Hou, R.; Li, H.; Zhang, H.; Wang, H.; Chen, L.; Xian, Q.
Integrated Construction Process Monitoring and Stability Assessment of a Geometrically Complex Large-Span Spatial Tubular Truss System. Buildings 2025, 15, 4000.
https://doi.org/10.3390/buildings15214000
AMA Style
Hou R, Li H, Zhang H, Wang H, Chen L, Xian Q.
Integrated Construction Process Monitoring and Stability Assessment of a Geometrically Complex Large-Span Spatial Tubular Truss System. Buildings. 2025; 15(21):4000.
https://doi.org/10.3390/buildings15214000
Chicago/Turabian Style
Hou, Ruiheng, Henghui Li, Hao Zhang, Haoliang Wang, Lei Chen, and Qingjun Xian.
2025. "Integrated Construction Process Monitoring and Stability Assessment of a Geometrically Complex Large-Span Spatial Tubular Truss System" Buildings 15, no. 21: 4000.
https://doi.org/10.3390/buildings15214000
APA Style
Hou, R., Li, H., Zhang, H., Wang, H., Chen, L., & Xian, Q.
(2025). Integrated Construction Process Monitoring and Stability Assessment of a Geometrically Complex Large-Span Spatial Tubular Truss System. Buildings, 15(21), 4000.
https://doi.org/10.3390/buildings15214000