de Araújo Nobre, M.; Lopes, A.; Ferro, A.; Moura Guedes, C.; Almeida, R.; Nunes, M.; Gouveia, M.; Santos, D.; Vitor, I.
Immediate Full-Arch Maxillary Rehabilitation Supported by Four Implants: A Retrospective Study with 15 to 20 Years of Follow-Up. J. Clin. Med. 2026, 15, 446.
https://doi.org/10.3390/jcm15020446
AMA Style
de Araújo Nobre M, Lopes A, Ferro A, Moura Guedes C, Almeida R, Nunes M, Gouveia M, Santos D, Vitor I.
Immediate Full-Arch Maxillary Rehabilitation Supported by Four Implants: A Retrospective Study with 15 to 20 Years of Follow-Up. Journal of Clinical Medicine. 2026; 15(2):446.
https://doi.org/10.3390/jcm15020446
Chicago/Turabian Style
de Araújo Nobre, Miguel, Armando Lopes, Ana Ferro, Carlos Moura Guedes, Ricardo Almeida, Mariana Nunes, Miguel Gouveia, Diogo Santos, and Inês Vitor.
2026. "Immediate Full-Arch Maxillary Rehabilitation Supported by Four Implants: A Retrospective Study with 15 to 20 Years of Follow-Up" Journal of Clinical Medicine 15, no. 2: 446.
https://doi.org/10.3390/jcm15020446
APA Style
de Araújo Nobre, M., Lopes, A., Ferro, A., Moura Guedes, C., Almeida, R., Nunes, M., Gouveia, M., Santos, D., & Vitor, I.
(2026). Immediate Full-Arch Maxillary Rehabilitation Supported by Four Implants: A Retrospective Study with 15 to 20 Years of Follow-Up. Journal of Clinical Medicine, 15(2), 446.
https://doi.org/10.3390/jcm15020446