Next Article in Journal
Advances in Tracking Control for Piezoelectric Actuators Using Fuzzy Logic and Hammerstein-Wiener Compensation
Next Article in Special Issue
A Hybrid Metaheuristic for the Unrelated Parallel Machine Scheduling Problem
Previous Article in Journal
Non-Spiking Laser Controlled by a Delayed Feedback
Previous Article in Special Issue
Two-Agent Preemptive Pareto-Scheduling to Minimize Late Work and Other Criteria
 
 

Order Article Reprints

Journal: Mathematics, 2020
Volume: 8
Number: 2070

Article: Two-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work
Authors: by Yuan Zhang, Zhichao Geng and Jinjiang Yuan
Link: https://www.mdpi.com/2227-7390/8/11/2070

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop