Article

Factors Associated with 5D BIM Implementation: Perceived Importance and Relationships with Project Cost Performance

1
College of Water Resources and Coastal Engineering, Beibu Gulf University, Qinzhou 535000, China
2
School of Natural Resources and Surveying, Nanning Normal University, Nanning 530001, China
3
School of Housing, Building and Planning, Universiti Sains Malaysia, Pulau Pinang 11800, Malaysia
4
Faculty of Civil Engineering Technology, Universiti Malaysia Pahang Al-Sultan Abdullah, Kuantan 26300, Malaysia
5
Faculty of Graduate Studies, Daffodil International University, Dhaka 1341, Bangladesh
*
Authors to whom correspondence should be addressed.
Buildings 2026, 16(18), 3698; https://doi.org/10.3390/buildings16183698
Submission received: 5 August 2026 / Revised: 7 September 2026 / Accepted: 12 September 2026 / Published: 16 September 2026
(This article belongs to the Section Construction Management, and Computers & Digitization)

Abstract

Although 5D Building Information Modeling (5D BIM) offers potential for cost control, its implementation remains constrained by multiple barriers. This study examines the relative perceived importance of six factors associated with 5D BIM implementation and their direct associations with project cost performance among higher-tier general contractors in Guangdong Province, China. Survey data from 234 contractor organizations, each represented by a knowledgeable key informant, were analyzed using SPSS, PLS-SEM, and IPMA to rank the factors, estimate their direct associations, and identify managerial priorities. Environmental factors received the highest perceived-importance ranking. The structural model shows significant positive direct associations between project cost performance and four factors: technological, organizational, environmental, and government policy; government policy has the largest standardized path coefficient among the six predictors tested. Operational and project-related factors show no statistically significant direct associations. IPMA places organizational and environmental factors in the high-importance, high-performance area, whereas government policy has high importance but below-average performance. This first empirical test of the previously developed extended TOE framework distinguishes perceived implementation importance from direct cost–performance relevance and clarifies its theoretical boundary. These context-specific findings inform contractor management and policy implementation and support future validation across regions, contractor types, and stakeholder groups.
Keywords: 5D BIM implementation; project cost performance; general contractors; PLS-SEM 5D BIM implementation; project cost performance; general contractors; PLS-SEM

Share and Cite

MDPI and ACS Style

Sun, H.; Li, J.; Esa, M.; Rahman, R.; Terh Jing, K. Factors Associated with 5D BIM Implementation: Perceived Importance and Relationships with Project Cost Performance. Buildings 2026, 16, 3698. https://doi.org/10.3390/buildings16183698

AMA Style

Sun H, Li J, Esa M, Rahman R, Terh Jing K. Factors Associated with 5D BIM Implementation: Perceived Importance and Relationships with Project Cost Performance. Buildings. 2026; 16(18):3698. https://doi.org/10.3390/buildings16183698

Chicago/Turabian Style

Sun, Hui, Jiguang Li, Muneera Esa, Rahimi Rahman, and Khoo Terh Jing. 2026. "Factors Associated with 5D BIM Implementation: Perceived Importance and Relationships with Project Cost Performance" Buildings 16, no. 18: 3698. https://doi.org/10.3390/buildings16183698

APA Style

Sun, H., Li, J., Esa, M., Rahman, R., & Terh Jing, K. (2026). Factors Associated with 5D BIM Implementation: Perceived Importance and Relationships with Project Cost Performance. Buildings, 16(18), 3698. https://doi.org/10.3390/buildings16183698

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop