Next Article in Journal
Research on Real-Time Control Strategy of Air-Conditioning Water System Based on Model Predictive Control
Next Article in Special Issue
A Case-Study-Based Comparative Analysis of Using Prefabricated Structures in Industrial Buildings
Previous Article in Journal
Barriers to Building Information Modeling (BIM) Implementation in Late-Adopting EU Countries: The Case of Portugal
Previous Article in Special Issue
Architectural Study and Preliminary Seismic Assessment of a Typical Unreinforced Brick Masonry Building in Zagreb, Croatia
 
 

Order Article Reprints

Journal: Buildings, 2025
Volume: 15
Number: 1653

Article: Budget and Schedule-Related Critical Success Factors for Design-Build Water and Wastewater Projects: Principal Component Analysis
Authors: by Pramen P. Shrestha, Shrijan Shrestha and Pooja Basnet
Link: https://www.mdpi.com/2075-5309/15/10/1653

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop