Liu, Y.; Hao, J.; Li, C.; Li, Y.; Zhou, C.; Zheng, H.; Xu, S.; Chen, W.; Li, X.
How Can Construction and Demolition Waste Recycling Public–Private Partnership Projects Performance Compensate during the Operation Period? A Two-Stage Perspective of Recycling and Remanufacturing. Systems 2023, 11, 170.
https://doi.org/10.3390/systems11040170
AMA Style
Liu Y, Hao J, Li C, Li Y, Zhou C, Zheng H, Xu S, Chen W, Li X.
How Can Construction and Demolition Waste Recycling Public–Private Partnership Projects Performance Compensate during the Operation Period? A Two-Stage Perspective of Recycling and Remanufacturing. Systems. 2023; 11(4):170.
https://doi.org/10.3390/systems11040170
Chicago/Turabian Style
Liu, Yuxin, Jiekuo Hao, Chunhui Li, Yuejia Li, Chuyue Zhou, Haoxuan Zheng, Shiqi Xu, Weihong Chen, and Xingwei Li.
2023. "How Can Construction and Demolition Waste Recycling Public–Private Partnership Projects Performance Compensate during the Operation Period? A Two-Stage Perspective of Recycling and Remanufacturing" Systems 11, no. 4: 170.
https://doi.org/10.3390/systems11040170
APA Style
Liu, Y., Hao, J., Li, C., Li, Y., Zhou, C., Zheng, H., Xu, S., Chen, W., & Li, X.
(2023). How Can Construction and Demolition Waste Recycling Public–Private Partnership Projects Performance Compensate during the Operation Period? A Two-Stage Perspective of Recycling and Remanufacturing. Systems, 11(4), 170.
https://doi.org/10.3390/systems11040170