for existing bridge structures.
Table 3.
Summary of influential articles on maintenance budget allocation models for existing bridge structures (Cont’d).
3.3. Co-Authorship Analysis
The institutional co-authorship map streamlines a visual representation of the collaborative dynamics between the engaged organizations in the BriMai_all domain. In this network, 39 organizations are displayed, such that they are credited with at least 2 publications. Within this network, Lehigh University, The Hong Kong Polytechnic University, University of Colorado and Concordia University emerge as focal points underlining their pivotal contributions and expansive collaboration work in the research domain of BriMai_all. The created network is grouped into five clusters, such that the red cluster is the large one, including 11 institutions such as University of Waterloo, Wonkwang University, Southeast University, Beijing University of Technology, Beijing Jiaotong University, etc. The green cluster is the second-largest one, containing nine institutions and led by the Hong Kong Polytechnic University, Concordia University, Delft University of Technology, Valencia Polytechnic University, and Cairo University. The blue cluster is the third-largest one (7 institutions), and it encompasses the most prolific and cited institution, which is Lehigh University. The yellow cluster consists of six organizations with the University of Colorado being the most contributive institution in it. The purple cluster contains five institutions, all of which share approximately a comparable efficiency in relation to publication count and its significance. Furthermore, it is evident that notable collaboration ties exist between Lehigh University and the Hong Kong Polytechnic University (link strength = 4), In addition, an academic cooperation network is formed between the Hong Kong Polytechnic University, Concordia University, and Cairo University. Table 4 records a comprehensive overview of the most contributing institutions in the literature on BriMai_all. Normalized citations are computed by dividing the article’s count of citations by the average number of citations for all publications from its same year of publication [17]. The total link strength denotes the total strength of the connections between a specific item in a network and all other items it is connected to. Hence, the total link strength attribute signifies the total strength of the co-authorship links of a given institution with other institutions [17].
Table 4.
Quantitative summary of the forefront institutions in the BriMai_all field.
It is observed that Lehigh University (52 documents), the Hong Kong Polytechnic University (18 documents), University of Colorado (18 documents), Concordia University (9 documents), and University of Waterloo (8 documents) stand as the most productive organizations in relation with the publication count on this topic. In terms of citation count, Lehigh University (2663), University of Colorado (1773), the Hong Kong Polytechnic University (274), Concordia University (202), and Valencia Polytechnic University (192) are positioned in the top five places. With respect to average citation frequency per year, it is elucidated that Delft University of Technology (3.31), Harbin Institute of Technology (2.54), University of Perugia (2.06), Paris-Saclay University (2.04), and Wuhan University of Technology (1.96) are featured in the top five rankings as shown in Figure 4.
Figure 4.
Co-authorship network of institutions in the research on BriMai_all.
Countries’ co-authorship analysis is utilized to examine the collaboration intensity and dynamics between scholars from different countries and render a more concise understanding of the patterns of countries’ contributions in the BriMai_all-related research. In this study, the minimum numbers of publications and citations of a country are set to two and zero, respectively. The size of the circle denotes the number of publications, and the thickness of lines between nodes indicates the extent of collaboration between partner countries. Figure 5 depicts a detailed picture of the countries’ collaboration network in the BriMai_all domain. Generally speaking, current research efforts on BriMai_all appear to be concentrated in developed nations, likely due to greater funding resources and advanced infrastructure assets. It is manifested that there is a total of four clusters (encoded with varying colors), such that each cluster represents a distinctive group. The first cluster (yellow color) has 4 countries, namely United States of America, Japan, Turkey, South Korea and Taiwan. This cluster is the most prolific (200 documents) and received the largest number of citations (7033). The blue cluster is led by the People’s Republic of China, Scotland, Switzerland, Germany, England, and Cyprus. This cluster is characterized by a substantial output of 102 publications, and it comes second in terms of citation count (1573). The green cluster is primarily formed based on the collaborations of Australia, Canada, Egypt, Hungary, Iran, and United Arab Emirates. The red cluster is composed of Belgium, Denmark, France, Ireland, Italy, Netherlands, Norway, Poland, Portugal, and Spain. Although publication output was identical between the green and red clusters (73 each), the research in the red cluster garnered a higher number of citations. The executed analysis expounds that a significant academic collaboration is present between the scholars of United States of America and the People’s Republic of China (link strength = 12) as well as between United States of America and South Korea (link strength = 10). It is also corroborated that notable collaborative partnerships emerged, with the strongest links occurring between the United States and France (link strength = 7), and between China and Canada (link strength = 6). In addition, it is noticed that the most cooperative countries are United States of America, the People’s Republic of China, Canada, France, South Korea, and England.
Figure 5.
Collaboration network of countries in the research on BriMai_all.
Table 5 displays the top five rankings of countries from the perspectives of publication count, number of citations, and average normalized citations. It can be determined that significant contributions to the research of BriMai_all are coming from scholars of United States of America (150 documents), People’s Republic of China (78 documents), Canada (32 documents), France (23 documents), and South Korea (22 documents). Overall, these countries account for more than 80% of the total worldwide publications in the BriMai_all field. In addition, it can be seen that the United States of America (5769), People’s Republic of China (1112), Canada (706), France (631), and Taiwan (480) are ranked the highest in relation with the count of total citations. At the grand scheme of things, the highest counts of both publications and citations are originated from the United States of America, People’s Republic of China, and Canada, pinpointing the high-quality research and outstanding academicians of scholars of these countries in this domain. Moreover, the rankings of countries by publication count align with their ranking by citation count. With regards to average normalized citations, it is noted that Norway (2.14) and Belgium (1.64) are accompanied by high average normalized citations despite contributing to three or fewer publications. Moreover, it is found that Spain (1.89), Australia (1.7), and Netherlands (1.65) come in the second, third and fourth places, respectively.
Table 5.
Quantitative summary of the world’s leading countries in the BriMai_all domain.
3.4. Co-Citation Analysis
Journal co-citation analysis is leveraged to categorize and underscore the most relevant and impactful sources pertaining to the research area of BriMai_all. Figure 6 displays the co-citation diagram of journals, that is established based on a minimum publication count of three, inducing 24 inter-related journals. A significant co-citation relationship was traced between structure and infrastructure engineering, and journal of structural engineering (link strength = 851) as well as between structure and infrastructure engineering and automation in construction (link strength = 629). It is also observed that the created diagram is overwhelmed by the red cluster (20 sources) that consists of structure and infrastructure engineering, journal of structural engineering, automation in construction, engineering structures, structural safety, journal of infrastructure systems, sustainability, etc. It is noteworthy that buildings, journal of transportation engineering, and structural and multidisciplinary optimization were assigned to separate clusters since their scope is not directly to infrastructure asset management, and they accommodate fewer publications in the research field of BriMai_all. Table 6 delineates details of the top journals with high numbers of publications, citations, and average normalized citations. With regards to the number of publications, it is corroborated that structure and infrastructure engineering (37), journal of structural engineering (23), journal of bridge engineering (18), engineering structures (18), and automation in construction (17) are ranked in the top five places. In addition, it is revealed that journal of structural engineering (1712), structure and infrastructure engineering (1119), structural safety (845), engineering structures (782), and journal of bridge engineering (701) hold the highest citation count in the BriMai_all area. Further analysis exemplified that Automation in construction (2.15) sustains the highest average normalized citations followed by structural safety (2.08), reliability engineering and system safety (1.71), journal of structural engineering (1.61), and journal of cleaner production (1.51).
Figure 6.
Journals’ co-citation knowledge network of BriMai_all studies.
Table 6.
Quantitative summary of the pre-eminent journals in the BriMai_all field.
Figure 7 depicts a graphical representation of core journals according to Bradford’s law. This law categorizes and sorts the sources (in a descending order) into several zones based on the number of published papers in a given research field [41]. As a result, it is revealed that zone 1 encompasses 7 journals (5.43%) totaling 132 papers (34.74%), middle zone 2 encompasses 18 journals (13.95%) totaling 123 papers (32.37%), and zone 3 encompasses 104 journals (80.62%) totaling 125 papers (32.89%). In this study, the core outlets include structure and infrastructure engineering (37 articles), automation in construction (18 articles), engineering structures (18 articles), journal of bridge engineering (18 articles), structural safety (15 articles), applied sciences (13 articles), and journal of structural engineering (13 articles).
Figure 7.
Bradford’s law on core sources pertaining to BriMai_all.
3.5. Keyword Co-Occurrence Analysis
The co-occurrence analysis of keywords was carried out to construct and visualize the knowledge domain in the literature on BriMai_all. In addition, it aids in (1) identifying the core research themes by clustering strongly associated keywords, (2) streamlining temporal evolution by analyzing how these clusters and keywords vary across different time periods, and (3) pinpointing prevalent tools by identifying the most frequently occurring algorithms and techniques. This analysis adopted author keywords as the analysis unit, full counting as the counting method, and a threshold of minimum keyword co-occurrences of four, culminating in a total of 63 keywords. Figure 8 displays the results of the keyword co-occurrence analysis. As can be seen, there are four colored and distinctive clusters (red, blue, green, and yellow). The red cluster is the largest one, and it includes 18 keywords. It primarily focuses on themes pertinent to life cycle analysis and deterioration modeling of bridge components, and it is composed of some keywords such as “life-cycle”, “life-cycle cost”, “user costs”, “Markov decision process”, “machine learning”, “dynamic programming”, and “analytical hierarchy process”. The green cluster is the second largest cluster (16 keywords), and it is broadly centered around asset management and bridge maintenance optimization, which is substantiated by the presence of “genetic algorithm” as a dominant keyword in this cluster. Further, this cluster covers some new aspects related to bridge intervention plans, such as bridge information modeling, deep reinforcement learning, sustainability, risk assessment, and resilience. Some frequent keywords are “bridge maintenance”, “maintenance optimization”, “multi-objective optimization”, “multi-criteria decision making”, genetic algorithm”, “deep reinforcement learning”, “bridge information modeling (brim)”, and “topsis”. The blue cluster comprises 15 keywords, and it concentrates on subjects pertaining to bridge inspection and condition assessment. Some of the most repeated keywords involve “maintenance”, “bridge inspection”, “corrosion”, “deterioration”, “deteriorating structures”, and “condition assessment”. The yellow cluster is principally dealing with stochastic driven analysis of bridge maintenance and structural deterioration, encompassing main keywords like “bayesian updating”, “reliability analysis”, “uncertainties”, and “structural health monitoring”. In addition, it is recognized that “maintenance” holds strong co-occurrence connections with the terms of “optimization” (link strength = 20), “bridges” (link strength = 12), and “bridge inspection” (link strength = 11), reflecting the growing interest in the topic of bridge maintenance optimization, and the pivotal necessity of inspection in ensuring the assignment of the required financial resources to maintain the safety and longevity of bridges.
Figure 8.
Analysis of keyword occurrence of BriMai_all.
Figure 9 upholds the temporal perspective of the co-occurrence network of author keywords. It is worth mentioning that circles with cold colors (blue and green) mark older publications, while circles with hot colors indicate more recent documents. It can be understood that most of the research work before 2014 was devoted towards the use of dynamic programming Markov decision process. Then, the direction shifted towards the use of reliability analysis, deterioration modeling, analytical hierarchy process, and genetic algorithm over the period 2014–2016. In the most recent years from 2016 onwards, research studies delved into the accommodation of multi-objective optimization, resilience assessment, risk modeling, resilience assessment, structural health monitoring, Topsis decision-making method, machine learning, and deep reinforcement learning. Table 7 lists a quantitative summary of the keyword co-occurrence analysis on BriMai_all. It records the frequency of occurrences, average publication year, average citations, average normalized citations, number of links, and total link strength. As can be seen, “optimization” (78 occurrences), “maintenance” (51 occurrences), “bridges” (41 occurrences), “bridge inspection” (29 occurrences), “genetic algorithm” (26 occurrences), “reliability analysis” (25 occurrences), “bridge management” (25 occurrences), “life-cycle cost” (24 occurrences), and “bridge maintenance” (24 occurrences) are the most widely used keywords. In relation with average normalized citations, it is concluded that “bridge information modeling (brim)” (2.77), “infrastructure management” (2.64), “safety” (2.13), “resilience” (2.12), and “maintenance optimization” (2.06) secured the highest five places. The keywords with the highest number of links (30 or more) are “optimization” (53), “bridges” (47), “maintenance” (45), “bridge maintenance” (34), “bridge management” (34), “life-cycle cost” (32), “reliability analysis” (31), “life-cycle” (30), and “bridge inspection” (30). In addition, it is noticeable that the largest total link strength is linked with the terms of “optimization” (216), “maintenance” (159), “bridges” (113), “bridge inspection,” (91), and “reliability analysis” (70). Accordingly, the conducted frequency analysis reveals that the analytical hierarchy process, genetic algorithm, and TOPSIS are the most used techniques in bridge maintenance optimization. In addition, emerging topics such as resilience, structural health monitoring (SHM), and deep reinforcement learning represent promising yet underdeveloped areas of research, and further investigation is crucial to effectively integrate them into the maintenance budgeting frameworks.
Figure 9.
Temporal visualization of keyword co-occurrence of BriMai_all-related work.
Table 7.
Details of the influential keywords in the BriMai_all-related literature.
4. Systematic Review Analysis
This section enumerates and expounds reported maintenance and inspection models that capitalized on multi-criteria decision making, life cycle assessment, digital twinning, optimization, and artificial intelligence.
4.1. Multi-Criteria Decision-Making (MCDM)-Based Models
Table 8, Table 9 and Table 10 record some of the reported MCDM-based maintenance models in the literature. These figures specify whether the reported studies rely on single or multi-criteria decision making. It also records the employed data analysis techniques, the main purpose of the study, and the data type of evaluation criteria (crisp or fuzzy). It is worth mentioning that single MCDM models rely on one MCDM technique in remediation planning of bridges while hybrid models use more than one MCDM technique in maintenance planning. In this regard, combined MCDM-based maintenance models encompass hybrid AHP models, hybrid TOPSIS, hybrid VIKOR, hybrid GRA, and assorted MCDM models. It is noticed that a considerable number of studies used AHP/ANP in maintenance management of bridges, whereas a portion of them capitalized solely on AHP/ANP while others blended it with another MCDM technique to rank repair priorities. In the context of AHP-based models, Yau et al. [42] implemented AHP in prioritizing post-disaster bridge maintenance efforts. Twelve decision criteria were identified and integrated into the assessment, encompassing both the susceptibility of bridges to damage and the potential consequences of such damage. These criteria involved disaster exposure history, landform characteristics, distance to disaster, intensity and classification of disaster, support system type, vertical clearance, restoration cost, traffic delay cost, age and location of bridge, average daily traffic, and accessibility to alternate traffic routes. It was shown that traffic delay cost (32.6%) and restoration cost (22.4%) received the highest importance of the six criteria of the impact of damage category. In a second study, Rashidi et al. [43] deployed simplified analytical hierarchy process for the sake of repair management of bridges without exceeding available budget limits. In this respect, the eventual critical evaluation indicators encompassed structural safety, cost, serviceability, traffic flow disruption, environmental impact, and political/legal consideration. In addition, routine maintenance, minor rehabilitation, major rehabilitation, and reconstruction. It was corroborated that the highest priority was given to structural safety (45.81%), with legal/political issues (2.99%) contributing the least.
On the same note, Abu Dabous and Alkass [44] proposed a modified AHP-based approach for the purpose of comparing bridge rehabilitation strategies. The modified approach entailed coupling AHP with Monte Carlo simulation to account for the uncertainties caused by incomplete knowledge in the decision-making process. The selection criteria comprised environmental impact, useful life, structural safety, agency cost, and use cost, and four classes of MR&R actions were investigated, namely replacement, major rehabilitation, minor repair, and routine maintenance. It was explicated that structural safety dominated the importance priorities with 53% followed by environmental impact and agency cost with 13% each. As for using ANP techniques, a recent research endeavor was conducted by Navarro et al. [45] who compared the sustainability of five alternative concrete bridge designs in marine conditions. In this respect, ANP was undertaken to analyze the significance of the sustainability-related criteria, involving scarcity of resources, ecosystems, human health, public opinion, users, economic development of regions, employment generation, maintenance costs, and construction costs. Four design alternatives were proposed and evaluated besides the conventional design, which were as follows: (1) adding 10% silica fume, (2) adding 10% fly ash, (3) using surface treatment with a sealant, and (4) using high corrosion resistant galvanized steel reinforcement. Concrete incorporating silica fume demonstrated the optimal performance over its life cycle in chloride-exposed environments, and the design using conventional materials ranked as the least sustainable option.
Contreras-Nieto et al. [46] introduced a spatial-based MCDM framework for ranking and visualization of bridge maintenance priorities. The bridge condition was derived through a weighted average rating of substructure, superstructure, deck, and scour. In addition, the weights of assessment criteria (e.g., resilience, safety, serviceability, and riding comfort) were obtained using AHP. Afterwards, a user interface was designed in a geographical information system environment by compiling Google maps, fusion tables and AHP results in order to visually depict the bridge maintenance outcomes. Salem et al. [47] built a multi-objective decision making model that capitalized on AHP to scrutinize the importance priorities of the main criteria and sub-criteria of environmental impact, influence on adjacent communities, safety, cost, traffic, and economical impact. Cost (27%), local events (13.5%), traffic (13%), noise pollution (8.71%), and motorist safety (6.5%) were placed as the five most important bridged maintenance criteria. Sensitivity analysis was later applied to conceive how the bridge alternatives behaved according to the perturbations in the relative importance criteria.
Turning to the hybrid AHP-based models, Xu et al. [48] investigated three approaches for rigorous scrutiny of bridge components and their deficiencies, namely constant weight model (CWM), factor-based variable weight model (FVWM), and factor and age-based variable weight model (FAVWM). In CWM, the values of weights will remain constant regardless the values of factors while the weights are altered according to the values of the factors in the case of FVWM. As for the FAVWM, it follows the same logic as factor-based variable weighting, besides age-dependent weights are likewise subject to the constraints of normality, continuity, and penalization. It was concluded that the condition scores of FAVWM are recommended over CWM and FVWM for setting bridge maintenance strategies. Additionally, Wakchaure and Jha [49] deployed AHP to derive the weights of bridge components and sub-components, and subsequently, these weights are merged with the severities of distresses to interpret the bridge health index, and condition states of bridge components and subcomponents. It was determined that foundations were ranked as the most critical component for bridge maintenance (33%), with superstructure second (22%), substructure third (18%), and bearings fourth (14%). On the other hand, the approaches (4%), appurtenances (4%), and waterway (5%) were assigned considerably lower priorities.
Alshibani et al. [50] introduced a decision-making framework for prioritizing bridge maintenance expenditures by blending AHP with MAUT. Several factors were identified to gauge bridge maintenance priority at the network level such as condition status, age, location, previous maintenance, traffic maintenance, and traffic volume. Additionally, several bridge components were assessed, including foundations, piers, abutment walls, expansion joints, bearing pads, and bridge decks. It was revealed that condition status (25.9%), bridge age (21.3%), and bridge location (17%) were the highest-weighted factors in determining bridge maintenance priorities. Beyond that, it was illustrated that bearing pads (20.7%), deck and parapet (17.3%), and expansion joint (16.9%) were identified as the most critical structural components of the bridge. Further research was conducted by Rashidi et al. [51], who proposed an integrated framework for maintaining steel bridges within acceptable safety, performance, and sustainability boundaries. In it, SMART and AHP were aggregated, resulting in simplified AHP that is capable of identifying and benchmarking the weights of the remediation criteria. Results elucidated that safety, cost, and service life emerged as the highest-weighted factors with 45.81%, 26.27%, and 13.76%, respectively.
Abu Dabous and Alkass [52] constructed a decision support system for ranking of rehabilitation programs predicating on AHP and MAUT. The optimal rehabilitation strategy was determined according to the factors of environmental consequences, useful life, safety, user costs and agency costs. It was revealed that safety (54.8%) constituted the most important selection factor while user costs factor (8.8%) was the least critical. Similarly, Abu Dabous and Alkass [53] built a fund allocation of bridges based on a MAUT model that aimed to maximize bridge safety and safety, maximize investment efficiency, and minimize deterioration. AHP was exploited to find the relative importance weights of attributes, which were integrated with a separate utility function to find an overall utility score of each bridge project.
Moving on to the hybrid TOPSIS models, Navarro et al. [54] conducted life-cycle sustainability analysis of coastal concrete bridge decks. The ecological and economic performance factors were measured using neutrosophic group AHP, and TOPSIS was undertaken to create a unified sustainability score of bridge deck designs. Among the sustainability evaluation criteria, there were construction costs, service life costs, damage to ecosystem, damage to human health, damage to resource availability, workers, users, public opinion, and regional economic development. In a second study, Gokasar et al. [55] formulated an integrated model for CO2 Emission-Driven Optimization of Bridge Maintenance Scheduling. Type-2 neutrosophic number (T2NN) based fuzzy WASPAS was amalgamated with TOPSIS to rank bridge maintenance projects. The key examined criteria involved cost effectiveness, extra fuel consumption, physical condition, exposure to fatigue, importance factor, social impact for travelers, appropriateness for maintenance, and CO2 emissions. Results underlined that cost effectiveness (13%) and CO2 Emissions (13%) were ranked as the most crucial importance factors while the lowest weight was assigned to extra fuel consumption (11.9%). In a third study, Ors et al. [56] advanced a decision support system to identify the most suitable construction technique of bridge piers meanwhile, satisfying the critical factors of cost, time, lateral stiffness, ductility, risk, constructability, and maintainability. The examined construction techniques involved anchored post-tensioned, post-tensioned, and monolithic. AHP was utilized to define the significance of each criterion, and TOPSIS was then employed to facilitate the alternatives. The analysis concluded that post-tensioned construction was the preferred method in Egypt’s current market. Moreover, risk, constructability, and cost sustained negligible impacts on recognizing optimal alternative. Another notable research attempt was presented by Das and Nakano [57] who deployed TOPSIS method to consolidate socio-technical dimensions into a framework for bridge maintenance ranking. The prioritization factors involved delay costs, truck influence, redundancy, accessibility, and bridge condition level. It was underscored that vector transformation was more efficient than linear transformation in TOPSIS method, and the bridges associated with higher delay costs were sorted as the highest priority for repair.
Shifting focus to the hybrid VIKOR models, Lad et al. [58] proposed a method to identify priority bridges for resilience upgrades. The CRITIC method was employed to determine the weighting of the specified criteria, namely age, area, design high flood level, and finish road level. Then, five MCDM techniques were applied to derive bridge priorities, which were TOPSIS, VIKOR, COPRAS, ARAS, and MOORA. Subsequently, WSM was adopted to generate a final ranking of bridges through merging the rankings of the aforementioned MCDM techniques. It was inferred that COPRAS and MOORA exhibited the highest Spearman rank correlation with 1 and 0.993, respectively. In the same vein, Gao et al. [59] evaluated bridge rehabilitation projects based on specific targets like cost, service years, average daily traffic, average daily truck traffic, among others. Afterwards, the objective weights of the priority assessment were determined predicating on the target-based standard deviation method and the entropy concept. This is followed by using VIKOR method to determine the priority for intervention among bridges requiring maintenance.
As for the hybrid GRA models, Tan et al. [60] employed a hybridization of FAHP and GRA to identify the optimal reinforcement scheme of a concrete-filled arch bridge deck. The decision factors comprised economic rationality, structural functionality, structural aesthetics, and technical feasibility. Besides, the investigated reinforcement schemes consisted of (1) replacing the overall bridge deck, (2) adding longitudinal concrete beams, (3) adding longitudinal steel beams, and (4) adding longitudinal steel box-concrete composite beams. Another research effort was delivered by Rogulj et al. [61] designed an integrated decision support system to assign priorities of historic bridges reconstruction. Several indicators were specified to determine the ranking index, including safety and stability, load, complexity of reconstruction, preservation of cultural heritage, reconstruction duration, functionality, cost, and environmental impact. Thereafter, EDAS was blended with GRD within an intuitionistic fuzzy environment to sort out pedestrian historical bridges for maintenance, and then the final ranking of each decision group was formed by combining ant colony optimization and integer linear programming.
Another branch of research efforts is WSM-based oriented. In this respect, Tabor et al. [62] solicited bridge experts through two-round Delphi process to allocate weighted factors to the structural safety and serviceability components. Then, a weighted sum equation was used to find the condition status of pedestrian bridges by merging the weighted factors of bridge components and their condition levels. In another attempt, Mohamadiazar et al. [63] addressed the societal and environmental aspects in their bridge rehabilitation framework besides the conventional structural and operational considerations. Among the studied social equity and environmental factors, there were population density, land use, average commuting time, crime rate, air quality index, etc. Thereafter, spatial-based MCDM was performed using simple additive weighting to create integrated vulnerability maps that can be used as an approach for bridge prioritization.
The last portion of research studies is the assorted MCDM models that investigate a diverse collection of MCDM techniques. For example, Seçer and Saylan [64] scrutinized corrosion mitigation strategies in steel truss bridges meanwhile accommodating ultimate load capacity, and lifecycle direct costs. Also, study alternatives included full repainting time intervals for each type of steel bridge (pratt truss, parker truss and Baltimore truss). Eventually, MCDM scores were generated using TOPSIS, COPRAS, and SAW, which suggested undertaking a 25-year repainting interval for all three types of bridges. Another research endeavor was performed by Salmaninezhad and Jazayeri Moghaddas [65] to facilitate the comparative ranking of repair techniques of river bridge columns. They amalgamated EV and EW to quantify the importance criteria of cost, duration, durability, vulnerability to flood, geometry, and scouring depth. Then, the repair methods of high-performance concrete jacketing, steel jacketing, and fiber-reinforced polymer jacketing, were assessed using ELECTRE and SAW methods. It was inferred that both methods yielded high-performance concrete jacketing as the most feasible repair option. A third relevant work was developed by Karaaslan et al. [66], who devised a bridge value index that gathers the aspects of maintenance cost, bridge importance, serviceability, safety, and structure type. Moreover, they constructed a deep learning model that fuses CNN and LSTM for time-history forecasting of structural deterioration.
Table 11 elucidates some of the used MCDM techniques in bridge rehabilitation-related work. Several methods have been proposed to derive the criteria weights, and these weight determination methods can fall under one of three main categories, which are: subjective, objective, and combinative. Subjective weight determination methods rely on the preferences of decision makers to assign weights of importance criteria [67]. A key impediment of these methods is their decreasing efficiency as the number of criteria grows [68]. Analytical hierarchy process (AHP), analytical network process (ANP), fuzzy analytical hierarchy process (FAHP), fuzzy analytical network process (FANP), best-worst method (BWM), decision making trial and evaluation laboratory (DEMATEL), full consistency method (FUCOM), and stepwise weight assessment analysis (SWARA) are traditional examples of subjective weight methods [69,70]. In contrast, objective weighting methods adopt specific mathematical algorithms to analyze the initial decision matrix itself without taking into consideration human judgments [71]. The objective weights of criteria are usually obtained using criteria importance through intercriteria correlation (CRITIC), Shannon entropy, Standard deviation (SDV), method based on the removal effects of criteria (MEREC), criterion impact loss (CILOS), and logarithmic percentage change-driven objective weighting (LOPCOW) [67,72]. Combinative methods merge both decision-makers’ preferences and data-driven insights from the decision matrix, rendering more accurate and practical weight assignments [73].
MCDM techniques can be clustered into distance-based, pairwise comparison, utility-based, and outranking methods [74]. Distance-based approach is predicated on ranking alternatives according to their proximity to the ideal and anti-ideal solutions. Key methods of this group include: VIKOR, TOPSIS, GRA, EDAS, combinative distance-based assessment (CODAS), while pairwise comparison approaches involve comparing all possible pairs of criteria and alternatives through pairwise evaluations, and it encompasses AHP and ANP [75,76]. Utility-based methods evaluate and rank alternatives by aggregating their performance across multiple criteria through a mathematical utility function into a single composite utility score. Its most used methods are CORAS, SAW, WASPAS, and MAUT. Outranking approaches are another class of MCDM techniques that compare pairs of alternatives to determine the degree to which one alternative dominates other alternatives across multiple criteria, whereas Popular outranking methods incorporate ELECTRE and PROMETHEE [74,77].
Table 8.
Summary of some MCDM-based maintenance prioritization models.
Table 9.
Summary of some MCDM-based maintenance prioritization models (Cont’d).
Table 10.
Summary of another set of MCDM-based maintenance prioritization models.
Table 11.
Description of MCDM techniques.
Table 12 outlines the considered criteria by some of the available MCDM-based maintenance models in the literature. Given the wide range of maintenance criteria, the authors reported a set that covers structural, physical, operational, financial, social, and environmental considerations. In this regard, MCDM-based maintenance prioritization models can be either factor-based or defect-based. As for the factor-based models, they focus on aggregating weighted performance scores across the different criteria (factors). Usually, these factors cover technical, physical, operational, economic, and environmental features of the bridge. Unlike factor-based approaches, defect-based models rank maintenance actions by compiling the severities of anomalies (e.g., corrosion, spalling, cracking) and relative importance priorities. It is viewed that maintenance agency costs, safety, condition/reliability, environmental impact, serviceability/useful life, and user costs are amongst the most utilized factors by the developed MCDM maintenance prioritization models. For example, Allah Bukhsh et al. [84] evaluated the user delay costs by determining the extra travel time (ETT) caused by the reduced speeds in the work zone (see Equations (2) and (3)).
where:
is the work zone length in Km, and is the average hourly traffic volume. is the monetary value per person per hour, and denotes the duration of maintenance (hours). is the bridge’s deck area in m2 while and stand for the reduced speed during maintenance work zone and normal speed, respectively.
Environmental-related factors incorporate climate event vulnerability, climate load vulnerability, embodied carbon/environmental impact, hydrology and climate, and geotechnics and seismicity. For instance, Salem et al. [47] accommodated air pollution and noise pollution associated with bridge rehabilitation. In another study, Bukhsh et al. [84] accounted for abiotic depletion potential, global warming potential, ozone depletion, acidification potential, eutrofication potential, human toxicity potential, freshwater toxicity potential, marine ecotoxicity potential, and terrestic ecotoxicity potential. Likewise, Sabatino et al. [87] evaluated the environmental impact of detour management and bridge maintenance using the measures of CO2 emissions and energy consumption. In their work, the annual expected carbon emissions as a result of bridge detour and bridge repair can be obtained using Equations (4) and (5), respectively. The annal expected energy consumption due to bridge repairs is expressed using Equation (6).
where:
is the detour length, and is the percentage of trucks in the average daily traffic. and are carbon dioxide emissions per unit distance (kg/km) for cars and trucks, respectively. signify the average daily traffic at year t and is duration of bridge detour (days). denotes the probability of system failure. is the CO2 footprint of rebuilding (Kg/m2). and are width and length of bridge (m). is the total amount of energy consumption accompanied with rebuilding (GJ/m2).
Condition assessment is another important parameter in composing the priority maintenance score. Allah Bukhsh et al. [84] developed a weighted function that gauges the system-level performance of bridges (see Equation (7)). In this regard, the bridge structure is decomposed into several components, and a condition score is linked with each respective component, and eventually a holistic condition score is computed for the entire bridge. Defect-based models are another type of condition assessment models that evaluate bridge health through identifying the observed defects alongside their extent of severities. One of the early attempts in this regard was performed by Alsharqawi et al. [107] who analyzed the performance condition of bridge deck according to cracking, disintegration, corrosion, delamination, spalling, deposits, joint problems and pop-outs. In addition, they proposed an integrated condition function of bridge deck as presented in Equation (8). By the same token, Abdelkader et al. [83] prioritized their bridge maintenance strategy capitalizing in assessing the severity levels of corrosion, delamination, cracking, spalling, and scaling. Another research effort was carried out by Xu et al. [48] who appraised the condition of suspension bridges capitalizing on evaluating the defects present in the structural components of tower, auxiliary facility, substructure, anchorage, stiffening girder, suspender system, and main cable system. Among the studied bridge deficiencies, there were wire corrosion, ponding, oil leaks, crack, coating deterioration, deformation, connection looseness, and scour, among others. In addition, Tabor et al. [62] investigated the condition of pedestrian bridge by triggering the degree of deterioration in each component such as piers, railings, deck, stairs, drainage, main cables, trusses, etc. The condition of the bridge component using Equation (9), and its value ranges from 0 to 100 according to the seriousness of deterioration. Furthermore, Wakchaure and Jha [90] analyzed the bridge health index alongside the condition states of components and subcomponents predicating on the weights and severities of distresses (see Equations (10)-(12)). With that said, a series of equations were formulated to achieve this requirement.
where:
is the condition score of bridge element, e.g., guardrail, railing, pavement, joints, abutment, bearings, and superstructure. is the relative importance weight of bridge element . , , , and represent the percentages of bridge deck’s good, medium, severe, and very severe condition categories, respectively. is the degree of deterioration in bridge component, and its value spans from 0 to 4 according to a provided description for the bridge component deterioration. For instance, the is 0 if the bridge component is in an excellent condition or new and does not suffer from evident deterioration, and is 1 if the bridge component is in a good condition and sustains slight or marginal deterioration. The terms of , and represent bridge health index, condition index of bridge component, and condition state of bridge subcomponent, respectively. is the count of present distress types, and is a coefficient that benchmarks the condition state of bridge cub-component, and it can be either excellent, good, fair, poor, or critical.
Table 12.
Identified prioritization criteria from some literature studies.
4.2. Life Cycle Assessment (LCA)-Based Models
Table 13, Table 14 and Table 15 provide a comprehensive summary of key studies in the literature on bridge Life-Cycle Assessment (LCA), categorized into three distinct areas: Cost-based LCA, Environmental LCA, and Integrated LCA. Cost-based LCA primarily focuses on economic factors, while Environmental LCA emphasizes environmental impacts. In contrast, Integrated LCA combines economic, environmental, and social dimensions to facilitate comprehensive decision-making. Studies in Cost-Based Life Cycle Assessment (LCCA) primarily aim to minimize total ownership costs through systematic decision-making processes. Various approaches have been adopted, including both deterministic and probabilistic methods, to address the complexities and uncertainties inherent in bridge maintenance management. Deterministic methods employ fixed input parameters, offering simplicity in life cycle cost analysis, but potentially lacking realism in capturing uncertainties [109,110,111]. On the other hand, probabilistic methods explicitly account for uncertainty related to loads, deterioration rates, and intervention timings, providing robust and realistic outcomes. The Hasofer–Lind reliability method has been applied to assess fatigue monitoring via weigh-in-motion (WIM) sensors for steel bridge girders. This approach has notably reduced load uncertainties, enhanced safety, and yielded significant economic savings. Seismic resilience studies have developed a time-dependent LCCA-based Monte Carlo simulation to effectively determine financial break-even points for structural health monitoring (SHM) systems for bridges in earthquake-prone regions. Additionally, renewal theory-based methodologies have provided analytically rigorous yet computationally efficient probabilistic solutions, strategically balancing the frequency of minor maintenance activities with infrequent significant repairs [112]. Probabilistic event-based simulations that incorporate Weibull-modeled damage and repair cycles have offered valuable sensitivity analyses, guiding the selection of optimal repair methods for chloride-contaminated concrete columns [113]. Finally, Markov deterioration process-based probabilistic analytical methods have been applied to forecast bridge deterioration and support maintenance resource allocation [114].
Environmental LCA methods primarily address cradle-to-grave environmental impacts, with a particular emphasis on greenhouse gas emissions and energy consumption. Hybrid Bayesian-fuzzy models have been explicitly applied to manage uncertainties related to imprecise and ambiguous data, enhancing understanding of complex interactions among various life-cycle phases [115]. Additionally, probabilistic life-cycle sustainability analysis, which employs Monte Carlo propagation combined with surrogate modeling, has effectively addressed uncertainties and characterized interactions between different lifecycle phases. These analyses have highlighted material production and maintenance phases as significant sources of emissions [116]. Moreover, studies conducted following ISO 14040/44 standards revealed that despite higher initial environmental impacts, bridge designs oriented toward enhanced durability substantially reduce lifetime emissions, particularly when maintenance schedules are accounted for [117]. Furthermore, dynamic LCAs that incorporate future decarbonization scenarios have significantly influenced decisions regarding the optimal timing for bridge rehabilitation, particularly in long-span cable-stayed bridges [118]. Lastly, informed material selection studies have underscored significant reductions in energy consumption and greenhouse gas emissions through careful evaluation and comparison of bridge-deck surfacing materials, notably identifying epoxy-asphalt as an environmentally advantageous option [119].
Integrated LCA approaches holistically merge cost, environmental, and social dimensions, providing comprehensive decision-making frameworks. Several studies have integrated social-cost evaluations, which quantify impacts such as user delays, business losses, and safety implications, highlighting their substantial dominance over direct agency expenditures and emphasizing the need for proactive interventions and enhanced reliability targets [120,121,122]. Deterministic social-cost evaluations demonstrate that preventive measures, such as increased concrete cover, stainless steel reinforcement, and cathodic protection, can significantly reduce total lifecycle costs by up to approximately 58%, primarily driven by user-delay costs during major maintenance activities [121]. Moreover, multi-level stochastic cost-benefit LCCA approaches that incorporate user and societal costs strongly advocate for earlier interventions, as user-related costs often exceed agency costs by more than ten times, underscoring the critical importance of minimizing total societal costs [122]. Additionally, analytical cost-benefit optimization methods that integrate failure probabilities and user and social cost penalties have justified earlier optimal deck replacement timing and higher reliability targets, reinforcing the alignment between infrastructure safety, social welfare, and fiscal responsibility [123]. Studies utilizing probabilistic LCCA combined with environmental assessments have highlighted the economic and environmental advantages of corrosion-resistant steel, which substantially reduces lifecycle costs and CO2 emissions in chloride-rich environments, effectively offsetting higher initial investments [124]. Furthermore, eco-efficiency assessments based on parameterized life-cycle inventory and cost models comparing conventional and ultra-high-performance concrete (UHPC) overlays have demonstrated that despite their higher initial cost, UHPC overlays significantly lower total lifecycle costs and reduce embodied carbon, particularly when service life is extended beyond twice that of conventional overlays [125].
Table 13.
Summary of cost-based life cycle assessment (LCCA) studies on bridges.
Table 14.
Summary of sustainability life cycle assessment (LCA) studies on bridges.
Table 15.
Summary of integrated LCA Studies (cost, environmental, and social dimensions).
4.3. Digital Twin (DT)-Based Models
Digital Twin (DT) technology has emerged as a transformative solution for the management of bridge operation and maintenance (O&M), significantly enhancing safety, sustainability, and decision-making capabilities. By providing dynamic, real-time digital representations of physical structures, DTs facilitate proactive maintenance strategies, predictive analytics, and informed resource allocation. Central to the successful implementation of DT models are advanced data acquisition tools, which include terrestrial LiDAR geometry, UAV imagery, IoT strain gauges, Global Navigation Satellite System (GNSS), total-station controls, and structural health monitoring (SHM) systems. The integration of terrestrial LiDAR with periodic strain and vibration recordings has enabled the precise capture of geometric data and the effective monitoring of structural integrity, both essential for conducting detailed bridge assessments [134]. Additionally, UAV imagery, in conjunction with LiDAR scans and IoT sensors, has enhanced the collection of high-resolution spatial and condition data. This data serves as critical input for real-time bridge health monitoring and informed decision-making [135]. Moreover, the merging of LiDAR point clouds with GNSS and total-station data has supported accurate geometric reconstruction and comprehensive lifecycle scenario simulations, thereby enhancing long-term maintenance planning [136]. SHM systems, which utilize metrics such as stress, ambient conditions, and visual inspections, provide essential information for assessing the conditions related to corrosion and fatigue deterioration in bridge components [137]. This integration significantly improves safety assessments and operational reliability as shown in Table 16.
Table 16.
Summary of digital twin applications in bridge operation and maintenance.
The role of analytical methods and techniques is paramount in processing collected data, which in turn enables informed decision-making and optimized maintenance strategies. Techniques such as template matching-based segmentation have demonstrated effectiveness in achieving accurate geometric modeling within Building Information Modeling (BIM) software, including Revit and Solibri. These models can subsequently be exported into simulation software, such as Navisworks, to conduct ‘what-if’ rehabilitation simulations, thus enhancing structural condition assessments for heritage asset management [134]. Furthermore, advanced finite element (FE) modeling tools, including SCIA Engineer and SketchUp, combined with differential evolution algorithms, facilitate detailed structural modeling and scenario-based analyses. This capability supports both scenario simulation and lifecycle sustainability planning [136]. Specialized web-based visualization platforms, such as Xeokit and CesiumJS, offer comprehensive functionalities that support real-time operational management, intelligent traffic rerouting, efficient maintenance scheduling, and optimized logistics operations [135]. These platforms enhance decision-making through detailed visualization and spatial analysis, thereby significantly improving the efficiency and safety of bridge operations. Finally, the integration of multi-physics corrosion-fatigue modeling with reinforcement learning approaches has advanced predictive maintenance optimization. Such methodologies enhance intelligent real-time inspections and enable optimized maintenance decision-making, allowing for precise predictions of maintenance needs and intervention timing [137].
4.4. Bridge Inspection Models
The studies summarized in Table 17 and Table 18 reflect an evolving landscape in inspection planning models that integrate advanced nondestructive testing (NDT) methods, probabilistic analyses, and optimization techniques. For concrete bridges, multi-modal NDT approaches, infrared thermography (IRT), ultrasonic surface wave (USW), ground-penetrating radar (GPR), and electrical resistivity (ER), and others, combined with simulation-based strategies (e.g., Particle Swarm Optimization (PSO) and Discrete Event Simulation (DES) [138]) to improve scheduling accuracy and reduce costs, while probabilistic methods such as kernel density estimation (KDE) and fuzzy logic integrated with Bayesian networks refine failure probability predictions [139,140]. In reinforced concrete (RC) structures, spatial Bayesian updating and co-active prioritization models target critical elements to enhance the Bridge Health Index (BHI) and minimize scheduling uncertainty [141,142]
Adaptive, risk-based inspection (RBI) strategies using Monte Carlo simulation have shifted practices away from fixed intervals toward dynamic, cost-effective scheduling [143,144]. For steel bridges, the use of phase-type multi-state Markov models, Markov Decision Processes (MDPs), and digital twin frameworks extends fatigue life by optimizing inspection intervals and maintenance actions [145,146,147], building on earlier probabilistic and reliability-based approaches [148,149,150,151,152]. Moreover, emerging research incorporating unmanned aerial vehicles (UAVs), vision-based robotic systems, and metaheuristic algorithms such as Ant Colony Optimization (ACO) and PSO addresses resource optimization and real-time decision-making challenges [34,153,154,155].
Table 17.
Summary of inspection planning models: applications, techniques, optimization approaches, and contributions.
Table 18.
Summary of inspection planning models: applications, techniques, optimization approaches, and contributions (Cont’d).
4.5. Artificial Intelligence-Based Models
Many machine learning (ML) and optimization techniques have been explored for infrastructure maintenance decision-making, each with distinct advantages and limitations. Traditional statistical approaches, such as linear regression and time-series analysis, have been extensively used for cost prediction and trend analysis in maintenance planning [159]. The linear regression model, for instance, predicts maintenance costs as a function of relevant variables (e.g., bridge age) (Equation (13)). For more complex, multi-parameter decision-making, ML models such as probabilistic neural networks (PNN) and radial basis function networks (RBFN) have been employed [160]. These models can capture nonlinear relationships and are often enhanced by dimensionality reduction techniques like principal component analysis (PCA) to improve predictive accuracy. Support vector machines (SVMs) are also utilized for risk estimation and classification tasks, with the decision function defined as in Equation (14) [161]. Advanced deep learning (DL) architectures have further improved modeling capabilities. These include the Deep Neural Networks (DNN) model [162] (see Figure 10a), Neural Networks with Entity Embeddings (NN-EE) [163], and Self-Organizing Map-based Cluster Merging (SOMCM) using a multi-dimensional matrix composite neural network for surface image identification [164].
These models are especially effective in handling high-dimensional input data, uncertainty, and complex feature interactions. Optimization algorithms are crucial in maintenance planning, particularly for multi-objective problems (Equation (15). The Non-dominated Sorting Genetic Algorithm II (NSGA-II) is widely used to balance objectives such as cost, reliability, and sustainability [165]. Dynamic programming (DP) and decision tree (DT) analysis have also been applied to determine optimal maintenance schedules over the life cycle of structures [166,167,168]. The DP approach recursively solves sub-problems using the Bellman equation (Equation (16). While these traditional and optimization-based methods are effective for smaller or less complex systems, they often struggle to scale to the high-dimensional, uncertain environments encountered in large infrastructure networks.
Recent advancements in artificial intelligence have significantly transformed the field of infrastructure maintenance, particularly through the application of Deep Reinforcement Learning (DRL). DRL synergistically combines the sequential decision-making framework of reinforcement learning (RL) with the powerful function approximation capabilities of deep neural networks, enabling the management of large and complex state-action spaces typical in civil infrastructure systems [169,170,171,172,173], illustrated schematically in Figure 10b. In DRL-based maintenance planning, frameworks such as Deep Q-Networks (DQN) have been widely adopted as surrogate models for value functions. The DQN architecture takes the current state of the infrastructure as input and outputs Q-values for each possible action, facilitating the selection of optimal maintenance policies. The fundamental Q-learning update rule is given by Equation (17). Multi-agent DRL frameworks have been developed to address the challenges of large-scale and networked infrastructure systems [174,175,176]. In these settings, decentralized agents make maintenance decisions for individual components or structures, while a centralized critic evaluates the overall system performance [173,174]. Advanced DRL algorithms, such as Proximal Policy Optimization and its multi-agent variants (MAR-PPO), have demonstrated superior performance in complex environments by promoting efficient information flow and collaboration among agents [174] (Equation (18). Furthermore, integrating DRL with surrogate modeling, such as convolutional neural networks (CNNs) for spatio-temporal feature extraction, enhances predicting deterioration processes and optimizing maintenance schedules under uncertainty [170,173]. This integration is valuable for generating multiple management plans under various constraints [171]. A concise comparison of these methods is presented in Table 19, highlighting their strengths, limitations, and scalability.
where is the predicted maintenance cost, is the independent variable, and are regression coefficients, and is the error term. Time-series models like Autoregressive Integrated Moving Average (ARIMA) further capture temporal dependencies in maintenance data, enabling more accurate forecasting.
where w and b are parameters learned from the data.
where is the objective function to be minimized.
where is the value function, is the immediate cost, and is the next state.
where is the estimated value of taking action in state at time , is the immediate reward, is the discount factor, and is the learning rate.
where is the probability ratio, and is the advantage estimate.
Table 19.
Statistical, shallow ML, DL, optimizations, and DRL comparison highlighting their strengths, limitations, and scalability.
Figure 10.
Schematic architectures of (a) a plain DNN for supervised prediction (from [177,178]) and (b) a DRL agent interacting with its environment.
Recent advancements have seen the integration of artificial intelligence (AI) and machine learning (ML) into maintenance budgeting. These technologies enhance predictive capabilities and optimize maintenance interventions. Table 20 and Table 21 illustrate how artificial intelligence can enhance maintenance budget allocation models for existing bridge structures by providing a structured, rule-based framework that maps the Bridge Condition Index to specific maintenance treatments. By categorizing bridge conditions into defined ranges such as good, fair, or poor and linking each range to appropriate actions, AI algorithms can be trained to predict maintenance needs and prioritize interventions. This enables more data-driven and consistent decision-making, allowing maintenance budgets to be allocated efficiently based on the actual condition and projected deterioration of bridge assets. AI integration thus supports optimized resource use, timely interventions, and improved long-term infrastructure performance. In addition, 20 recent academic papers focus on optimizing bridge maintenance through life-cycle cost assessment, artificial intelligence, risk-based modeling, and sustainability-oriented strategies. These studies collectively reflect a growing emphasis on integrating advanced computational techniques, particularly reinforcement learning and neural networks, into bridge maintenance decision-making under uncertainty.
Table 20.
AI-based approaches for bridge maintenance: methods, tools, and performance metrics.
Table 21.
AI-based approaches for bridge maintenance: methods, tools, and performance metrics (Cont’d).
Several studies proposed reinforcement learning frameworks for maintenance optimization. Notable examples include [170,171,174,175,176], which leveraged deep reinforcement learning and multi-agent systems to automate policy formulation at both project and network levels. These methods enable adaptive decision-making that responds to evolving bridge conditions and inspection data, offering more dynamic and cost-effective maintenance scheduling. Gui et al. [160] and Yang [173] introduced comprehensive evaluation algorithms and adaptive risk-based models, prioritizing interventions based on structural reliability and deterioration rates. These models are especially relevant under climate-change scenarios, as addressed in [179], which integrates reliability-based approaches under future climatic uncertainty. Life-cycle cost analysis remains central in many contributions [162,166,170], providing economic justification for different maintenance scenarios. These models typically incorporate uncertainties related to corrosion, traffic loads, and material degradation. Razaqpur et al. [167] contributed a classic approach using dynamic programming, which remains foundational for modeling maintenance over long horizons. In terms of machine learning innovations, the authors in [163,164] presented neural network-based strategies, including self-organizing maps and entity embedding, for routine maintenance prediction and cluster-based decision support. These methods facilitate knowledge discovery in large-scale bridge datasets.
The shift toward sustainable and holistic management is emphasized elsewhere [169,172,180], which propose frameworks that balance economic, environmental, and social factors in policy-making. These studies use informed DRL and sustainability metrics to guide decision-makers in maintaining aging bridge networks in a resource-efficient manner. Collectively, these works underscore a paradigm shift from reactive to proactive and intelligent infrastructure management, supported by advanced analytics and AI. The integration of uncertainty modeling, climate adaptation, and multi-agent systems marks a promising future direction in sustainable bridge maintenance.
4.6. Optimization-Based Models
Optimization algorithms are broadly decomposed into two main categories: exact and approximate algorithms. In this context, exact algorithms are mathematically proven to find the globally optimal solution in finite time. Nonetheless, most of the real-world problems are of an NP-hard nature, and solving these problems using exact algorithms usually requires an exponential amount of time and memory [181,182]. In computational terms, these problems are difficult to solve using exact methods, which necessitates the adoption of metaheuristics that can deliver practical near-optimal solutions within reasonable time frames. Looking at the metaheuristics, they are defined as high-level procedures that accommodate basic rules and heuristics to discover efficient and mostly optimal approximate solutions to challenging large-scale combinatorial problems [183]. These algorithms can be segmented into distinct classes, involving biological-inspired algorithms, nature-inspired algorithms, physics-inspired algorithms, chemistry-inspired algorithms, mathematics-inspired algorithms, and music-inspired algorithms [184,185]. Table 22 records a summary of the applied metaheuristics in maintenance optimization works.
Table 22.
Description of the used metaheuristics in maintenance optimization literature.
Bridge maintenance optimization is a critical aspect of infrastructure management, aiming to ensure structural safety, extend service life, and minimize lifecycle costs. Over recent decades, various methodologies have been developed to enhance decision-making processes in bridge maintenance. Table 23, Table 24, Table 25, Table 26, Table 27 and Table 28 expound some of the several available metaheuristic-based maintenance optimization models. In this context, the designed models can be divided into two groups, single-objective and multi-objective, meanwhile satisfying a set of constraints that limit feasible solutions. Single-objective optimization involves one primary goal while multi-objective optimization encompasses two or more conflicting objectives; there is no single best solution, but instead, there is a set of tradeoff solutions, commonly known as “Pareto set” or “non-dominated solutions” [196,197]. One of the earliest works that harnessed single-objective optimization is the ref. of [198]. In it, the authors compared the performances of genetic algorithm and shuffled frog leaping in optimizing bridge deck repair programs. The optimization problem was formulated based on a single-objective function that minimizes the present worth of annual repair costs of all bridges. Four repair methods were considered, namely do nothing, light repair, medium repair, and extensive repair. It was illustrated that shuffled frog leaping was able to provide a significant better performance than genetic algorithm. Among the single-objective optimization studies, there is a study by Xu and Huang [199] who utilized AHP in conjunction with hybrid chaotic whale optimization algorithm to enhance the replacement decision system of bridge expansion and contraction installation. In this respect, AHP was implemented to derive the hierarchical weights of the assessment criteria of design requirements, construction requirements, and management requirements. In addition, Hybrid Chaotic Whale Optimization Algorithm (HCWOA) was applied to minimize the inconsistent comparison matrix through a single objective optimization problem. Eventually, the obtained weights of evaluating criteria are blended with their performance coefficients to form a performance index of the replacement plan. Moreover, it was evinced that HCWOA was able to improve the consistency levels of the comparison matrix more than the classical WOA and particle swarm optimization.
In the same field of optimization, Wang et al. [10] developed an improved electric fish optimization (IEFO) model for the purpose of reliability-based maintenance planning of bridge infrastructures. In this regard, Lévy Flight chaotic mechanism was adopted to boost the search efficiency of classical electric fish optimization. They deployed a biquadratic deterioration function to estimate the future reliability of bridge components over time. In addition, the optimal MR&R strategies were determined capitalizing on minimizing the annualized maintenance expenditures of bridge superstructure. Another significant body of research was delivered by Li et al. [200] who created a risk-based optimization model of deteriorated steel bridges. Monte Carlo simulation was utilized to estimate the failure mode parameters of flexure failure, shear failure, deflection failure, fatigue failure, and chloride attack. This study also involved building a risk-cost optimization program that minimizes the total risk of steel bridges using genetic algorithm.
Moving on to the multi-objective optimization, one of the first known works in this field was conducted by Liu and Frangopol [201] who planned a multi-objective genetic algorithm (MOGA) model for annual maintenance prioritization of bridges. The optimal annual intervention actions were determined based on: (1) minimizing the present worth of life cycle maintenance costs, (2) maximizing the lowest lifetime performance condition, and (3) maximizing the lowest lifetime safety index. Moreover, the uncertainties linked with structural behavior and lifecycle costs were assessed using Monte Carlo simulation. Later, Park et al. [202] deployed genetic algorithm to optimize the maintenance strategies of deteriorated steel box girder bridges. Pertaining to this, the lifetime maintenance scenarios were evaluated according to the minimization of lifecycle maintenance costs, maximization of lifecycle condition of bridge members, and maximization of reliability. Further, Monte Carlo simulation was employed to model the uncertainties related to the application of maintenance intervention action.
A third notable study was conducted by Alsharqawi et al. [12], who constructed a quality function deployment for defect-based condition assessment of bridge decks. The assessment process accommodated the defects of pop-outs, deposits, joint problems, spalling, delamination, corrosion, erosion and cracks. Then, they devised a multi-objective optimization model that implemented genetic algorithm to simultaneously minimize the total rehabilitation cost of the bridge deck and maximize its performance condition status. Fourthly, Allah Bukhsh et al. [14] established a multiyear maintenance planning method of bridge networks through merging multi attribute utility theory with genetic algorithm. In it, MAUT was used to rank bridges through their social and economic aspects. Then, a multi-objective genetic algorithm model was introduced based on the competing objectives: (1) minimization of the overall maintenance costs, and (2) maximization of the condition status of bridges.
Fifthly, Jaafaru and Agbelie [203] presented a maintenance planning framework that integrated machine learning, multicriteria decision analysis, and multi-objective optimization. Xgboost model was utilized to combine the bridge condition predictions that are retrieved from random forest, support vector machines, and artificial neural network. Subsequently, MAUT was undertaken to compute an aggregated score from the utility functions of performance indicators. Eventually, NSGA-II was applied to find the optimal maintenance treatments through minimizing the total maintenance expenses and maximizing the performance scores of bridges. A sixth research work by [204] amalgamated disease transmission concept and NSGA-II for the optimal assignment of maintenance funds of bridge network. The authors scrutinized the transmission paths of the diseases present in deck pavement, bearings and expansion joints. This includes studying design defects, maintenance defects and construction defects in each bridge component besides investigating their impact on the damage process. In addition to that, NSGA-II was exploited to design optimal maintenance plans across varying budget-demand scenarios.
Apart from genetic algorithm and its variants, some research endeavors adopted particle swarm optimization in their models. For instance, Yang et al. [205] introduced a multi objective particle swarm optimization model for preventive maintenance planning of deteriorated bridges. Additionally, Monte Carlo simulation was implemented to tackle the ambiguities pertaining to maintenance costs and deterioration process. It was envisaged that multi-objective particle swarm optimization (MOPSO) was able to achieve higher hyper volume value than NSGA-II, and island paradigm was found to provide more efficient solutions than the parallel computing paradigms of diffusion and master-slave. On the same note, Yang et al. [206] created a probabilistic life cycle optimization model of maintenance schedules considering the competing objectives of (1) minimization of lifecycle maintenance expenses, and (2) maximization of lifecycle performance. It was illustrated that MOPSO managed to render notably more efficient and diverse solutions as opposed to NSGA-II.
Table 23.
Summary of some of the metaheuristic-based maintenance optimization models.
Table 24.
Summary of some of the metaheuristic-based maintenance optimization models (Cont’d).
Table 25.
Summary of another set of metaheuristic-based maintenance optimization models.
Table 26.
Summary of another set of metaheuristic-based maintenance optimization models (Cont’d).
Table 27.
Summary of a third set of metaheuristic-based maintenance optimization models.
Table 28.
Summary of a third set of metaheuristic-based maintenance optimization models (Cont’d).
Table 29 outlines the main contributions of the exact optimization-based maintenance models. Ghafoori et al. [218] built a two-fold model for effective proactive planning of bridge maintenance. The first fold explored the performances of four machine learning techniques, namely support vector machines, decision tree, gradient boosting, and random forest to forecast the condition of concrete bridge elements. The second fold incorporated applying binary linear programming to maximize the average performance index of bridge elements subject to technical and economic requirements. Results delineated that random forest succeeded in outclassing other models according to the performance indicators of mean absolute error, mean squared error, mean absolute percentage error, and determination coefficient. Secondly, Mao et al. [219] established a nonlinear programming-based model for strategizing optimal maintenance schedules of bridge networks. Their work was envisioned based on two levels, whereas the first upper level comprised of a multi-objective non-linear programming model that aimed to minimize the traffic delays during maintenance while maximizing the number of bridges to be repaired given budgetary and crew constraints. The second lower level involved the use of simulated annealing algorithm to minimize the travel time in the bridge network. Also, the conducted sensitivity analysis demonstrated that the available budget, number of crews, traffic demand, and policy maker’s priorities critically influence the optimal bridge maintenance schedule.
Table 29.
Summary of some of the exact optimization-based maintenance models.
4.7. Critical Discussion
This review examined six paradigms for bridge management systems: multi-criteria decision-making, life cycle assessment, digital twin, inspection planning, artificial intelligence, and optimization. While each has its own specific application, they all present a unique combination of strengths and challenges. Optimization and MCDM techniques are applied to maintenance planning across all three decision-making levels: (1) element, (2) bridge, and (3) network. MCDM models are comparatively more subjective because of their reliance on experts’ judgements, weighting criteria, and subjective scores, which can introduce bias and reduce reproducibility. On the other hand, they are characterized by their abilities to integrate a wide and diverse range of criteria into a structured evaluation framework, and they can simultaneously both qualitative (e.g., strategic importance) and quantitative (e.g., cost, traffic volume, remaining service life) metrics. In addition, MCDM models require extensive data collection stemming from the large number of alternatives and the complexity of the decision criteria associated with the nature of bridge maintenance planning. In contrast, optimization models, particularly multi-objective optimization, are formulated to systematically and objectively balance conflicting objectives (e.g., minimizing cost while maximizing condition or safety), providing a Pareto-optimal frontier of solutions. This causes optimization models to be more scalable for managing regional or large-scale transportation networks, where the number of bridges and constraints would make expert-based scoring impractical. Despite these advantages, optimization-based models require more computational resources
Artificial intelligence-driven models can analyze intricate data sets and formulate responsive policies that surpass traditional static models. Further, they excel with large bridge datasets, offering scalability. However, their black-box nature raises concerns about trustworthiness, particularly in policy-making contexts that require accountability. Inspection planning models leverage advanced techniques like Monte Carlo simulation, Bayesian updating, non-destructive inspection, and multi-objective optimization to create dynamic and risk-based plans. Nonetheless, these models are highly data-dependent and contingent on a wide spectrum of precise inputs such as accurate historical deterioration rates, precise material properties, probabilistic failure models, reliable cost estimates, inspection technologies, crew size, and overtime policies. LCA models have evolved into an integrated framework that considers environmental impacts, user delays, resilience, and regional economic effects. This progression effectively addresses criticisms regarding the practicality concerns and sustainability aspects of traditional LCA methods. However, the comprehensive nature of LCA also presents challenges due to its reliance on detailed and accurate data, which may hinder the application of LCA models. Digital twin technology represents a groundbreaking shift in bridge management, offering the potential for dynamic, real-time integration of structural, geometric, and environmental data. By combining various NDI data, DTs enable engineers to visualize deterioration, conduct “what-if” scenarios, and virtually test reinforcement strategies before implementation. This capability transitions maintenance planning from static scheduling to proactive and adaptive management. However, the widespread adoption of DT faces significant obstacles. Establishing and maintaining a digital twin requires a robust IT infrastructure, continuous high-quality data streams, and the organizational capacity to manage vast amounts of information effectively.
Maintenance budget allocation models are an integral pillar of bridge management systems because they equip asset managers with informed, sustainable, strategic, and cost-effective action plans that maximize long-term network performance while satisfying budget limits and sustainable infrastructure requirements. In practice, these models compile many types of information, like a bridge’s age, type, traffic levels, inspection results, repair history, climate, natural hazards, costs of different maintenance options, sustainability needs, and the budget available. Using this input, the models generate practical outputs so that bridge managers can sustain clear priorities for (1) which bridges or elements need attention, (2) what intervention action is required, and (3) when to apply the maintenance intervention. Digital Twin can act as a central platform for a BMS, integrating disparate data types such as geometric and spatial information, nondestructive inspection and structural health monitoring data, environmental and operational conditions, material and physical properties, as well as inspection and maintenance histories. In addition, the digital twin model should house an integrated LCA module that quantifies the lifetime environmental impact (e.g., carbon emissions, energy use) and life cycle costs of each maintenance strategy. Leveraging the digital twin platform, asset managers can thereby run sophisticated artificial intelligence, optimize inspection schedules, and generate proactive, cost-effective maintenance plans.
4.8. Summary of Case Studies
This section outlines some of the actual case studies utilized to test and validate the reported bridge maintenance models (see Table 30).
Table 30.
Summary of practical case studies of bridge maintenance models.
5. Conclusions
This study offers a comprehensive and integrated review of bridge maintenance budget allocation models through a dual approach combining systematic literature analysis and scientometric mapping. By analyzing 380 peer-reviewed publications from 1990 to 2025 sourced from Scopus and Web of Science, it identifies key research trends, methodological advancements, and collaborative networks that have shaped the field. The use of tools like VOSviewer and Bibliometrix R provide valuable visualizations of the scientific landscape, while the in-depth examination of optimization models, decision-making variables, and metaheuristic techniques adds critical technical insight. Ultimately, the findings of this review provide a robust foundation for infrastructure asset managers, offering practical guidance and strategic frameworks for allocating maintenance funds efficiently and sustainably to preserve bridge performance amidst ongoing deterioration challenges. This study provides a comprehensive and structured investigation into bridge maintenance fund allocation models through an integrated methodological framework combining scientometric and systematic literature reviews. By analyzing 380 peer-reviewed articles sourced from Scopus and Web of Science between 1990 and 2025, the paper identifies key trends, thematic evolutions, and research clusters shaping the field. The use of VOSviewer and Bibliometrix tools facilitated the visualization of co-authorship networks, keyword co-occurrences, and citation patterns, highlighting influential contributors and evolving priorities in bridge maintenance research.
The systematic literature review further dissects present research studies into six prominent themes: (1) multi-criteria decision making, (2) life cycle assessment, (3) digital twin, (4) inspection planning, (5) artificial intelligence, and (6) optimization. The findings reveal a notable shift towards the integration of intelligent decision-support systems, multi-objective optimization, and sustainability-oriented approaches to bridge asset management. Ultimately, this research contributes a practical reference for academics, policymakers, and infrastructure managers seeking to enhance the efficiency, cost-effectiveness, and resilience of bridge maintenance strategies. It underscores the importance of data-driven, adaptive methodologies in supporting long-term infrastructure sustainability amid growing challenges related to aging structures and constrained public budgets. Several avenues for future research and development have been identified as follows to enhance the robustness, adaptability, and sustainability of maintenance budget allocation models for existing bridge infrastructure. Future models should increasingly integrate real-time data from SHM systems (e.g., nanosensors) and IoT devices to allow for dynamic and data-driven budget allocation. SHM systems are characterized by their high sensitivity, rapid response, and simultaneous multi-parameter monitoring, and hence they can provide continuous and real-time data on a bridge’s response (e.g., strain, vibration, displacement). These technologies can help in capturing structural performance, actual deterioration patterns, improving accuracy in intervention planning, and life-cycle cost analysis. By the same token, NDI needs to be systematically blended with maintenance planning models, allowing for more accurate and informed proactive repair decisions. While metaheuristics and classical machine learning have been widely applied, there is growing potential for deep learning, reinforcement learning, and hybrid AI models (e.g., combining neural networks with probabilistic reasoning) to deliver adaptive and intelligent decision-making in budget allocation under uncertain and dynamic conditions.
Maintenance planning must account for the increasing risks posed by climate change. Future models should integrate environmental resilience metrics, hazard vulnerability assessments, and scenario-based planning to guide budget prioritization in a changing climate. In addition to that, a pressing need exists to address uncertainties from deterioration modeling and funding fluctuations to policy shifts using stochastic simulation, Bayesian updating, and robust optimization approaches to inform resilient budget strategies. Prospective research should explore decentralized budget planning frameworks that support coordination across multiple agencies and jurisdictions. Blockchain or distributed ledger technologies may support transparent and accountable resource allocation across complex bridge networks. Furthermore, NDI performance curves can be integrated into a digital twin-driven framework that can dynamically adapt inspection schedules and resource allocation. As for the employed analytical tools, maintenance optimization models should leverage chaotic metaheuristics and hybrid metaheuristics to enhance convergence efficiency and avoid local optima. With regards to MCDM-based model, it is anticipated that Adopting modern MCDM techniques—like MARCOS or LOPCOW—into bridge maintenance optimization will enable agencies to prioritize interventions more effectively meanwhile, balancing budget constraints. It is also observed that there is lack of integrated frameworks that explicitly incorporate resilience against natural disasters into bridge maintenance scheduling. Current maintenance models primarily focus on structural deterioration and cost-effectiveness, overlooking the occurrence of natural extreme events. Thus, this work bridges these domains by developing a methodology that optimizes maintenance plans not just for longevity, but for enhancing structural resilience and guaranteeing post-disaster preparedness of transportation networks. It is also advised to devote more research endeavors towards developing holistic decision-making frameworks that directly account for the sustainability dimensions of maintenance interventions. This includes quantifying the social disruption caused by long-term closures and evaluating the environmental footprint of different maintenance materials and methods (e.g., embodied carbon, and waste generation). Finally, the development of integrated decision support tools tailored for asset managers, with interactive dashboards and visualization interfaces, will be critical for translating complex models into actionable insights, whether for a short-term or long-term basis.
While this review aims to provide a comprehensive and objective analysis of the maintenance fund allocation of bridges, it still has certain shortcomings, which are discussed as follows. First, this review focused only on journal articles and book chapters, excluding conference proceedings and technical reports, which might contain insightful information. Journal articles and book chapters are widely accepted for their role in synthesizing established knowledge. However, the absence of conference proceedings and technical studies may have narrowed down the scope of our analysis. Secondly, this review is restricted to publications in the English language, which may underrepresent research and advancements published in other languages. Thirdly, this review’s analysis was solely reliant on Web of Science and Scopus databases. Despite the extensive coverage of these databases and their strong representation, the main body of knowledge in bridge maintenance allocation, it is probable that some relevant documents indexed in other databases were omitted. Thus, future research should incorporate additional databases and sources to achieve a more consolidated analysis of the state of the art.
Author Contributions
Conceptualization, E.M.A., A.A.-S., K.E. and M.E.; methodology, E.M.A., A.A.-S. and K.E.; formal analysis, E.M.A. and A.A.-S.; data curation, E.M.A., A.A.-S., K.E. and M.E.; investigation, E.M.A., A.A.-S. and K.E.; resources, E.M.A., A.A.-S., K.E. and M.E.; writing—original draft preparation, E.M.A., A.A.-S., K.E. and M.E.; writing—review and editing, E.M.A., A.A.-S., K.E. and M.E. All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding.
Data Availability Statement
Some or all data that support the findings of this study are available from the corresponding author upon reasonable request.
Conflicts of Interest
The authors declare no conflicts of interest.
Abbreviations
The following abbreviations are utilized throughout this manuscript:
| Acronym | Description | Acronym | Description |
| ASCE | American Society of Civil Engineers | FHWA | Federal Highway Administration |
| BMS | Bridge Management System | MR & R | Maintenance, repair and rehabilitation |
| PRISMA | Preferred Reporting Items for Systematic Reviews and Meta-Analyses | TOPSIS | Technique for Order Preference by Similarity to an Ideal Solution |
| GRA | Grey Relational Analysis | CWM | Constant Weight Model |
| FVWM | Factor-based Variable Weight Model | FAVWM | Factor and Age-based Variable Weight Model |
| MAUT | Multi Attribute Utility Theory | WASPAS | Weighted Aggregated Sum Product Assessment |
| T2NN | Type-2 neutrosophic number | SMART | Specific, Measurable, Achievable, Relevant, and Time-bound |
| VIKOR | VIseKriterijumska Optimizacija i Kompromisno Rešenje | WSM | Weighted Sum Model |
| ARAS | Additive Ratio Assessment | COPRAS | Complex Proportional Assessment |
| MOORA | Multi-Objective Optimization on the Ratio Analysis | EDAS | Evaluation Based on Distance from Average Solution |
| SAW | Simple Additive Weighting | ELECTRE | ELimination Et Choix Traduisant la REalité |
| DEMATEL | Decision Making Trial and Evaluation Laboratory | BWM | Best-Worst Method |
| CRITIC | Criteria Importance Through Intercriteria Correlation | SWARA | Step-wise Weight Assessment Ratio Analysis |
| FUCOM | Full Consistency Method | MEREC | Method based on the Removal Effects of Criteria |
| SDV | Standard Deviation | CILOS | Criterion Impact Loss |
| LOPCOW | Logarithmic Percentage Change-driven O Weighting | PROMETHEE | Preference Ranking Organization Method for Enrichment Evaluations |
| TLS | Terrestrial Laser Scanning | EV | Eigenvector |
| BrIM | Bridge Information Modeling | ILP | Integer Linear Programming |
| EW | Entropy Weighting | GRD | Grey Relational Degree |
| CODAS | Combinative Distance-based Assessment | SE | Shannon Entropy |
| FL | Fuzzy Logic | DEA | Data Envelopment Analysis |
| IWO | Invasive Weed Optimization | SHM | Structural Health Monitoring |
| LCCA | Life Cycle Cost Analysis | UAV | Unmanned Aerial Vehicle |
| ACO | Ant Colony Optimization | MPI | Magnetic Particle Inspection |
| AI | Artificial Intelligence | NDI | Non-destructive Inspection |
| BHI | Bridge Health Index | NDT | Non-destructive Testing |
| C5.0 | Boosting Decision Tree algorithm | PI | Penetrant Inspection |
| DES | Discrete Event Simulation | PoD | Probability of Detection |
| ECI | Eddy Current Inspection | PR | Polarization Resistance |
| ER | Electrical Resistivity | PSO | Particle Swarm Optimization |
| GA | Genetic Algorithm | RC | Reinforced Concrete |
| GPR | Ground-Penetrating Radar | RBI | Risk-Based Inspection |
| HCP | Half-Cell Potential | UI | Ultrasonic Inspection |
| IE | Impact Echo | BIM | Building Information Modeling |
| IRT | Infrared Thermography | USW | Ultrasonic Surface Wave |
| LPI | Liquid Penetrant Inspection | UPE | Ultrasonic Pulse Echo |
| MDP | Markov Decision Process | VI | Visual Inspection |
| MCMC | Markov Chain Monte Carlo | VoI | Value of Information |
| ML | Machine Learning | DL | Deep Learning |
| BriMai_all | Maintenance fund allocation models of bridges | AHP | Analytica Hierarchy Process |
| ANP | Analytical Network Process | LCA | Life Cycle Assessment |
| MCDM | Multi-criteria decision making | DRL | Deep Reinforcement Learning |
| PNN | Probabilistic Neural Network | PCA | Principal Component Analysis |
| RBFN | Radial Basis Function Network | SVM | Support Vector Machines |
| CNN | Convolutional Neural Network | LSTM | Long Short-Term Memory |
| DNN | Deep Neural Network | RL | Reinforcement Learning |
| SOMCM | and Self-Organizing Map-based Cluster Merging | DT | Decision Tree |
| NN-EE | Neural Networks with Entity Embeddings | DQN | Deep Q-Network |
| NSGA-II | Non-dominated Sorting Genetic Algorithm II | MAR-PPO | Proximal Policy Optimization and its multi-agent variants |
| DP | Dynamic programming | ARIMA | Autoregressive Integrated Moving Average |
| DCMA2C | Double-Critic Multi-Agent A2C | ConvAE-DQN | Convolutional Autoencoder–Structured Deep Q-Network |
| HCWOA | Hybrid Chaotic Whale Optimization Algorithm | MOPSO | Multi-objective Particle Swarm Optimization |
| QFD | Quality Function Deployment | FST | Fuzzy Set Theory |
| MCS | Monte Carlo Simulation | MOGA | Multi-objective Genetic Algorithm |
Appendix A
Table A1.
PRISMA checklist of this research study.
Figure A1.
PRISMA flow diagram of this research study.
References
- Durango-Cohen, P.L.; Madanat, S.M. Introduction to Special Issue on Transportation Infrastructure Management. EURO J. Transp. Logist. 2015, 4, 1–4. [Google Scholar] [CrossRef] [Scilit]
- Abdelkader, E.M.; Zayed, T.; Faris, N. Synthesized Evaluation of Reinforced Concrete Bridge Defects, Their Non-Destructive Inspection and Analysis Methods: A Systematic Review and Bibliometric Analysis of the Past Three Decades. Buildings 2023, 13, 800. [Google Scholar] [CrossRef] [Scilit]
- Abdelkhalek, S.; Zayed, T. Optimizing the Inspection Schedule for Bridge Networks. Can. J. Civil. Eng. 2023, 50, 721–736. [Google Scholar] [CrossRef] [Scilit]
- Mahdi, I.M.; Khalil, A.H.; Mahdi, H.A.; Mansour, D.M.M. Decision Support System for Optimal Bridge’ Maintenance. Int. J. Constr. Manag. 2022, 22, 342–356. [Google Scholar] [CrossRef] [Scilit]
- Ibrahim, A.; Abdelkhalek, S.; Zayed, T.; Qureshi, A.H.; Mohammed Abdelkader, E. A Comprehensive Review of the Key Deterioration Factors of Concrete Bridge Decks. Buildings 2024, 14, 3425. [Google Scholar] [CrossRef] [Scilit]
- Taherkhani, A.; Mo, W.; Bell, E.; Han, F. Towards Equitable Infrastructure Asset Management: Scour Maintenance Strategy for Aging Bridge Systems in Flood-Prone Zones Using Deep Reinforcement Learning. Sustain. Cities Soc. 2024, 114, 105792. [Google Scholar] [CrossRef] [Scilit]
- Federal Highway Administration (FHWA) Bridges & Structures. Bridge Condition by Highway System 2020. Available online: https://www.fhwa.dot.gov/bridge/nbi/no10/condition19.cfm (accessed on 2 May 2025).
- American Society of Civil Engineers (ASCE) 2025 Report Card for America’s Infrastructure. Available online: https://infrastructurereportcard.org/wp-content/uploads/2025/03/Bridges.pdf (accessed on 2 June 2025).
- Federation of Canadian Municipalities (FCM) The 2019 Canada Infrastructure Report Card. Available online: https://cnam.ca/2019-canadian-infrastructure-report-card/ (accessed on 2 May 2025).
- Wang, Y.; Wang, Y.; Ni, J.; Zhang, H. Reliability-Centric Maintenance Planning for Bridge Infrastructure: A Novel Method Based on Improved Electric Fish Optimization. Buildings 2024, 14, 3583. [Google Scholar] [CrossRef] [Scilit]
- Abdelkader, E.M.; Moselhi, O.; Marzouk, M.; Zayed, T. An Exponential Chaotic Differential Evolution Algorithm for Optimizing Bridge Maintenance Plans. Autom. Constr. 2022, 134, 104107. [Google Scholar] [CrossRef] [Scilit]
- Alsharqawi, M.; Abu Dabous, S.; Zayed, T.; Hamdan, S. Budget Optimization of Concrete Bridge Decks under Performance-Based Contract Settings. J. Constr. Eng. Manag. 2021, 147, 04021040. [Google Scholar] [CrossRef] [Scilit]
- Miyamoto, A.; Kawamura, K.; Nakamura, H. Development of a Bridge Management System for Existing Bridges. Adv. Eng. Softw. 2001, 32, 821–833. [Google Scholar] [CrossRef] [Scilit]
- Allah, B.Z.; Stipanovic, I.; Doree, A.G. Multi-Year Maintenance Planning Using Multi-Attribute Utility Theory and Genetic Algorithms. Eur. Transp. Res. Rev. 2020, 12, 1–13. [Google Scholar] [CrossRef] [Scilit]
- Miyamoto, A.; Kawamura, K.; Nakamura, H. Bridge Management System and Maintenance Optimization for Existing Bridges. Comput. Aided Civil. Infrastruct. Eng. 2000, 15, 45–55. [Google Scholar] [CrossRef] [Scilit]
- Orcesia, A.D.; Cremona, C.F. Optimal Maintenance Strategies for Bridge Networks Using the Supply and Demand Approach. Struct. Infrastruct. Eng. 2011, 7, 765–781. [Google Scholar] [CrossRef] [Scilit]
- van Eck, N.J.; Waltman, L. Software Survey: VOSviewer, a Computer Program for Bibliometric Mapping. Scientometrics 2010, 84, 523–538. [Google Scholar] [CrossRef] [Scilit]
- Page, M.J.; McKenzie, J.E.; Bossuyt, P.M.; Boutron, I.; Hoffmann, T.C.; Mulrow, C.D.; Shamseer, L.; Tetzlaff, J.M.; Akl, E.A.; Brennan, S.E.; et al. The PRISMA 2020 Statement: An Updated Guideline for Reporting Systematic Reviews. BMJ 2021, 372, n71. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Page, M.J.; McKenzie, J.E.; Bossuyt, P.M.; Boutron, I.; Hoffmann, T.C.; Mulrow, C.D.; Shamseer, L.; Tetzlaff, J.M.; Moher, D. Updating Guidance for Reporting Systematic Reviews: Development of the PRISMA 2020 Statement. J. Clin. Epidemiol. 2021, 134, 103–112. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Moher, D.; Liberati, A.; Tetzlaff, J.; Altman, D.G. Preferred Reporting Items for Systematic Reviews and Meta-Analyses: The PRISMA Statement. BMJ 2009, 339, 332–336. [Google Scholar] [CrossRef]
- Al-Ashmori, A.; Basri, S.B.; Dominic, P.D.D.; Capretz, L.F.; Muneer, A.; Balogun, A.O.; Gilal, A.R.; Ali, R.F. Classifications of Sustainable Factors in Blockchain Adoption: A Literature Review and Bibliometric Analysis. Sustainability 2022, 14, 5176. [Google Scholar] [CrossRef] [Scilit]
- Liu, Y.; He, H. Scientometrics of Scientometrics Based on Web of Science Core Collection Data between 1992 and 2020. Information 2023, 14, 637. [Google Scholar] [CrossRef] [Scilit]
- Cretu, D.M.; Grosseck, G. A Bibliometric Analysis of Romanian Educational Research in Web of Science: Trends, Challenges, and Opportunities for Global Integration. Educ. Sci. 2025, 15, 358. [Google Scholar] [CrossRef] [Scilit]
- Kalogeraki, M.; Antoniou, F. Claim Management and Dispute Resolution in the Construction Industry: Current Research Trends Using Novel Technologies. Buildings 2024, 14, 967. [Google Scholar] [CrossRef] [Scilit]
- Lancho-Barrantes, B.S.; Cantu-Ortiz, F.J. Quantifying the Publication Preferences of Leading Research Universities. Scientometrics 2021, 126, 2269–2310. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Ibrahim, A.; Zayed, T.; Lafhaj, Z. Enhancing Construction Performance: A Critical Review of Performance Measurement Practices at the Project Level. Buildings 2024, 14, 1988. [Google Scholar] [CrossRef] [Scilit]
- Farouk, A.M.; Rahman, R.A. Integrated Applications of Building Information Modeling in Project Cost Management: A Systematic Review. J. Eng. Des. Technol. 2025, 23, 287–305. [Google Scholar] [CrossRef] [Scilit]
- Prabhakaran, A.; Mahamadu, A.M.; Mahdjoubi, L. Understanding the Challenges of Immersive Technology Use in the Architecture and Construction Industry: A Systematic Review. Autom. Constr. 2022, 137, 104228. [Google Scholar] [CrossRef] [Scilit]
- Masood, R.; Lim, J.B.P.; González, V.A.; Roy, K.; Khan, K.I.A. A Systematic Review on Supply Chain Management in Prefabricated House-Building Research. Buildings 2022, 12, 40. [Google Scholar] [CrossRef] [Scilit]
- Aria, M.; Cuccurullo, C. Bibliometrix: An R-Tool for Comprehensive Science Mapping Analysis. J. Informetr. 2017, 11, 959–975. [Google Scholar] [CrossRef] [Scilit]
- Frangopol, D.M.; Liu, M. Maintenance and Management of Civil Infrastructure Based on Condition, Safety, Optimization, and Life-Cycle Cost. Struct. Infrastruct. Eng. 2007, 18, 96–108. [Google Scholar] [CrossRef] [Scilit]
- Dan Frangopol, B.M.; Lin, K.-Y.; Estes, A.C. Life-Cycle Cost Design Of Deteriorating Structures. J. Struct. Eng. 1997, 123, 1390–1401. [Google Scholar] [CrossRef] [Scilit]
- Allen Estes, B.C.; Frangopol, D.M. Repair Optimization of Highway Bridges Using System Reliability Approach. J. Struct. Eng. 1999, 125, 766–775. [Google Scholar] [CrossRef] [Scilit]
- Phung, M.D.; Quach, C.H.; Dinh, T.H.; Ha, Q. Enhanced Discrete Particle Swarm Optimization Path Planning for UAV Vision-Based Surface Inspection. Autom. Constr. 2017, 81, 25–33. [Google Scholar] [CrossRef] [Scilit]
- Kong, J.S.; Frangopol, D.M. Life-Cycle Reliability-Based Maintenance Cost Optimization of Deteriorating Structures with Emphasis on Bridges. J. Struct. Eng. 2003, 129, 818–828. [Google Scholar] [CrossRef] [Scilit]
- Bocchini, P.; Frangopol, D.M. Optimal Resilience- and Cost-Based Postdisaster Intervention Prioritization for Bridges along a Highway Segment. J. Bridge Eng. 2012, 17, 117–129. [Google Scholar] [CrossRef] [Scilit]
- Morcous, G.; Lounis, Z. Maintenance Optimization of Infrastructure Networks Using Genetic Algorithms. Autom. Constr. 2005, 14, 129–142. [Google Scholar] [CrossRef] [Scilit]
- Okasha, N.M.; Frangopol, D.M. Lifetime-Oriented Multi-Objective Optimization of Structural Maintenance Considering System Reliability, Redundancy and Life-Cycle Cost Using GA. Struct. Saf. 2009, 31, 460–474. [Google Scholar] [CrossRef] [Scilit]
- Van Noortwijk, J.M.; Frangopol, D.M. Two Probabilistic Life-Cycle Maintenance Models for Deteriorating Civil Infrastructures. Probabilistic Eng. Mech. 2004, 19, 345–359. [Google Scholar] [CrossRef]
- Lounis, Z.; McAllister, T.P. Risk-Based Decision Making for Sustainable and Resilient Infrastructure Systems. J. Struct. Eng. 2016, 142, F4016005. [Google Scholar] [CrossRef] [Scilit]
- Bradford, S.C. Sources of Information on Specific Subjects. Engineering 1934, 137, 85–86. [Google Scholar] [CrossRef] [Scilit]
- Yau, N.J.; Liao, H.K.; Tabor, J.M.M.; Jallow, M. An AHP-Based Prioritization Model for Bridge Maintenance after Natural Disasters. J. Chin. Inst. Eng. Trans. Chin. Inst. Eng. Ser. A 2023, 46, 255–266. [Google Scholar] [CrossRef] [Scilit]
- Rashidi, M.; Samali, B.; Sharafi, P. A New Model for Bridge Management: Part B: Decision Support System for Remediation Planning. Aust. J. Civil. Eng. 2016, 14, 46–53. [Google Scholar] [CrossRef] [Scilit]
- Abu Dabous, S.; Alkass, S. Decision Support Method for Multi-Criteria Selection of Bridge Rehabilitation Strategy. Constr. Manag. Econ. 2008, 26, 883–893. [Google Scholar] [CrossRef] [Scilit]
- Navarro, I.J.; Martí, J.V.; Yepes, V. Analytic Network Process-Based Sustainability Life Cycle Assessment of Concrete Bridges in Coastal Regions. Sustainability 2022, 14, 688. [Google Scholar] [CrossRef] [Scilit]
- Contreras-Nieto, C.; Shan, Y.; Lewis, P.; Hartell, J.A. Bridge Maintenance Prioritization Using Analytic Hierarchy Process and Fusion Tables. Autom. Constr. 2019, 101, 99–110. [Google Scholar] [CrossRef] [Scilit]
- Salem, O.M.; Miller, R.A.; Deshpande, A.S.; Arurkar, T.P. Multi-Criteria Decision-Making System for Selecting an Effective Plan for Bridge Rehabilitation. Struct. Infrastruct. Eng. 2013, 9, 806–816. [Google Scholar] [CrossRef] [Scilit]
- Xu, X.; Huang, Q.; Ren, Y.; Zhao, D.Y.; Zhang, D.Y.; Sun, H. Bin Condition Evaluation of Suspension Bridges for Maintenance, Repair and Rehabilitation: A Comprehensive Framework. Struct. Infrastruct. Eng. 2019, 15, 555–567. [Google Scholar] [CrossRef] [Scilit]
- Wakchaure, S.S.; Jha, K.N. Determination of Bridge Health Index Using Analytical Hierarchy Process. Constr. Manag. Econ. 2012, 30, 133–149. [Google Scholar] [CrossRef] [Scilit]
- Alshibani, A.; Abu Saa, A.S.; Hassanain, M.A.; Bubshait, A.; Shash, A. Decision Support Model for Allocating Maintenance Budgets for Bridges. Appl. Sci. 2023, 13, 9679. [Google Scholar] [CrossRef] [Scilit]
- Rashidi, M.; Ghodrat, M.; Samali, B.; Kendall, B.; Zhang, C. Remedial Modelling of Steel Bridges through Application of Analytical Hierarchy Process (AHP). Appl. Sci. 2017, 7, 168. [Google Scholar] [CrossRef] [Scilit]
- Dabous, S.A.; Alkass, S. Managing Bridge Infrastructure under Budget Constraints: A Decision Support Methodology. Can. J. Civil. Eng. 2011, 38, 1227–1237. [Google Scholar] [CrossRef] [Scilit]
- Dabous, S.A.; Alkass, S. A Multi-Attribute Ranking Method for Bridge Management. Eng. Constr. Archit. Manag. 2010, 17, 282–291. [Google Scholar] [CrossRef] [Scilit]
- Navarro, I.J.; Yepes, V.; Martí, J.V. Sustainability Assessment of Concrete Bridge Deck Designs in Coastal Environments Using Neutrosophic Criteria Weights. Struct. Infrastruct. Eng. 2020, 16, 949–967. [Google Scholar] [CrossRef] [Scilit]
- Gokasar, I.; Deveci, M.; Kalan, O. CO2 Emission Based Prioritization of Bridge Maintenance Projects Using Neutrosophic Fuzzy Sets Based Decision Making Approach. Res. Transp. Econ. 2022, 91, 101029. [Google Scholar] [CrossRef] [Scilit]
- Ors, D.M.; Ebid, A.M.; Mahdi, I.M.; Mahdi, H.A. Decision Support System to Select the Optimum Construction Techniques for Bridge Piers. Ain Shams Eng. J. 2023, 14, 102152. [Google Scholar] [CrossRef] [Scilit]
- Das, R.; Nakano, M. A Multi-Criteria Decision-Making Model Using Socio-Technical Attributes for Transportation Bridge Maintenance Prioritisation. Int. J. Constr. Manag. 2023, 23, 579–585. [Google Scholar] [CrossRef] [Scilit]
- Lad, V.H.; Patel, D.A.; Chauhan, K.A.; Patel, K.A. Prioritisation of Bridge for Improving Its Resilience Using Multi-Criteria Decision-Making Techniques. Eng. Constr. Archit. Manag. 2024, 31, 2952–2976. [Google Scholar] [CrossRef] [Scilit]
- Gao, Z.; Liang, R.Y.; Xuan, T. VIKOR Method for Ranking Concrete Bridge Repair Projects with Target-Based Criteria. Results Eng. 2019, 3, 100018. [Google Scholar] [CrossRef] [Scilit]
- Tan, Y.; Zhang, Z.; Wang, H.; Zhou, S. Gray Relation Analysis for Optimal Selection of Bridge Reinforcement Scheme Based on Fuzzy-AHP Weights. Math. Probl. Eng. 2021, 2021, 8813940. [Google Scholar] [CrossRef] [Scilit]
- Rogulj, K.; Pamuković, J.K.; Antucheviciene, J.; Zavadskas, E.K. Intuitionistic Fuzzy Decision Support Based on EDAS and Grey Relational Degree for Historic Bridges Reconstruction Priority. Soft Comput. 2022, 26, 9419–9444. [Google Scholar] [CrossRef] [Scilit]
- Tabor, J.M.M.; Yau, N.J.; Liao, H.K. Maintenance Prioritisation Framework for Taiwan’s Pedestrian Bridges. Struct. Infrastruct. Eng. 2024, 20, 1500–1514. [Google Scholar] [CrossRef] [Scilit]
- Mohamadiazar, N.; Ebrahimian, A.; Azizinamini, A. Equitable Prioritization of Bridge Rehabilitation Projects Using a Spatial Multi-Criteria Decision Support Framework. Transp. Res. Rec. 2024, 2678, 2069–2076. [Google Scholar] [CrossRef] [Scilit]
- Seçer, M.; Saylan, A.A. Evaluation of Corrosion Management Strategies for Steel Truss Bridges Based on Ultimate Load Capacity and Lifetime Direct Cost. Struct. Infrastruct. Eng. 2025, 21, 675–694. [Google Scholar] [CrossRef] [Scilit]
- Salmaninezhad, M.; Jazayeri Moghaddas, S.M. A Multi-Attribute Approach to Select the Best Method for Repairing River Bridge Columns. Eng. Constr. Archit. Manag. 2023, 30, 1–18. [Google Scholar] [CrossRef] [Scilit]
- Karaaslan, E.; Bagci, U.; Catbas, N. A Novel Decision Support System for Long-term Management of Bridge Networks. Appl. Sci. 2021, 11, 5928. [Google Scholar] [CrossRef] [Scilit]
- Chakraborty, S.; Datta, H.N.; Kalita, K.; Chakraborty, S. A Narrative Review of Multi-Objective Optimization on the Basis of Ratio Analysis (MOORA) Method in Decision Making. Opsearch 2023, 60, 1844–1887. [Google Scholar] [CrossRef] [Scilit]
- Keshavarz-Ghorabaee, M.; Amiri, M.; Zavadskas, E.K.; Turskis, Z.; Antucheviciene, J. Determination of Objective Weights Using a New Method Based on the Removal Effects of Criteria (MEREC). Symmetry 2021, 13, 525. [Google Scholar] [CrossRef] [Scilit]
- Keshavarz-Ghorabaee, M. Assessment of Distribution Center Locations Using a Multi-Expert Subjective–Objective Decision-Making Approach. Sci. Rep. 2021, 11, 19461. [Google Scholar] [CrossRef] [Scilit]
- Kizielewicz, B.; Tomczyk, T.; Gandor, M.; Sałabun, W. Subjective Weight Determination Methods in Multi-Criteria Decision-Making: A Systematic Review. Procedia Comput. Sci. 2024, 246, 5396–5407. [Google Scholar] [CrossRef] [Scilit]
- Zakeri, S.; Chatterjee, P.; Konstantas, D.; Ecer, F. A Decision Analysis Model for Material Selection Using Simple Ranking Process. Sci. Rep. 2023, 13, 8631. [Google Scholar] [CrossRef] [Scilit]
- Altıntaş, F.F. A Novel Approach To Measuring Criterion Weights In Multiple Criteria Decision Making: Cubic Effect-Based Measurement (CEBM). Nicel Bilim. Derg. 2023, 5, 151–195. [Google Scholar] [CrossRef] [Scilit]
- Ayan, B.; Abacıoğlu, S.; Basilio, M.P. A Comprehensive Review of the Novel Weighting Methods for Multi-Criteria Decision-Making. Information 2023, 14, 285. [Google Scholar] [CrossRef] [Scilit]
- Stoilova, S. A New Aggregated Multi-Criteria Approach for Evaluation of the Autonomous Metro Systems’ Performance in the European Countries. Symmetry 2022, 14, 2025. [Google Scholar] [CrossRef] [Scilit]
- Torbacki, W. Achieving Sustainable Mobility in the Szczecin Metropolitan Area in the Post-COVID-19 Era: The DEMATEL and PROMETHEE II Approach. Sustainability 2021, 13, 2672. [Google Scholar] [CrossRef] [Scilit]
- Machado, R.H.C.; Conceição, S.V.; Pelissari, R.; Amor, S.B.; Resende, T.L. A Multiple Criteria Framework to Assess Learning Methodologies. Think. Ski. Creat. 2023, 48, 101290. [Google Scholar] [CrossRef] [Scilit]
- Cinelli, M.; Kadziński, M.; Gonzalez, M.; Słowiński, R. How to Support the Application of Multiple Criteria Decision Analysis? Let Us Start with a Comprehensive Taxonomy. Omega 2020, 96, 102261. [Google Scholar] [CrossRef] [Scilit]
- Li, Y.; Deng, J.; Wang, Y.; Liu, H.; Peng, L.; Zhang, H.; Liang, Y.; Feng, Q. The Condition Evaluation of Bridges Based on Fuzzy BWM and Fuzzy Comprehensive Evaluation. Appl. Sci. 2025, 15, 2904. [Google Scholar] [CrossRef] [Scilit]
- Mohammadi, M.; Rashidi, M.; Yu, Y.; Samali, B. Integration of TLS-Derived Bridge Information Modeling (BrIM) with a Decision Support System (DSS) for Digital Twinning and Asset Management of Bridge Infrastructures. Comput. Ind. 2023, 147, 103881. [Google Scholar] [CrossRef] [Scilit]
- Rogulj, K.; Pamuković, J.K.; Ivić, M. Hybrid Mcdm Based on Vikor and Cross Entropy under Rough Neutrosophic Set Theory. Mathematics 2021, 9, 1334. [Google Scholar] [CrossRef] [Scilit]
- Darban, S.; Tehrani, H.G.; Karballaeezadeh, N.; Mosavi, A. Application of Analytical Hierarchy Process for Structural Health Monitoring and Prioritizing Concrete Bridges in Iran. Appl. Sci. 2021, 11, 8060. [Google Scholar] [CrossRef] [Scilit]
- Ikpong, A.; Chandra, A.; Bagchi, A. Alternative to Ahp Approach to Criteria Weight Estimation in Highway Bridge Management. Can. J. Civil. Eng. 2021, 48, 1181–1191. [Google Scholar] [CrossRef] [Scilit]
- Abdelkader, E.M.; Marzouk, M.; Zayed, T. An Invasive Weed Optimization-Based Fuzzy Decision-Making Framework for Bridge Intervention Prioritization in Element and Network Levels. Int. J. Inf. Technol. Decis. Mak. 2020, 19, 1189–1246. [Google Scholar] [CrossRef] [Scilit]
- Allah Bukhsh, Z.; Stipanovic, I.; Klanker, G.; O’ Connor, A.; Doree, A.G. Network Level Bridges Maintenance Planning Using Multi-Attribute Utility Theory. Struct. Infrastruct. Eng. 2019, 15, 872–885. [Google Scholar] [CrossRef] [Scilit]
- Bukhsh, Z.A.; Stipanovic, I.; Palic, S.S.; Klanker, G. Robustness of the Multi-Attribute Utility Model for Bridge Maintenance Planning. Balt. J. Road Bridge Eng. 2018, 13, 404–415. [Google Scholar] [CrossRef] [Scilit]
- Markiz, N.; Jrade, A.; Professor, A. Integrating Fuzzy-Logic Decision Support With A Bridge Information Management System (Brims) At The Conceptual Stage Of Bridge Design. J. Inf. Technol. Constr. 2018, 23, 92–121. [Google Scholar]
- Sabatino, S.; Frangopol, D.M.; Dong, Y. Sustainability-Informed Maintenance Optimization of Highway Bridges Considering Multi-Attribute Utility and Risk Attitude. Eng. Struct. 2015, 102, 310–321. [Google Scholar] [CrossRef] [Scilit]
- Augeri, M.G.; Colombrita, R.; Greco, S.; Sapienza, P. Dominance-Based Rough Set Approach To Network Bridge Management. Balt. J. Road Bridge Eng. 2014, 9, 31–42. [Google Scholar] [CrossRef] [Scilit]
- Sahrapeyma, A.; Hosseini, A. Strategic Planning for the National Bridge Stock of Iran. Civil. Eng. Infrastruct. J. 2013, 46, 51–68. [Google Scholar] [CrossRef]
- Wakchaure, S.S.; Jha, K.N. Prioritization of Bridges for Maintenance Planning Using Data Envelopment Analysis. Constr. Manag. Econ. 2011, 29, 957–968. [Google Scholar] [CrossRef] [Scilit]
- Sasmal, S.; Ramanjaneyulu, K. Condition Evaluation of Existing Reinforced Concrete Bridges Using Fuzzy Based Analytic Hierarchy Approach. Expert. Syst. Appl. 2008, 35, 1430–1443. [Google Scholar] [CrossRef] [Scilit]
- Saaty, T.L. Making and Validating Complex Decisions with the AHP/ANP. J. Syst. Sci. Syst. Eng. 2005, 14, 1–36. [Google Scholar] [CrossRef] [Scilit]
- Diakoulaki, D.; Mavrotas, G.; Papayannakis, L. Determining Objective Weights in Multiple Criteria Problems: The Critic Method. Comput. Ops Res. 1995, 22, 763–770. [Google Scholar] [CrossRef] [Scilit]
- Shannon, C.E. A Mathematical Theory of Communication. A Math. Theory Commun. 1948, 27, 623–656. [Google Scholar]
- Rezaei, J. Best-Worst Multi-Criteria Decision-Making Method. Omega 2015, 53, 49–57. [Google Scholar] [CrossRef] [Scilit]
- Hwang, C.L.; Yoon, K. Methods for Multiple Attribute Decision Making. In Multiple Attribute Decision Making: Methods and Applications a State-of-the-Art Survey; Springer: Berlin/Heidelberg, Germany, 1981. [Google Scholar]
- Zavadskas, E.; Kaklauskas, A. Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. In The Organization and Management of Construction; Routledge: Oxfordshire, UK, 1996. [Google Scholar]
- Deng, J. Control Problems of Grey Systems. Syst. Control Lett. 1982, 1, 288–294. [Google Scholar]
- Zavadskas, E.K.; Turskis, Z.; Antucheviciene, J.; Zakarevicius, A. Optimization of Weighted Aggregated Sum Product Assessment. Elektron. Ir Elektrotechnika 2012, 122, 3–6. [Google Scholar] [CrossRef] [Scilit]
- Bernard, R. The Outranking Approach and the Foundations of ELECTRE Methods. Theory Decis. 1991, 31, 49–73. [Google Scholar] [CrossRef] [Scilit]
- Brans, J.P.; Vincke, P. Note—A Preference Ranking Organisation Method: (The PROMETHEE Method for Multiple Criteria Decision-Making). Manag. Sci. 1985, 31, 647–656. [Google Scholar] [CrossRef] [Scilit]
- Ghorabaee, M.K.; Zavadskas, E.K.; Olfat, L.; Turskis, Z. Multi-Criteria Inventory Classification Using a New Method of Evaluation Based on Distance from Average Solution (EDAS). Informatica 2015, 26, 435–451. [Google Scholar] [CrossRef] [Scilit]
- Keeney, R.L.; Raiffa, H. Decisions with Multiple Objectives: Preferences and Value Trade-Offs. IEEE Trans. Syst. Man. Cybern. 1979, 9, 403. [Google Scholar] [CrossRef]
- Opricovic, S.; Tzeng, G.H. Multicriteria Planning of Post-Earthquake Sustainable Reconstruction. Comput. Aided Civil. Infrastruct. Eng. 2002, 17, 211–220. [Google Scholar] [CrossRef] [Scilit]
- Charnes, A.; Cooper, W.; Rhodes, E. Measuring the Efficiency of Decision Making Units. Eur. J. Oper. Res. 1978, 2, 429–444. [Google Scholar] [CrossRef] [Scilit]
- Greco, S.; Matarazzo, B.; Slowinski, R. Rough Approximation by Dominance Relations. Int. J. Intell. Syst. 2002, 17, 153–171. [Google Scholar] [CrossRef] [Scilit]
- Alsharqawi, M.; Zayed, T.; Abu Dabous, S. Integrated Condition Rating and Forecasting Method for Bridge Decks Using Visual Inspection and Ground Penetrating Radar. Autom. Constr. 2018, 89, 135–145. [Google Scholar] [CrossRef] [Scilit]
- Pipinato, A.; Rebelo, C.; Pedrosa, B.; Gervásio, H. Assessment Procedure and Rehabilitation Criteria for Riveted Road Bridges. Struct. Eng. Int. 2020, 30, 109–118. [Google Scholar] [CrossRef] [Scilit]
- Fortin, T.; Dey, P.; Boissonnade, N.; Fafard, M. Life Cycle Cost Assessment of an Existing All-Aluminum Bridge: Comparison of Two Deck Options. Eng. Proc. 2023, 43, 3038. [Google Scholar] [CrossRef] [Scilit]
- Yang, Y.; Wang, X.; Wu, Z. Life Cycle Cost Analysis of FRP Cables for Long-Span Cable Supported Bridges. Structures 2020, 25, 24–34. [Google Scholar] [CrossRef] [Scilit]
- Singh, D.; Tiong, R.L.K. Development of Life Cycle Costing Framework for Highway Bridges in Myanmar. Int. J. Proj. Manag. 2005, 23, 37–44. [Google Scholar] [CrossRef] [Scilit]
- Kumar, R.; Gardoni, P. Renewal Theory-Based Life-Cycle Analysis of Deteriorating Engineering Systems. Struct. Saf. 2014, 50, 94–102. [Google Scholar] [CrossRef] [Scilit]
- Binder, F. Life Cycle Costs of Selected Concrete Repair Methods Demonstrated on Chloride Contaminated Columns. In Proceedings of the 11th International Probabilistic Workshop, Brno, Czech Republic, 6–8 November 2013. [Google Scholar]
- Kong, J.S.; Asce, M.; Frangopol, D.M.; Asce, F. Evaluation of Expected Life-Cycle Maintenance Cost of Deteriorating Structures. J. Struct. Eng. 2003, 129, 682–691. [Google Scholar] [CrossRef] [Scilit]
- Zhou, Z.; Alcalá, J.; Kripka, M.; Yepes, V. Life Cycle Assessment of Bridges Using Bayesian Networks and Fuzzy Mathematics. Appl. Sci. 2021, 11, 4916. [Google Scholar] [CrossRef] [Scilit]
- Padgett, J.E.; Vishnu, N. Interaction of Life-Cycle Phases in a Probabilistic Life-Cycle Framework for Civil Infrastructure System Sustainability. Sustain. Resilient Infrastruct. 2020, 5, 289–310. [Google Scholar] [CrossRef] [Scilit]
- Penadés-Plà, V.; Martí, J.V.; García-Segura, T.; Yepes, V. Life-Cycle Assessment: A Comparison between Two Optimal Post-Tensioned Concrete Box-Girder Road Bridges. Sustainability 2017, 9, 1864. [Google Scholar] [CrossRef] [Scilit]
- Xia, B.; Xiao, J.; Ding, T.; Guan, X.; Chen, J. Life Cycle Assessment of Carbon Emissions for Bridge Renewal Decision and Its Application for Maogang Bridge in Shanghai. J. Clean. Prod. 2024, 448, 141724. [Google Scholar] [CrossRef] [Scilit]
- Zhang, X.F.; Qian, Z.D.; Gao, H. Life-Cycle Environmental Impact Assessment of Steel Bridge Deck Pavement. In Developments in International Bridge Engineering. Springer Tracts on Transportation and Traffic; Springer: Cham, Switzerland, 2021; Volume 17. [Google Scholar]
- Wang, Z.; Dong, Y.; Asce, A.M.; Jin, W. Life-Cycle Cost Analysis of Deteriorating Civil Infrastructures Incorporating Social Sustainability. J. Infrastruct. Syst. 2021, 27, 04018102. [Google Scholar] [CrossRef] [Scilit]
- Navarro, I.J.; Yepes, V.; Martí, J.V. Life Cycle Cost Assessment of Preventive Strategies Applied to Prestressed Concrete Bridges Exposed to Chlorides. Sustainability 2018, 10, 845. [Google Scholar] [CrossRef] [Scilit]
- Thoft-Christensen, P. Infrastructures and Life-Cycle Cost-Benefit Analysis. Struct. Infrastruct. Eng. 2012, 8, 507–516. [Google Scholar] [CrossRef] [Scilit]
- Thoft-Christensen, P. Life-Cycle Cost-Benefit (LCCB) Analysis of Bridges from a User and Social Point of View. Struct. Infrastruct. Eng. 2009, 5, 49–57. [Google Scholar] [CrossRef] [Scilit]
- Soliman, M.; Frangopol, D.M. Life-Cycle Cost Evaluation of Conventional and Corrosion-Resistant Steel for Bridges. J. Bridge Eng. 2015, 20, 06014005. [Google Scholar] [CrossRef] [Scilit]
- Malik, M.; Amor, B. Optimizing Bridge Rehabilitation: A Life Cycle Assessment and Cost Analysis of Conventional and UHPC Overlays. In Smart & Sustainable Infrastructure: Building a Greener Tomorrow; Springer: Cham, Switzerland, 2024. [Google Scholar]
- Sacconi, S.; Venanzi, I.; Ierimonti, L.; Torti, M.; Laflamme, S.; Ubertini, F. Fatigue Reliability Assessment and Life-Cycle Cost Analysis of Roadway Bridges Equipped with Weigh-in-Motion Systems. Struct. Infrastruct. Eng. 2023, 19, 1317–1333. [Google Scholar] [CrossRef] [Scilit]
- Torti, M.; Venanzi, I.; Laflamme, S.; Ubertini, F. Life-Cycle Management Cost Analysis of Transportation Bridges Equipped with Seismic Structural Health Monitoring Systems. Struct. Health Monit. 2022, 21, 100–117. [Google Scholar] [CrossRef] [Scilit]
- Kere, K.J.; Huang, Q. Life-Cycle Cost Comparison of Corrosion Management Strategies for Steel Bridges. J. Bridge Eng. 2019, 24, 04019007. [Google Scholar] [CrossRef] [Scilit]
- Nielsen, D.; Raman, D.; Chattopadhyay, G. Life Cycle Management for Railway Bridge Assets. Proc. Inst. Mech. Eng. F J. Rail Rapid Transit. 2013, 227, 570–581. [Google Scholar] [CrossRef] [Scilit]
- Stewart, M.G.; Estes, A.C.; Frangopol, D.M. Bridge Deck Replacement for Minimum Expected Cost Under Multiple Reliability Constraints. J. Struct. Eng. 2004, 130, 1414–1419. [Google Scholar] [CrossRef] [Scilit]
- Petcherdchoo, A. Probabilistic Model for Single and Multiple Action Costs in Maintaining Both Condition and Safety of Deteriorating Reinforced Concrete Bridges. Case Stud. Constr. Mater. 2023, 19, e02613. [Google Scholar] [CrossRef] [Scilit]
- Leiva-Maldonado, S.; Bowman, M.D.; Gomez, D. Life-Cycle Cost Profiles Selection for Different Superstructure Bridge Types. Structures 2023, 54, 1–13. [Google Scholar] [CrossRef] [Scilit]
- Escobedo, D.D.L.; Torres-Acosta, A. Bridge Preventive Maintenance Based on Life-Cycle Assessment. Rev. Técnica Fac. Ing Univ. Zulia 2010, 33, 3–10. [Google Scholar]
- Crisan, A.; Juravle, A.; Bancila, R. A BIM-Enabled Workflow for the Rehabilitation of Heritage Steel Bridges. Appl. Sci. 2025, 15, 677. [Google Scholar] [CrossRef] [Scilit]
- Gao, Y.; Xiong, G.; Hu, Z.; Chai, C.; Li, H. Bridge Digital Twin for Practical Bridge Operation and Maintenance by Integrating GIS and BIM. Buildings 2024, 14, 3731. [Google Scholar] [CrossRef] [Scilit]
- Franciosi, M.; Kasser, M.; Viviani, M. Digital Twins in Bridge Engineering for Streamlined Maintenance and Enhanced Sustainability. Autom. Constr. 2024, 168, 105834. [Google Scholar] [CrossRef] [Scilit]
- Heng, J.; Dong, Y.; Lai, L.; Zhou, Z.; Frangopol, D.M. Digital Twins-Boosted Intelligent Maintenance of Ageing Bridge Hangers Exposed to Coupled Corrosion–Fatigue Deterioration. Autom. Constr. 2024, 167, 105697. [Google Scholar] [CrossRef] [Scilit]
- Abdelkhalek, S.; Zayed, T.; Eltoukhy, A.E.E. Multifaceted Optimization for Bridge Inspection Process. J. Constr. Eng. Manag. 2025, 151, 04025034. [Google Scholar] [CrossRef] [Scilit]
- Mohamad, M.; Tran, D.Q. Risk-Based Prioritization Approach to Construction Inspections for Transportation Projects. J. Constr. Eng. Manag. 2021, 147, 04020150. [Google Scholar] [CrossRef] [Scilit]
- Kwon, K.; Park, K.T.; Jung, K.S.; Kim, S. Efficient Reliability-Based Inspection Planning for Deteriorating Bridges Using Extrapolation Approaches. Appl. Sci. 2022, 12, 744. [Google Scholar] [CrossRef] [Scilit]
- Vereecken, E.; Botte, W.; Lombaert, G.; Caspeele, R. Bayesian Decision Analysis for the Optimization of Inspection and Repair of Spatially Degrading Concrete Structures. Eng. Struct. 2020, 220, 111028. [Google Scholar] [CrossRef] [Scilit]
- Oyegbile, O.B.; Chorzepa, M.G. Co-Active Prioritization by Means of Contingency Tables for Analyzing Element-Level Bridge Inspection Results and Optimizing Returns. Infrastructures 2020, 5, 13. [Google Scholar] [CrossRef] [Scilit]
- Washer, G.; Connor, R.; Nasrollahi, M.; Provines, J. New Framework for Risk-Based Inspection of Highway Bridges. J. Bridge Eng. 2016, 21, 04015077. [Google Scholar] [CrossRef] [Scilit]
- Kim, S.; Frangopol, D.M. Inspection and Monitoring Planning for RC Structures Based on Minimization of Expected Damage Detection Delay. Probabilistic Eng. Mech. 2011, 26, 308–320. [Google Scholar] [CrossRef] [Scilit]
- Sun, T.; Vatn, J. A Phase-Type Maintenance Model Considering Condition-Based Inspections and Maintenance Delays. Reliab. Eng. Syst. Saf. 2024, 243, 109836. [Google Scholar] [CrossRef] [Scilit]
- Jiang, F.; Ding, Y.; Song, Y.; Geng, F.; Wang, Z. Digital Twin-Driven Framework for Fatigue Lifecycle Management of Steel Bridges. Struct. Infrastruct. Eng. 2023, 19, 1826–1846. [Google Scholar] [CrossRef] [Scilit]
- Cheng, M.; Frangopol, D.M. Optimal Load Rating-Based Inspection Planning of Corroded Steel Girders Using Markov Decision Process. Probabilistic Eng. Mech. 2021, 66, 103160. [Google Scholar] [CrossRef] [Scilit]
- Anne Mette Sommerfl Andrzej Nowak, B.S.; Thoft-Christensen, P. Probability-Based Bridge Inspection Strategy. J. Struct. Eng. 1993, 119, 3520–3536. [Google Scholar]
- Orcesi, A.D.; Frangopol, D.M. Use of Lifetime Functions in the Optimization of Nondestructive Inspection Strategies for Bridges. J. Struct. Eng. 2011, 137, 531–539. [Google Scholar] [CrossRef] [Scilit]
- Chung, H.-Y.; Manuel, L.; Frank, K.H. Optimal Inspection Scheduling of Steel Bridges Using Nondestructive Testing Techniques. J. Bridge Eng. 2006, 11, 305–319. [Google Scholar] [CrossRef] [Scilit]
- Soliman, M.; Frangopol, D.M.; Kim, S. Probabilistic Optimum Inspection Planning of Steel Bridges with Multiple Fatigue Sensitive Details. Eng. Struct. 2013, 49, 996–1006. [Google Scholar] [CrossRef] [Scilit]
- Crémona, C.; Lukic’, M.L. Probability-Based Assessment and Maintenance of Welded Joints Damaged by Fatigue. Nucl. Eng. Des. 1998, 182, 253–266. [Google Scholar] [CrossRef] [Scilit]
- Wu, Z.; Zeng, J.; Hu, Z.; Todd, M.D. Optimization of Unmanned Aerial Vehicle Inspection Strategy for Infrastructure Based on Model-Enabled Diagnostics and Prognostics. Mech. Syst. Signal Process 2023, 204, 110841. [Google Scholar] [CrossRef] [Scilit]
- Yang, D.Y.; Frangopol, D.M. Risk-Based Inspection Planning of Deteriorating Structures. Struct. Infrastruct. Eng. 2021, 18, 109–128. [Google Scholar] [CrossRef] [Scilit]
- Sheils, E.; O’Connor, A.; Schoefs, F.; Breysse, D. Investigation of the Effect of the Quality of Inspection Techniques on the Optimal Inspection Interval for Structures. Struct. Infrastruct. Eng. 2012, 8, 557–568. [Google Scholar] [CrossRef] [Scilit]
- Sein, S.; Matos, J.C.; Idnurm, J.; Kiisa, M.; Coelho, M. Rc Bridge Management Optimisation Considering Condition Assessment Uncertainties. Proc. Est. Acad. Sci. 2021, 70, 172–189. [Google Scholar] [CrossRef] [Scilit]
- Su, D.; Liu, Y.; Li, X.; Cao, Z. Study on Optimization of Inspection Mechanism of Concrete Beam Bridge. PLoS ONE 2021, 16, e0256028. [Google Scholar] [CrossRef] [Scilit]
- Huang, S.H.; Huang, Y.H.; Blazquez, C.A.; Paredes-Belmar, G. Application of the Ant Colony Optimization in the Resolution of the Bridge Inspection Routing Problem. Appl. Soft Comput. J. 2018, 65, 443–461. [Google Scholar] [CrossRef] [Scilit]
- Shi, X.; Zhao, B.; Yao, Y.; Wang, F. Prediction Methods for Routine Maintenance Costs of a Reinforced Concrete Beam Bridge Based on Panel Data. Adv. Civil. Eng. 2019, 2019, 5409802. [Google Scholar] [CrossRef] [Scilit]
- Gui, C.; Zhang, J.; Lei, J.; Hou, Y.; Zhang, Y.; Qian, Z. A Comprehensive Evaluation Algorithm for Project-Level Bridge Maintenance Decision-Making. J. Clean. Prod. 2021, 289, 125713. [Google Scholar] [CrossRef] [Scilit]
- Cheng, M.Y.; Chiu, Y.F.; Chiu, C.K.; Prayogo, D.; Wu, Y.W.; Hsu, Z.L.; Lin, C.H. Risk-Based Maintenance Strategy for Deteriorating Bridges Using a Hybrid Computational Intelligence Technique: A Case Study. Struct. Infrastruct. Eng. 2019, 15, 334–350. [Google Scholar] [CrossRef] [Scilit]
- Asghari, V.; Hsu, S.-C.; Wei, H.-H. Expediting Life Cycle Cost Analysis of Infrastructure Assets Under Multiple Uncertainties by Deep Neural Networks. J. Manag. Eng. 2021, 37, 04021059. [Google Scholar] [CrossRef] [Scilit]
- Allah Bukhsh, Z.; Stipanovic, I.; Saeed, A.; Doree, A.G. Maintenance Intervention Predictions Using Entity-Embedding Neural Networks. Autom. Constr. 2020, 116, 103202. [Google Scholar] [CrossRef] [Scilit]
- Chen, J.H.; Su, M.C.; Lin, S.K.; Lin, W.J.; Gheisari, M. Smart Bridge Maintenance Using Cluster Merging Algorithm Based on Self-Organizing Map Optimization. Autom. Constr. 2023, 152, 104913. [Google Scholar] [CrossRef] [Scilit]
- Zhu, J.; Liu, B. Performance Life Cost-Based Maintenance Strategy Optimization for Reinforced Concrete Girder Bridges. J. Bridge Eng. 2013, 18, 172–178. [Google Scholar] [CrossRef] [Scilit]
- Estes, A.C.; Frangopol, D.M. Minimum Expected Cost-Oriented Optimal Maintenance Planning for Deteriorating Structures: Application to Concrete Bridge Decks. Reliab. Eng. Syst. Saf. 2001, 73, 281–291. [Google Scholar] [CrossRef] [Scilit]
- Razaqpur, A.G.; Abd, A.O.; Halim, E.; Mohamed, H.A. Bridge Management by Dynamic Programming and Neural Networks. Can. J. Civil. Eng. 1996, 23, 1064–1069. [Google Scholar] [CrossRef] [Scilit]
- Moghaddam, K.S.; Usher, J.S. Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming. Comput. Ind. Eng. 2011, 60, 654–665. [Google Scholar] [CrossRef] [Scilit]
- Xu, G.; Guo, F. Sustainability-Oriented Maintenance Management of Highway Bridge Networks Based on Q-Learning. Sustain. Cities Soc. 2022, 81, 103855. [Google Scholar] [CrossRef] [Scilit]
- Wei, S.; Bao, Y.; Li, H. Optimal Policy for Structure Maintenance: A Deep Reinforcement Learning Framework. Struct. Saf. 2020, 83, 101906. [Google Scholar] [CrossRef] [Scilit]
- Lei, X.; Xia, Y.; Deng, L.; Sun, L. A Deep Reinforcement Learning Framework for Life-Cycle Maintenance Planning of Regional Deteriorating Bridges Using Inspection Data. Struct. Multidiscip. Optim. 2022, 65, 149. [Google Scholar] [CrossRef] [Scilit]
- Lai, L.; Dong, Y.; Andriotis, C.P.; Wang, A.; Lei, X. Synergetic-Informed Deep Reinforcement Learning for Sustainable Management of Transportation Networks with Large Action Spaces. Autom. Constr. 2024, 160, 105302. [Google Scholar] [CrossRef] [Scilit]
- Yang, D.Y. Adaptive Risk-Based Life-Cycle Management for Large-Scale Structures Using Deep Reinforcement Learning and Surrogate Modeling. J. Eng. Mech. 2022, 148, 04021126. [Google Scholar] [CrossRef] [Scilit]
- Zhang, J.; Li, X.; Yuan, Y.; Yang, D.; Xu, P.; Au, F.T.K. A Multi-Agent Ranking Proximal Policy Optimization Framework for Bridge Network Life-Cycle Maintenance Decision-Making. Struct. Multidiscip. Optim. 2024, 67, 194. [Google Scholar] [CrossRef] [Scilit]
- Zhou, Q.N.; Yuan, Y.; Yang, D.; Zhang, J. An Advanced Multi-Agent Reinforcement Learning Framework of Bridge Maintenance Policy Formulation. Sustainability 2022, 14, 50. [Google Scholar] [CrossRef] [Scilit]
- Asghari, V.; Biglari, A.J.; Hsu, S.-C. Multiagent Reinforcement Learning for Project-Level Intervention Planning under Multiple Uncertainties. J. Manag. Eng. 2023, 39, 04022075. [Google Scholar] [CrossRef] [Scilit]
- Alekseev, A.; Kozhemyakin, L.; Nikitin, V.; Bolshakova, J. Data Preprocessing and Neural Network Architecture Selection Algorithms in Cases of Limited Training Sets—On an Example of Diagnosing Alzheimer’s Disease. Algorithms 2023, 16, 219. [Google Scholar] [CrossRef] [Scilit]
- Ebrahim, K.M.P.; Fares, A.; Faris, N.; Zayed, T. Exploring Time Series Models for Landslide Prediction: A Literature Review. Geoenviron. Disasters 2024, 11, 25. [Google Scholar] [CrossRef] [Scilit]
- Liu, Y.; Pang, B.; Wang, Y.; Shi, C.; Zhang, B.; Guo, X.; Zhou, S.; Wang, J. Life-Cycle Maintenance Strategy of Bridges Considering Reliability, Environment, Cost and Failure Probability CO2 Emission Reduction: A Bridge Study with Climate Scenarios. J. Clean. Prod. 2022, 379, 134740. [Google Scholar] [CrossRef] [Scilit]
- Lei, X.; Dong, Y.; Frangopol, D.M. Sustainable Life-Cycle Maintenance Policymaking for Network-Level Deteriorating Bridges with a Convolutional Autoencoder–Structured Reinforcement Learning Agent. J. Bridge Eng. 2023, 28, 04023063. [Google Scholar] [CrossRef] [Scilit]
- Abedinpourshotorban, H.; Hasan, S.; Shamsuddin, S.M.; As’Sahra, N.F. A Differential-Based Harmony Search Algorithm for the Optimization of Continuous Problems. Expert. Syst. Appl. 2016, 62, 317–332. [Google Scholar] [CrossRef] [Scilit]
- Chatterjee, A.; Kim, E.; Reza, H. Adaptive Dynamic Probabilistic Elitist Ant Colony Optimization in Traveling Salesman Problem. SN Comput. Sci. 2020, 1, 95. [Google Scholar] [CrossRef] [Scilit]
- Ribeiro, C.C.; Aloise, D.; Noronha, T.F.; Rocha, C.; Urrutia, S. A Hybrid Heuristic for a Multi-Objective Real-Life Car Sequencing Problem with Painting and Assembly Line Constraints. Eur. J. Oper. Res. 2008, 191, 981–992. [Google Scholar] [CrossRef] [Scilit]
- Dhal, K.G.; Das, A.; Sasmal, B.; Ghosh, T.K.; Sarkar, K. Eagle Strategy in Nature-Inspired Optimization: Theory, Analysis, Applications, and Comparative Study. Arch. Comput. Methods Eng. 2024, 31, 1213–1232. [Google Scholar] [CrossRef] [Scilit]
- Thakur, K.; Kumar, G. Nature Inspired Techniques and Applications in Intrusion Detection Systems: Recent Progress and Updated Perspective. Arch. Comput. Methods Eng. 2021, 28, 2897–2919. [Google Scholar] [CrossRef] [Scilit]
- John, H. Holland Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence; MIT Press: Cambridge, MA, USA, 1992. [Google Scholar]
- Deb, K.; Pratap, A.; Agarwal, S.; Meyarivan, T. A Fast and Elitist Multiobjective Genetic Algorithm: NSGA-II. IEEE Trans. Evol. Comput. 2002, 6, 182–197. [Google Scholar] [CrossRef] [Scilit]
- Storn, R.M.; Price, K. Differential Evolution: A Simple and Efficient Adaptive Scheme for Global Optimization Over Continuous Spaces. J. Glob. Optim. 1997, 11, 341–359. [Google Scholar] [CrossRef] [Scilit]
- Yilmaz, S.; Sen, S. Electric Fish Optimization: A New Heuristic Algorithm Inspired by Electrolocation. Neural Comput. Appl. 2020, 32, 11543–11578. [Google Scholar] [CrossRef] [Scilit]
- Mehrabian, A.R.; Lucas, C. A Novel Numerical Optimization Algorithm Inspired from Weed Colonization. Ecol. Inform. 2006, 1, 355–366. [Google Scholar] [CrossRef] [Scilit]
- Mirjalili, S.; Lewis, A. The Whale Optimization Algorithm. Adv. Eng. Softw. 2016, 95, 51–67. [Google Scholar] [CrossRef] [Scilit]
- Kennedy, J.; Eberhart, R. Particle Swarm Optimization. In Proceedings of the ICNN’95—International Conference on Neural Networks, Perth, Australia, 27 November–1 December 1995; pp. 1942–1948. [Google Scholar] [CrossRef] [Scilit]
- Eusuff, M.; Lansey, K.; Pasha, F. Shuffled Frog-Leaping Algorithm: A Memetic Meta-Heuristic for Discrete Optimization. Eng. Optim. 2006, 38, 129–154. [Google Scholar] [CrossRef] [Scilit]
- Woo Geem, Z.; Hoon Kim, J.; Loganathan, G.V. A New Heuristic Optimization Algorithm: Harmony Search. Simulation 2001, 76, 201. [Google Scholar] [CrossRef] [Scilit]
- Kirkpatrick, S.; Gelatt, C.D.; Vecchi, M.P. Optimization by Simulated Annealing. Science 1983, 220, 671–680. [Google Scholar] [CrossRef] [Scilit]
- de Oliveira, M.C.; Delgado, M.R.; Britto, A. A Hybrid Greedy Indicator- and Pareto-Based Many-Objective Evolutionary Algorithm. Appl. Intell. 2021, 51, 4330–4352. [Google Scholar] [CrossRef] [Scilit]
- Herzel, A.; Ruzika, S.; Thielen, C. Approximation Methods for Multiobjective Optimization Problems: A Survey. Inf. J. Comput. 2021, 33, 1284–1299. [Google Scholar] [CrossRef] [Scilit]
- Elbehairy, H.; Elbeltagi, E.; Hegazy, T.; Soudki, K. Comparison of Two Evolutionary Algorithms for Optimization of Bridge Deck Repairs. Comput. Aided Civil. Infrastruct. Eng. 2006, 21, 561–572. [Google Scholar] [CrossRef] [Scilit]
- Xu, Z.; Huang, M. Improving Bridge Expansion and Contraction Installation Replacement Decision System Using Hybrid Chaotic Whale Optimization Algorithm. Appl. Sci. 2021, 11, 6222. [Google Scholar] [CrossRef] [Scilit]
- Li, L.; Mahmoodian, M.; Khaloo, A.; Sun, Z. Risk-Cost Optimized Maintenance Strategy for Steel Bridge Subjected to Deterioration. Sustainability 2022, 14, 436. [Google Scholar] [CrossRef] [Scilit]
- Liu, M.; Frangopol, D.M. Bridge Annual Maintenance Prioritization under Uncertainty by Multiobjective Combinatorial Optimization. Comput. Aided Civil. Infrastruct. Eng. 2005, 20, 343–353. [Google Scholar] [CrossRef] [Scilit]
- Park, K.H.; Lee, S.Y.; Park, C.; Cho, H.N.; Kong, J.S. Safety-Based Multi-Objective Life-Cycle Management System for Steel Box Girder Bridges. Struct. Infrastruct. Eng. 2012, 8, 211–225. [Google Scholar] [CrossRef] [Scilit]
- Jaafaru, H.; Agbelie, B. Bridge Maintenance Planning Framework Using Machine Learning, Multi-Attribute Utility Theory and Evolutionary Optimization Models. Autom. Constr. 2022, 141, 104460. [Google Scholar] [CrossRef] [Scilit]
- Shen, Z.; Liu, Y.; Liu, J.; Liu, Z.; Han, S.; Lan, S. A Decision-Making Method for Bridge Network Maintenance Based on Disease Transmission and NSGA-II. Sustainability 2023, 15, 5007. [Google Scholar] [CrossRef] [Scilit]
- Yang, I.-T.; Hsieh, Y.-M.; Kung, L.-O. Parallel Computing Platform for Multiobjective Simulation Optimization of Bridge Maintenance Planning. J. Constr. Eng. Manag. 2012, 138, 215–226. [Google Scholar] [CrossRef] [Scilit]
- Yang, D.Y.; Frangopol, D.M.; Teng, J.G. Probabilistic Life-Cycle Optimization of Durability-Enhancing Maintenance Actions: Application to FRP Strengthening Planning. Eng. Struct. 2019, 188, 340–349. [Google Scholar] [CrossRef] [Scilit]
- Wei, J.; Chen, G.; Huang, J.; Shou, W.; Wang, J. Resource-Constrained Bridge Maintenance Optimization by Harmonizing Structural Safety and Maintenance Duration. Eng. Struct. 2024, 308, 118024. [Google Scholar] [CrossRef] [Scilit]
- Naji, K.; Santini-Bell, E.; Kwiatkowski, K. Element-Based Multi-Objective Optimization Methodology Supporting a Transportation Asset Management Framework for Bridge Planning and Programming. Transp. Res. Rec. 2022, 2676, 222–241. [Google Scholar] [CrossRef] [Scilit]
- Liu, X.; Liu, Y.; Sun, Z.; Wang, B.; Zhao, Y. Dynamic Optimization of Maintenance Strategy for Bridges in Regional Transportation Network through Semi-Markov Processes. Autom. Constr. 2025, 174, 106175. [Google Scholar] [CrossRef] [Scilit]
- Shojaei, F.; Naserabadi, H.D.; Taheri Amiri, M.J. Developing a Fuzzy Bi-Objective Programming and MCDM Model for Bridge Maintenance Strategy Optimization. Sci. Rep. 2024, 14, 13336. [Google Scholar] [CrossRef] [Scilit]
- Katikala, S.; Banerjee, S.; Arora, R.K. Optimized Preventive Maintenance Strategies for Corroded Bridge Columns in Earthquake-Prone Regions. Pract. Period. Struct. Des. Constr. 2022, 27, 04022030. [Google Scholar] [CrossRef] [Scilit]
- Bocchini, P.; Frangopol, D.M. Connectivity-Based Optimal Scheduling for Maintenance of Bridge Networks. J. Eng. Mech. 2013, 139, 760–769. [Google Scholar] [CrossRef] [Scilit]
- Nili, M.H.; Taghaddos, H.; Zahraie, B. Integrating Discrete Event Simulation and Genetic Algorithm Optimization for Bridge Maintenance Planning. Autom. Constr. 2021, 122, 103513. [Google Scholar] [CrossRef] [Scilit]
- Ishibashi, K.; Furuta, H.; Nakatsu, K. Bridge Maintenance Scheduling in Consideration of Resilience Against Natural Disasters. Front. Built Environ. 2020, 6, 4467. [Google Scholar] [CrossRef] [Scilit]
- Abdelkader, E.M.; Moselhi, O.; Marzouk, M.; Zayed, T. Integrative Evolutionary-Based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Priorities. J. Constr. Eng. Manag. 2021, 147, 04021100. [Google Scholar] [CrossRef] [Scilit]
- Xie, H.B.; Wu, W.J.; Wang, Y.F. Life-Time Reliability Based Optimization of Bridge Maintenance Strategy Considering LCA and LCC. J. Clean. Prod. 2018, 176, 36–45. [Google Scholar] [CrossRef] [Scilit]
- Ghodoosi, F.; Abu-Samra, S.; Zeynalian, M.; Zayed, T. Maintenance Cost Optimization for Bridge Structures Using System Reliability Analysis and Genetic Algorithms. J. Constr. Eng. Manag. 2018, 144, 04017116. [Google Scholar] [CrossRef] [Scilit]
- Ghafoori, M.; Abdallah, M.; Ozbek, M.E. Machine Learning–Based Bridge Maintenance Optimization Model for Maximizing Performance within Available Annual Budgets. J. Bridge Eng. 2024, 29, 04024011. [Google Scholar] [CrossRef] [Scilit]
- Mao, X.; Jiang, X.; Yuan, C.; Zhou, J. Modeling the Optimal Maintenance Scheduling Strategy for Bridge Networks. Appl. Sci. 2020, 10, 498. [Google Scholar] [CrossRef] [Scilit]
- Kim, S.; Ge, B.; Frangopol, D.M. Probabilistic Optimum Bridge System Maintenance Management Considering Correlations of Deteriorating Components and Service Life Extensions. ASCE ASME J. Risk Uncertain. Eng. Syst. Civ. Eng. 2022, 8, 04022023. [Google Scholar] [CrossRef] [Scilit]
- Nicolai, R.P.; Frenk, J.B.G.; Dekker, R. Modelling and Optimizing Imperfect Maintenance of Coatings on Steel Structures. Struct. Saf. 2009, 31, 234–244. [Google Scholar] [CrossRef] [Scilit]
- Frangopol, D.M.; Liu, M. Bridge Network Maintenance Optimization Using Stochastic Dynamic Programming. J. Struct. Eng. 2007, 133, 1772–1782. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).










