Next Article in Journal
Analysis of the Spatiotemporal Heterogeneity of Housing Prices’ Association in China: An Urban Agglomeration Perspective
Next Article in Special Issue
A Semantic-Based Methodology to Deliver Model Views of Forward Design for Prefabricated Buildings
Previous Article in Journal
Sustainable Building Design Development Knowledge Map: A Visual Analysis Using CiteSpace
Previous Article in Special Issue
Safety Risk Management of Prefabricated Building Construction Based on Ontology Technology in the BIM Environment
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception

by
Alberto Sanchez-Lite
1,*,
Patricia Zulueta
1,
Alcínia Zita Sampaio
2 and
Cristina Gonzalez-Gaya
3
1
Department of Materials Science and Metallurgical Engineering, Graphic Expression in Engineering, Cartographic Engineering, Geodesy and Photogrammetry, Mechanical Engineering and Manufacturing Engineering, School of Industrial Engineering, Universidad de Valladolid, Paseo del Cauce 59, 47011 Valladolid, Spain
2
Department of Civil Engineering and Architecture, Higher Technical School, University of Lisbon, 1049-001 Lisbon, Portugal
3
Department of Construction and Manufacturing Engineering, National University of Distance Education, 28040 Madrid, Spain
*
Author to whom correspondence should be addressed.
Buildings 2022, 12(7), 971; https://doi.org/10.3390/buildings12070971
Submission received: 15 May 2022 / Revised: 28 June 2022 / Accepted: 6 July 2022 / Published: 8 July 2022

Abstract

:
This paper develops an assessment of an academic implementation of building information modeling (BIM) carried out in an expert project subject of a School of Industrial Engineering. The objectives were for the students discover sustainable industrial during the design process and the students understand and participate in a real process of the implementation of industrial projects through real collaboration between academic and business contexts. The outcomes of this academic initiative were evaluated using academic results as well as students’ perceptions. Academic results were analyzed using the FUZZY VIKOR method. An analysis of variance (ANOVA) was performed to determine whether the use of BIM, the proposed university-enterprise environment and the sustainability proposal rate of the students’ projects had statistically significant effects on the results. Students´ perception evaluation was based on a Likert survey with five levels, and the results were interpreted using fuzzy k-means clustering and classification tree analysis. The results show that 77.8% of students consider that for learning, it is more effective to carry out a project related to an existing company, with the realization of the project with BIM methodology being of great value. The sustainability aspects were applied more easily thanks to the proposed methodology, and they were positively valued by the company.

1. Introduction

The architecture, engineering, and construction (AEC) sector is immersed in a paradigm shift that involves the incorporation of more sustainable models, those of the circular economy and, along this line, the BIM methodology is framed as a powerful tool for the creation of ecological digital models. The AEC sector currently faces numerous challenges, including low productivity, lack of research and development, and insufficient technological advances and its academical implementation [1]. From the point of view of environmental sustainability and once the serious problems caused by the current linear economy have been recognized, designers and researchers from around the world began to analyze more sustainable models of the circular economy. The construction industry is no exception to this change, and BIM, even with its limitations, is recognized as a powerful tool for designing buildings based on the circular economy [2]. The fusion of the principles of this paradigm, the BIM methodology, and lean construction can facilitate the construction of sustainable buildings. Lean construction and BIM are quite different initiatives, but both have profound impacts on the construction industry. A rigorous analysis of the innumerable specific interactions between them indicates that there is a synergy that, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree of improvement achieved in the cases of independently applying any of these concepts [3].
Industrial projects need strategies to allow energy efficiency and the reduction of waste and emissions [4]. There are studies that corroborate the enormous advantages of BIM methodology in relation to sustainability [5] and sustainability certification strategies [6,7]. In the study carried out by Huang and other authors [8], a questionnaire was designed that consisted of 27 questions distributed among 300 respondents, including planners, managers of construction companies, and employees of green building certification companies, all of them relevant people in terms of BIM and sustainable buildings. According to the results of the study, BIM has made important contributions to the design, construction, and other aspects of the ecology of buildings.
On the other hand, among the most notable technological advances applied to the construction industry, studies have been carried out with the general objective of analyzing the current state of the applications of digital technologies to this sector. Along these lines, in the work carried out by Opoku and other authors [9], the concept of the “digital twin” and its application in construction is exhaustively reviewed and analyzed using a systematic review methodology and incorporating the scientific mapping method. The research analyzes in detail the state and evolution of the concept, the key technologies, and six areas of application in the phases of the life cycle of a project: construction information modeling, structural system integrity, facilities management, monitoring, logistics processes, and energy simulation. The results show that there is a high potential for digital technology to offer solutions to the numerous challenges in the construction industry. These evolved models were originally designed to improve manufacturing processes through simulations with high precision models of individual components. In the case of cities, using increasingly large and accurate BIM models combined with data generated from the Internet of Things (IoT) sensors, it is possible to create, for example, digital twin smart cities. A 3D model of a city can be published online, and the public can visit it to see the proposed changes in urban planning and policy [10].
From digital BIM models, it is possible to know aspects of the operation of the projects during their useful life and to analyze different options that minimize their environmental impacts. These models allow simulations of electrical energy consumption, the carbon footprint of materials, and the total energy incorporated in the project, with the objective of generating alternative designs and analyzing the results considering the economic viability of the proposed scenarios [11,12,13]. BIM is being developed in the world of construction as a solution to sustainability problems, playing several roles in sustainable design. Its most significant contributions have been in relation to the development of energy efficiency and natural lighting and ventilation, although there are barriers to its application such as insufficient knowledge of the tools due to lack of training and the high cost of BIM software [14], absence of the correct information at the right time to make critical decisions [8,15] or fields not fully developed [16,17]. In a study carried out by Lim and other authors [18], a systematic review of the recent development of BIM in terms of the sustainability performance of existing buildings was performed. As a result, a framework has been developed to fill the research gaps and future needs in the implementation of BIM for the environment, including data acquisition techniques, integrated processes, unified platforms, interoperability and data management, automation, design alteration, and automatic data feedback. This study provides new knowledge about the theoretical developments and the practical or technical aspects of BIM to promote a complete modernization ecosystem.
Therefore, BIM is part of the implementation of the Industrial Revolution 4.0, in which virtual reality and digital twins are key elements. Currently, buildings are responsible for 40% of the energy consumption in Europe, and therefore, there is a growing interest, framed in the European Green Pact 2050, in reducing their energy consumption. In this context, adequate interoperability between BIM and building energy modeling (BEM) is essential to integrating the digital world in the construction sector and, therefore, to increasing competitiveness through cost savings [19]. New technology tools as BIM produce changes in the curriculum of AEC disciplines and in educational student perceptions [20,21,22,23]. The students’ perception of BIM implementation in a School of Industrial Engineering at different phases and levels shows the use of BIM as a methodology that eases collaborative work [21,23].
The present study shows an evaluation of a new stage of the implementation of BIM in engineering curriculum in a university-business collaborative learning environment. In this stage, during learning of the design process, the student develops an industrial building with ethical principles, social equity, and environmental awareness as a grounded sustainable fact, applying the principles of ecological quality and energy savings. An important objective of this innovative implementation is that the student understands and participates in a real process of executing sustainable industrial projects in a BIM environment through real collaboration between the academic and business contexts. To achieve this objective, a real company in the sector is included as an agent involved in the academic development of the project, maintaining, at all times, high educational conditions in terms of the acquisition of basic and specific skills and the achievement of learning outcomes. This new stage is a stimulus for industrial engineering students as a true link between university studies and professional practice through participation in a comprehensive, shared technical project in which the interested parties come together contributing knowledge so that they can reach the degree of maturity necessary for their integration into professional life [24]. Along this line, studies have been carried out on the importance of the research component in the training of university students from the connection with the university-company link. This alternative makes it possible to solve the existing problems in the orientation, planning, and development of the research activities of the students, which, as with the entire educational process, are complex, requiring conscious and strategic management and direction. An adequate organization of research, inserted through the collaboration between the two agents, would allow professionals to graduate with a comprehensive vision in their training and with a greater domain in their area of knowledge, which consolidates their commitment and interest in their training [25].
The study presented in this work tries to evaluate the influence of the proposed framework on the academic results, the achievement of skills related to teamwork, defense of results, reasoning and decision making, development of technical documentation, use of ICT and autonomous learning, as well as student’s perception. The following sections describe the methodology followed, the results obtained and the conclusions that can be drawn from our work.

2. Materials and Methods

In our technical projects subjects, the learning approach and the methodology established by the United Nations Educational, Scientific and Cultural Organization (UNESCO), focused on education on sustainable development (ESD), are taken into consideration. This method provides students with the knowledge, skills, attitudes, and values necessary to overcome global challenges, including climate change, environmental degradation, and loss of biodiversity. The Berlin Declaration on Education for Sustainable Development, adopted at the last UNESCO World Conference, establishes certain commitments to be fulfilled, among which we specifically highlight “harnessing the potential of new digital and green technologies to ensure that access, as well as the development and use of these, is responsible, safe, equitable and inclusive, based on critical thinking and the principles of sustainability, with an adequate evaluation of the risks and benefits and to promote open educational resources, open science, and virtual or distance learning facilities for ESD that are affordable” [26].
The company defined the scope of the practical work and the use of BIM as a requirement for the development of the project. The work to be developed using BIM methodology consisted of a research, development and innovation (R + D + I) center in the automotive sector located in an industrial estate. This development had four premises: Inclusive design, innovation, sustainability and aesthetic. Figure 1 shows these four premises and their impacts. The consideration of these premises in engineering projects in terms of both contribution to the creation of the industrial landscape and the experience of the production spaces are valued. It was mandatory to take into account the current regulations concerning minimum safety and health provisions in the workplace [27], fire safety regulations in industrial establishments [28] and the technical building code (its acronym in Spanish is ‘CTE’) [29]. The R + D + I center should include at least two engine vehicle benches test areas, a research and development area, an exhibition hall, an administrative and several auxiliary areas. This industrial project was carried out in the mandatory subject of Industrial Technical Projects. This subject has six ECTS (European Credit Transfer and Accumulation System) credits. A total of 35 students took the subject.
The enterprise provided some of the 3D digital models of the production resources and provided training for the development of the industrial process. The work teams used these models and all process data in the development of the workstations. An ergonomic and a study of these workstations were mandatory. The rapid upper limb assessment (RULA) method [30] and the NIOSH equation [31] were chosen as the main tools for ergonomic analysis. Material cycle, energy use and toxic emissions matrix (MET) [32] and life cycle analysis (LCA) under ISO 14040 guidelines [33] were used to study the environmental impact of the proposals. It was a collaborative work through a cloud platform with the organization of a technical office through a central file of the digital model and subprojects, following the active collaborative learning methodology proposed by Blanco et al. [34]. Table 1 shows all software tools and their objectives used in the practical sessions.
The scientific and technological knowledge that is produced in universities and companies is necessary to be competitive in any economy today. In this complementary process, collaboration between the two is increasingly common. However, this process, which is not without its problems, requires the correct definition of the mechanisms for interaction [35]. Along with the fundamentals of knowledge that have been traditionally taught in engineering schools, there should be the opportunity to practice and acquire a set of skills: creativity, teamwork, problem solving, leadership, and the ability to generate innovative ideas that future employers will demand. To be able to train students with deep technical knowledge and professional skills, universities must carry out their own innovations and find appropriate approaches that serve their students. Previous studies have shown that the university-business collaborative approach is beneficial for both students and the industry. Specifically, the work carried out by Aizpún and other authors [36] presents a novel approach that shows such collaboration. In this experience, teams of students are allowed to work with real industrial projects and apply what they have learned in the classroom. In this line an academic-business team let a collaborative environment between students and professionals to develop student projects. A competition phase was carried out with the presentation of the results by each team. After the decision of the jury (faculty + professionals of the company) the three best projects were awarded.
The methodology applied for the development of the subject has four pashes. Phases, main stages, and actions are shown in Table 2.
The first two phases constitute the necessary steps for the realization of the technical project. Students were divided into eight work teams of four to five members in Phase 1 stage 1. A work plan suitable for a six ECTS course was established from the beginning of the course. This plan included 4 h per week distributed in two sessions of 2 h. The first session was focused on the presentation of subjects and the fundamentals necessary for the conceptualization and development of the project. During the two hours of the laboratory session (directed sessions) presentations and discussions of the work and partial deliveries are carried out on dates scheduled from the beginning following a process of continuous evaluation. The deliveries are summarized in Table 3.
Each group has a student who carried out coordination tasks. Each work team complete a document with all requirements of the project as a basic BIM Execution Plan (BEP). This document was developed with the support of the teacher and the collaboration of the professional of the enterprise following ISO 29481 [37] and BIM project execution planning guide, version 3.0 of the Pennsylvania State University [38]. This is one of the key points of the collaboration with the company. Specifications, data delivered, tools, and deadlines, are analyzed not only by the teachers, but also by the company’s staff.
In the second phase the proposed competition is developed and in the last phase the evaluation of the results is carried out. For this purpose, we have considered the academic results of the students obtained in the Project, as well as the students’ perception of the development of this experience.
Figure 2 shows the evaluation phases of the result of the proposal environment learning. The academic evaluation (Evaluation I) was developed in two steps (Figure 2). Three academic courses were evaluated (one year with BIM methodology under the proposed Enterprise-University environment, one year with BIM methodology without Enterprise-University environment, and one year without BIM methodology and without Enterprise-University environment). The samples of each course were relative to the results of students obtained in their technical projects. A total of 24 samples were considerate.
Following other studies [21,34], in this study, the academic assessment uses eight criteria. These criteria are relative to the overall learning level of the student (OLL) and the level of development of other skills by the student. The overall learning level criterion is evaluated using the level of the technical project proposal developed by each work team. The level of development of other skills is evaluated using seven criteria (S1 to S7) (Table 4).
The relative importance of each criterion was obtained using best-worst method (BWM) [39]. All criteria were evaluated by four teachers. The individual scores for each criterion were synthesized using the geometric mean. The consistency ratio threshold is 0.4108 [39]. The calculated consistency ratio (Ksi = 0.2239) is less than the threshold, so it is acceptable. The weight of each criterion and each sample’s evaluation under uncertainty conditions were described in a positive trapezoidal fuzzy number [40]. The 8 criteria under consideration and the value of the relative importance of each criterion under certainly (values form BWM) and uncertainty conditions are shown in Table 3. All criteria were categorized as a benefit to qualify the performance of each sample. In the first step of the academic evaluation (Evaluation I), the academic results were analyzed under uncertain conditions using the FUZZY VIKOR [41,42,43] method, and the results for each evaluated sample were classified. Each sample under uncertain conditions was evaluated (FUZZY VIKOR method) using a Likert scale with five levels. Table 5 shows the alternative rating scale under uncertainty conditions. In the second step, possible relationships between the use of the University—Enterprise environment, students’ sustainability proposal rate, use of BIM, and the results obtained for the 8 proposed criteria used for the teachers’ evaluation were studied. In this second step, an analysis of variance (ANOVA) was performed to determine whether the use of BIM (BIM), the proposed University-Enterprise environment (Enterprise) and the sustainability proposal rate of the students’ projects (Sustainability) had statistically significant effects on the results of the teachers’ evaluation criteria at the 95% level of confidence.
A 5-level liker scale survey was carried out to explore the opinion of the students (Evaluation II). The survey (Table 6) had ten questions with two control questions (questions 6 and 7). The results were analyzed through a fuzzy k-means clustering analysis and a classification tree (CHAID algorithm).

3. Results and Discussion

All of the work teams developed their own project in fulfillment of the specifications established in the previous section. The results obtained and the evaluation of this academic proposal are presented in this section.

3.1. Project Phases

Academic incorporation of BIM into the project workflow was proposed, and a basis BIM execution plan (BEP) was developed by each work team as the methodology section describes. This document was basic documentation, description, and display of the process development. The academic and professional responsible defined with all teams the project goal along with their potential relationship to the use of BIM. The objectives were the same in all of the groups. Table 7 shows these objectives, their priority (a lower value shows a higher priority), and their relationship to the uses of BIM. In terms of mode of BIM uses, BIM was used for 3D model construction, structural performance, lighting, and sustainability analysis, as well as model revisions and documentation development. All of these uses are identified with the planning and design phases.
The workflow has been organized from the beginning in the cloud, through the creation of a central file in a location shared by the members of each team and the creation of local sub-projects, allowing simultaneous and synchronized work, even from different locations, following a systematic process. Through this process, the digital data flow establishes connections between the tools and all agents (student work team, teachers, and external professionals) through all phases of design, obtaining the best results through collaboration. Table 8 presents models generated, software and types of files used.
The 3D models and documentation generated correspond to the deliverables defined in the methodology section. All teams following the schedule shown in Figure 3.
During the design phases, each team carried out a different project proposal. Figure 4 shows different academic proposals developed by student teams. The contributions in terms of sustainability were outstanding. In general, the projects considered the solar impact in the design phase, trying to take advantage of the solar gain. To show the results of this design, studies of the solar incidence were performed using the software Revit. This allowed the establishment of strategic dispositions of the building with consequent energy savings. Some of the most relevant solutions applied in the projects carried out in relation to sustainability strategies are presented in Table 9 and Figure 5.

3.2. Evaluation Phases

Once the experience carried out on the subject of Industrial Technical Projects was concluded, the following actions were carried out during the evaluation phase to analyze the impact on the results.

3.2.1. Faculty Opinion—Academic Evaluation of Projects

The academic evaluation of the results obtained for each course was performed for three different academic courses (an academic course with BIM and without company collaboration, an academic course with BIM and with company collaboration, and an academic course without BIM and without company collaboration). The data from each course (24 samples) were considered, and each variable described in Table 3 was qualified by means of a Likert scale from one to five. Table 10 shows a summary of the results obtained for each comparison variable.
Alluvial Diagram (Figure 6) shows a graphical representation of possible correlations between the use of BIM (BIM), university-enterprise collaborative learning environment (Enterprise), sustainability student proposal rate (Sustainability), and overall learning level (OLL) results representing them as flows. Each height rectangle is proportional to its number of samples (e.g., there are 16 samples with the use of BIM, of these samples, 8 samples are with the use of University-Enterprises environment, all of them with a high rate of sustainability proposal and of these samples, 5 samples with very high overall level and 3 samples with medium overall level). These possible correlations are represented with curved lines whose width is proportional to their values [44].
The academic results were rated using the FUZZY VIKOR method, considering the criteria and their relative importance shown in Table 2. The values obtained for the three academic courses are shown in Table 11. The samples are identified by four numbers: the first represents the use of BIM (1: Used of BIM, 0: Not used BIM), the second represents the use of the university-company environment (1: Used, 0: Not Used), the third represents the rate of sustainability proposal (1: High, 0: Low), and the fourth is related to the project of each work team developments in each academic course.
By using BIM, enterprise, and sustainability as independent variables and overall learning level (OLL) and skills S1 to S7 as dependent variables, eight analyses of variance (ANOVA) were performed. BIM has two groups: Use of BIM and Not use of BIM. Enterprise has two groups: Use of university-enterprise collaborative environment or not use of this environment. Sustainability has two groups: High rate of sustainability proposal or low rate. The ANOVA tests were performed to determine whether the use of BIM, use of University-Enterprise environment, and Rate of sustainability proposal had significant impacts on the values of the level of overall learning level (OLL) use of ICT tools (S1), degree of integration and maturity in teamwork (S2), level of autonomous learning (S3), degree of critical awareness and self-criticism (S4), Level of reasoning and decision-making (S5), level of drafting technical documentation (S6) and level of presentation and defense of the results (S7) The results of the ANOVA tests where independent variables have got significant effects, are shown in Table 12 ( p-values in bold correspond to significant effects).

3.2.2. Students’ Perception

The second action carried out in the evaluation phase consisted of a study of the opinions of the participating students through a survey of 10 questions, grouped into 4 fields. The assessment of the survey was performed using a Likert scale from 1 to 5, with 1 not agreeing and 5 totally agreeing (Table 13). Questions 6 and 7 were used as control questions. A contradictory answer between these 2 questions would invalidate the answers provided by the student. The survey was answered by 18 students (51.14%). Taking into account the control questions, none of the samples received were rejected. Table 4 shows the results obtained for each of the questions. A total of 83.33% of the students absolutely agree that it is more motivating to guide the projects of the subject toward a real problem raised in collaboration with a company and that learning is more effective in this way. The rest (16.67%) consider this strategy adequate. A total of 77.22% of the students positively value the implementation of the project with BIM methodology; of these, 33.33% completely agree with this assessment. A total of 77.8% of the students think that a contest increases involvement in the subject. In the opinion of the students, the training stay at the company and presenting and defending the project for evaluation before a jury (faculty + company representatives) does not improve the degree of visibility of the students before their next incorporation into the world. labor. A total of 98.99% of the students agree that the incidence of sustainability aspects in the project was high (50% of them totally agreed). A total of 83% of the students considered it interesting to have carried out an industrial project understood as industrial building + process development. More than 20% of the students agree that it would be interesting to carry out a project of an industrial product in the subject of Industrial Technical Projects.
Through a fuzzy k-means clustering analysis (coefficient of fuzziness 1.05) [46], the samples obtained were classified into two clusters. The index of dissimilarity used was the Jaccard index. The optimal cluster number was chosen with the elbow curve method using the evolution curve of the clustering criterion (Figure 5) [21,47]. With 2 clusters, the minimum value is the within-cluster sum of squares, and the maximum value is the between-class sum of squares. Cluster 1 contains 5 samples and corresponds to the samples in which the answers to questions Q3 to Q9 obtained a lower score and that to question Q10 a higher score. This group could be identified as having less interest in BIM, the type of projects that can be developed with BIM, and the approach of the competition within the subject, as well as a greater interest in guiding the subject in a product development project. Cluster 2 contains most of the samples, presenting samples with high interest in BIM and the projects that can be developed with BIM. The average silhouette [48] mean width was 0.72. The graph silhouette shows an acceptable grouping of the samples in their respective clusters (Figure 7).
Question Q6 (Evaluates the implementation of the project with the BIM methodology) was classified into 3 levels (Low, scores 1 and 2; Medium, score 3; High, scores 4–5). Taking this question as a dependent variable and the rest of the questions as explanatory variables, the classification tree shown in Figure 8 was developed using the chi-squared automatic interaction detector (CHAID) algorithm [49]. The significance level used was 5%. The tree shows 5 nodes selecting questions Q2, Q6, and Q10. From the analysis of the classification tree, it can be deduced that 77.8% of students consider that for learning, it is more effective to carry out a project related to an existing company (Q2), with the realization of the project with BIM methodology being of great value (Q6). Of these samples, 55.6% also show no interest in carrying out a project related to an industrial product (question Q10).

4. Discussion

The academic results of all teams were very satisfactory. A comparison with the results of previous courses showed improvement in the quality of the work and therefore in the academic results. The use of BIM, the use of the University-Enterprise environment and the sustainability proposal rate have statistically significant effects on the values of the level of overall learning level (OLL). The ranking course (VIKOR method) shows better results for samples with the University-Enterprise environment (top four positions). The top nine positions correspond to samples with the use of BIM. The first sample without the use of BIM was ranked 10th. The p-value for the analysis of the variance F-test (p < 0.005, 95% confidence level) suggests that the use of BIM (BIM) is significant in the results of the use of ICT tools (S1), degree of integration and maturity in teamwork (S2), level of autonomous learning (S3), degree of critical awareness and self-criticism (S4), and level of drafting technical documentation (S6). These results show that the BIM methodology provides an exceptional opportunity to carry out a collaborative team project, with coordination and leadership tasks being essential in the professional practice of an engineer. This result is in agreement with other academic BIM proposals [22,50,51,52,53]. The use of the University-Enterprise environment is only significant in the results of the degree of integration and maturity in teamwork (S2). There are no statistically significant differences in the results of the level of reasoning and decision-making (S5) and the level of presentation and defense of the results (S7). These results need further research.
High levels of motivation were observed in the students in the face of a specific goal linked to the academic purpose of the subject. The university-business collaborative learning environment proposed has motivating factors common to other studies [54,55,56,57,58,59,60]. As other studies denote [61,62], the inclusion of a real and competitive challenge, posed in collaboration with a business environment, was more effective than working on a fictitious case, and it is an important component of engineering education. The students found that presenting their projects to the rest of the teams, teachers, and professionals of the participating company was satisfying and that their personal relationships increased with your curricular activities. Koola and Subramanian report these results in their collaborative real competition challenge but with extracurricular activities [60].
Although uncertainty was incorporated through fuzzy logic in the grouping of the different samples obtained in the survey, the study was limited by the sample size, the use of the fuzzy clustering model itself, and the chi-squared automatic interaction detector (CHAID) algorithm used in the development of classification tree. Also, the results were limited by the VIKOR FUZZY method. This needs further investigation by comparing the results obtained with those obtained by other methods, as suggested by other studies [63,64].

5. Conclusions

From the results of this study, the following conclusions can be drawn:
  • The use of BIM and the use of the collaborative business academic learning environment implementation in the engineering project subject is significant in the overall learning level (OOL) assessment results, and they could be an excellent approach for developing the practice of the course (particularly the use of the collaborative business academic learning environment presented).
  • The skills assessment results have higher average values in courses in which BIM with or without the proposed collaborative business academic learning environment was used. The use of BIM is significant in the skills assessment results. Only regarding the level of presenting and defending results (S7) and the level of reasoning and decision-making (S5), there is no significant relationship to the use of BIM.
  • The use of the collaborative business academic learning environment is significant in the skills assessment results of the level of ICT tool use (S1) and degree of integration and maturity in teamwork (S2)
  • Student perception shows a positively influenced by the use of BIM and the collaborative business academic environment learning presented in this study. In addition, another important issue derived from the incorporation of the company into the development of the subject was that competitiveness and motivation could be an important role.
  • Considering the sustainability proposal rate, the sustainability aspects were applied more easily thanks to the proposed methodology. BIM methodology can be of great help in the development of industrial projects due to the interoperability existing between different programs to carry out not only the design of the project but also certain studies and analyses necessary for the achievement of a digital model based on sustainability criteria.
This work contributes to increasing the scope of the collaborative business-academic learning environment and, in particular, aims to support the learning on BIM projects. The collaborative business-academic environment is an interesting topic of research and a useful application in technical project learning. The approach developed in this work could be used in other subjects (e.g., final degree project, basic project subject) or professional courses in BIM, adapting the specifications to the specific requirements of these subjects or courses. The results need further studies (an in-depth study of the fuzzy model, a comparative study of the results using different Multiple-criteria decision-making (MCDM) Methodologies), and to continue with the collaborative university-business learning environment approach to validate the results presented in this work.

Author Contributions

Conceptualization, A.S.-L. and P.Z.; methodology, A.S.-L., P.Z., A.Z.S. and C.G.-G.; validation, A.S.-L. and P.Z.; formal analysis, A.S.-L., P.Z., A.Z.S. and C.G.-G.; investigation, A.S.-L., P.Z., A.Z.S. and C.G.-G.; data curation, A.S.-L., P.Z., A.Z.S. and C.G.-G.; writing—original draft preparation, A.S.-L., P.Z., A.Z.S. and C.G.-G.; writing—review and editing, A.S.-L., P.Z., A.Z.S. and C.G.-G. All authors have read and agreed to the published version of the manuscript.

Funding

This work has been carried out within the scope of the activities of the project entitled “Generation of an educational-business collaborative building information modeling (BIM) environment for technical industrial projects subjects: Show your project”). This project was funded by the Call for Annual Grants of the Center for Online Teaching, Training and Teaching Innovation of the University of Valladolid (VirtUVa).

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

All of the data used to support the findings of this study are included in this article.

Acknowledgments

The authors are grateful for the input received from industry professionals and all students who participated in this research.

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Blanco, M.; Zulueta, P.; Sánchez, A.; Alonso, I. Evolución del Proceso de implementación de BIM en la docencia de proyectos en una escuela de ingenierías industriales. In Nuevas Tendencias de Enseñanza y Aprendizaje Aplicadas a la Formación en Dirección de Proyectos; Pastor, E.A., Yagüe, J.L., Eds.; UCA, AEIPRO: Cadiz, Spain, 2017; pp. 246–277. [Google Scholar]
  2. Chang, Y.-T.; Hsieh, S.-H. A Preliminary Case Study on Circular Economy in Taiwan’s Construction. IOP Conf. Ser. Earth Environ. Sci. 2019, 225, 12069. [Google Scholar] [CrossRef] [Green Version]
  3. Sacks, R.; Koskela, L.; Dave, B.A.; Owen, R. Interaction of Lean and Building Information Modeling in Construction. J. Constr. Eng. Manag. 2010, 136, 968–980. [Google Scholar] [CrossRef] [Green Version]
  4. Krajníková, K.; Smetanková, J.; Behúnová, A. Building Sustainability and Building Information Modelling. Acta Tecnol. 2019, 5, 1–4. [Google Scholar] [CrossRef]
  5. Oduyemi, O.; Okoroh, M. Building performance modelling for sustainable building design. Int. J. Sustain. Built Environ. 2016, 5, 461–469. [Google Scholar] [CrossRef] [Green Version]
  6. Zanni, M.A.; Soetanto, R.; Ruikar, K. Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Arch. Eng. Des. Manag. 2016, 13, 101–129. [Google Scholar] [CrossRef] [Green Version]
  7. Kibert, C.J. Green Buildings: An overview of progress. J. Land Use Environ. Law 2004, 19, 491–502. [Google Scholar]
  8. Huang, B.; Lei, J.; Ren, F.; Chen, Y.; Zhao, Q.; Li, S.; Lin, Y. Contribution and obstacle analysis of applying BIM in promoting green buildings. J. Clean. Prod. 2020, 278, 123946. [Google Scholar] [CrossRef]
  9. Opoku, D.-G.J.; Perera, S.; Osei-Kyei, R.; Rashidi, M. Digital twin application in the construction industry: A literature review. J. Build. Eng. 2021, 40, 102726. [Google Scholar] [CrossRef]
  10. White, G.; Zink, A.; Codecá, L.; Clarke, S. A digital twin smart city for citizen feedback. Cities 2021, 110, 103064. [Google Scholar] [CrossRef]
  11. Jiménez, Y.; Sebastián, J.; Gómez, A.; Leal, G. Analysis of the environmental sustainability of buildings using BIM (Building Information Modeling) methodology. Ing. Y Compet. 2017, 19, 230–240. [Google Scholar]
  12. van der Berg, M.; Durmisevic, E. BIM uses for reversible building design: Identification, classification & elaboration. In Proceedings of the 3rd Green Design Conference, Mostar, Bosnia and Herzegovina, 4–7 October 2017. [Google Scholar]
  13. Pereira, V.; Santos, J.; Leite, F.; Escórcio, P. Using BIM to improve building energy efficiency—A scientometric and systematic review. Energy Build. 2021, 250, 111292. [Google Scholar] [CrossRef]
  14. Xu, C.; Hu, X.; Tivendale, L.; Reza Hosseini, M.; Liu, C. Building information modelling in sustainable design and construction. Int. J. Sustain. Real Estate Constr. Econ. 2018, 1, 164–181. [Google Scholar]
  15. Olawumi, T.O.; Chan, D.W.H. Beneficial Factors of Integrating Building Information Modelling (BIM) and Sustainability Practices in Construction Projects. In Proceedings of the Hong Kong International Conference on Engineering and Applied Science (HKICEAS), Hong Kong, 24–26 January 2018. [Google Scholar]
  16. Liu, Z.; Zhang, C.; Guo, Y.; Osmani, M.; Demian, P. A Building Information Modelling (BIM) based Water Efficiency (BWe) Framework for Sustainable Building Design and Construction Management. Electronics 2019, 8, 599. [Google Scholar] [CrossRef] [Green Version]
  17. Carvalho, J.P.; Bragança, L.; Mateus, R. Optimising building sustainability assessment using BIM. Autom. Constr. 2019, 102, 170–182. [Google Scholar] [CrossRef]
  18. Lim, Y.-W.; Chong, H.-Y.; Ling, P.C.; Tan, C.S. Greening existing buildings through Building Information Modelling: A review of the recent development. Build. Environ. 2021, 200, 107924. [Google Scholar] [CrossRef]
  19. Porsani, G.B.; Del Valle de Lersundi, K.; Gutiérrez, A.S.-O.; Bandera, C.F. Interoperability between Building Information Modelling (BIM) and Building Energy Model (BEM). Appl. Sci. 2021, 11, 2167. [Google Scholar] [CrossRef]
  20. Bayhan, H.G.; Karaca, E. Technological innovation in architecture and engineering education—An investigation on three generations from Turkey. Int. J. Educ. Technol. High. Educ. 2020, 17, 33. [Google Scholar] [CrossRef]
  21. Sanchez-Lite, A.; Gonzalez, C.; Zulueta, P.; Sampaio, Z. A Comparative Study of the Use of Building Information Modeling in Teaching Engineering Projects. IEEE Access 2020, 8, 220046–220057. [Google Scholar] [CrossRef]
  22. Sánchez, A.; González-Gaya, C.; Zulueta, P.; Sampaio, Z. Introduction of Building Information Modeling in Industrial Engineering Education: Students’ Perception. Appl. Sci. 2019, 9, 3287. [Google Scholar] [CrossRef] [Green Version]
  23. Ferrandiz, J.; Banawi, A.; Peña, E. Evaluating the benefits of introducing “BIM” based on Revit in construction courses, without changing the course schedule. Univers. Access Inf. Soc. 2018, 17, 491–501. [Google Scholar] [CrossRef]
  24. Sánchez, A.; Zulueta, P. Generación de un entorno colaborativo BIM (Bulding Information Modeling) educativo-empresarial en asignaturas de proyectos técnicos industriales: Muestra tu proyecto. Dykinson Innovación Docente Investig. Cienc. Ing. Arquit. 2019, 1, 569–578. [Google Scholar]
  25. Gomara, F.E.; Concepción, D.N.; González, E.; de Armas, A.C. La investigación científica en la formación del estudiante universitario mediante el vínculo universidad-empresa. Rev. Univ. Y Soc. 2021, 13, 383–388. [Google Scholar]
  26. UNESCO. World Conference on Education for Sustainable Development; Declaración de Berlín sobre la Educación para el Desarrollo Sostenible: Berlin, Germany, 2021. [Google Scholar]
  27. Real Decreto 486/1997, de 14 de Abril, Por el que se Establecen las Disposiciones Mínimas de Seguridad y Salud en los Lugares de Trabajo. Available online: https://www.boe.es/eli/es/rd/1997/04/14/486/con (accessed on 14 June 2022).
  28. Real Decreto 2267/2004, de 3 de Diciembre, Por el que se Aprueba el Reglamento de Seguridad Contra Incendios en los Establecimientos Industriales. Available online: https://www.boe.es/eli/es/rd/2004/12/03/2267 (accessed on 14 June 2022).
  29. CTE. Código Técnico de la Edificación. Available online: https://www.codigotecnico.org/DocumentosCTE/DocumentosCTE.html (accessed on 14 June 2022).
  30. McAtamney, L.; Corlett, E.N. RULA: A survey method for the investigation of work-related upper limb disorders. Appl. Ergon. 1993, 24, 91–99. [Google Scholar] [CrossRef]
  31. Waters, T.R.; Putz–Anderson, V.; Garg, A.; Cincinnati, O.H. Applications Manual for the Revised NIOSH Lifting Equation; U.S. Department of Health and Human Services, Centers for Disease Control and Prevention, National Institute for Occupational Safety and Health, DHHS (NIOSH) Publication: Washington, DC, USA, 1994. [CrossRef]
  32. Bovea, M.D.; Pérez-Belis, V. A taxonomy of ecodesign tools for integrating environmental requirements into the product design process. J. Clean. Prod. 2012, 20, 61–71. [Google Scholar] [CrossRef]
  33. ISO 14040 International Standard; Environmental Management—Life Cycle Assessment—Principles and Framework. ISO International Organisation for Standardization: Geneva, Switzerland, 2006.
  34. Blanco, M.; Gonzalez, C.; Sanchez-Lite, A.; Sebastian, M.A. A Practical Evaluation of a Collaborative Learning Method for Engineering Project Subjects. IEEE Access 2017, 5, 19363–19372. [Google Scholar] [CrossRef]
  35. García, R. Análisis teórico de la transferencia de conocimientos universidad-empresa mediante la colaboración. Econ. Teoría Y Práctica 2008, 29, 51–86. [Google Scholar] [CrossRef]
  36. Aizpun, M.; Sandino, D.; Merideno, I. Developing students’ aptitudes through University-Industry collaboration. Ing. E Investig. 2015, 35, 12. [Google Scholar] [CrossRef]
  37. ISO 29481-1:2016; Building Information Models—Information Delivery Manual—Part 1: Methodology and Format. ISO (International Organization for Standardization): Geneva, Switzerland, 2016.
  38. Penn State University. BIM Project Execution Planning Guide—Version 3.0; The Pennsylvania State University: State College, PA, USA, 2021. [Google Scholar]
  39. Rezaei, J. Best-worst multi-criteria decision-making method. Omega 2015, 53, 49–57. [Google Scholar] [CrossRef]
  40. Zadeh, L.A. The concept of a linguistic variable and its application to approximate reasoning-I. Inf. Sci. 1975, 8, 199–249. [Google Scholar] [CrossRef]
  41. Opricovic, S. Fuzzy VIKOR with an application to water resources planning. Expert Syst. Appl. 2011, 38, 12983–12990. [Google Scholar] [CrossRef]
  42. Opricovic, S.; Tzeng, G.-H. Extended VIKOR method in comparison with outranking methods. Eur. J. Oper. Res. 2007, 178, 514–529. [Google Scholar] [CrossRef]
  43. Chang, T.-H. Fuzzy VIKOR method: A case study of the hospital service evaluation in Taiwan. Inf. Sci. 2014, 271, 196–212. [Google Scholar] [CrossRef]
  44. How to Make an Alluvial Diagram by RAWGraphs Team. Licensed under CC BY-NC-SA MH.0. Available online: https://rawgraphs.io/learning/how-to-make-an-alluvial-diagram/ (accessed on 14 June 2022).
  45. RAWGraph. A Free and Open Source Tool for Data Visualization. Available online: https://www.rawgraphs.io (accessed on 14 June 2022).
  46. Ruspini, E.H.; Bezdek, J.C.; Keller, J.M. Fuzzy Clustering: A Historical Perspective. IEEE Comput. Intell. Mag. 2019, 14, 45–55. [Google Scholar] [CrossRef]
  47. Marutho, D.; Handaka, S.H.; Wijaya, E. The Determination of Cluster Number at k-Mean Using Elbow Method and Purity Evaluation on Headline News. In Proceedings of the 2018 International Seminar on Application for Technology of Information and Communication, Semarang, Indonesia, 21–22 September 2018; pp. 533–538. [Google Scholar] [CrossRef]
  48. Rousseeuw, P.J. Silhouettes: A graphical aid to the interpretation and validation of cluster analysis. J. Comput. Appl. Math. 1987, 20, 53–65. [Google Scholar] [CrossRef] [Green Version]
  49. Kass, G.V. An Exploratory Technique for Investigating Large Quantities of Categorical Data. J. R. Stat. Soc. 1980, 29, 119–127. [Google Scholar] [CrossRef]
  50. Wu, T.-H.; Wu, F.; Liang, C.-J.; Li, Y.-F.; Tseng, C.-M.; Kang, S.-C. A virtual reality tool for training in global engineering collaboration. Univers. Access Inf. Soc. 2017, 18, 243–255. [Google Scholar] [CrossRef]
  51. Ghosh, A.; Parrish, K.; Chasey, A.D. Implementing a Vertically Integrated BIM Curriculum in an Undergraduate Construction Management Program. Int. J. Constr. Educ. Res. 2014, 11, 121–139. [Google Scholar] [CrossRef]
  52. Puolitaival, T.; Forsythe, P. Practical challenges of BIM education. Struct. Surv. 2016, 34, 351–366. [Google Scholar] [CrossRef]
  53. Besné, A.; Pérez, M.; Necchi, S.; Peña, E.; Fonseca, D.; Navarro, I.; Redondo, E. A Systematic Review of Current Strategies and Methods for BIM Implementation in the Academic Field. Appl. Sci. 2021, 11, 5530. [Google Scholar] [CrossRef]
  54. Zhang, J.; Zhang, Z.; Philbin, S.P.; Huijser, H.; Wang, Q.; Jin, R. Toward next-generation engineering education: A case study of an engineering capstone project based on BIM technology in MEP systems. Comput. Appl. Eng. Educ. 2022, 30, 146–162. [Google Scholar] [CrossRef]
  55. Mu, Z. Effective Way and Method of Education through University-Enterprise Cooperation Based on University-Enterprise Benefit Community. In Proceedings of the 2015 3rd International Conference on Education, Management, Arts, Economics and Social Science, Changsha, China, 28–29 December 2015; pp. 152–156. [Google Scholar]
  56. Deci, E.L.; Vallerand, R.J.; Pelletier, L.G.; Ryan, R.M. Motivation and Education: The Self-Determination Perspective. Educ. Psychol. 1991, 26, 325–346. [Google Scholar] [CrossRef]
  57. Henderson-King, D.; Smith, M.N. Meanings of Education for University Students: Academic Motivation and Personal Values as Predictors. Soc. Psychol. Educ. 2006, 9, 195–221. [Google Scholar] [CrossRef]
  58. Blumenfeld, P.C.; Soloway, E.; Marx, R.W.; Krajcik, J.S.; Guzdial, M.; Palincsar, A. Motivating Project-Based Learning: Sustaining the Doing, Supporting the Learning. Educ. Psychol. 1991, 26, 369–398. [Google Scholar] [CrossRef]
  59. Porter, J.R.; Koola, P.M.; Subramanian, R. eSMART: A Collaborative, Competitive Challenge to Foster Engineering Education; ASEE Conferences: Prairie View, TX, USA, 2022. [Google Scholar]
  60. Wankat, P.C. Undergraduate Student Competitions. J. Eng. Educ. 2005, 94, 343–347. [Google Scholar] [CrossRef]
  61. Wolfinbarger, K.G.; Shehab, R.L.; Trytten, D.A.; Walden, S.E. The influence of engineering competition team participation on students’ leadership identity development. J. Eng. Educ. 2021, 110, 925–948. [Google Scholar] [CrossRef]
  62. Ploskas, N.; Papathanasiou, J. A decision support system for multiple criteria alternative ranking using TOPSIS and VIKOR in fuzzy and nonfuzzy environments. Fuzzy Sets Syst. 2019, 377, 1–30. [Google Scholar] [CrossRef]
  63. Kizielewicz, B.; Bączkiewicz, A. Comparison of Fuzzy TOPSIS, Fuzzy VIKOR, Fuzzy WASPAS and Fuzzy MMOORA methods in the housing selection problem. Procedia Comput. Sci. 2021, 192, 4578–4591. [Google Scholar] [CrossRef]
  64. Opricovic, S.; Tzeng, G.-H. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. Eur. J. Oper. Res. 2004, 156, 445–455. [Google Scholar] [CrossRef]
Figure 1. Premises of the practical work of the subject.
Figure 1. Premises of the practical work of the subject.
Buildings 12 00971 g001
Figure 2. Evaluation phases.
Figure 2. Evaluation phases.
Buildings 12 00971 g002
Figure 3. Schedule of project phases.
Figure 3. Schedule of project phases.
Buildings 12 00971 g003
Figure 4. Academic proposal, industrial building, and process: (a) Exterior of industrial building (b); interior of the administrative area; (c) interior of the industrial area; (d) work cell.
Figure 4. Academic proposal, industrial building, and process: (a) Exterior of industrial building (b); interior of the administrative area; (c) interior of the industrial area; (d) work cell.
Buildings 12 00971 g004
Figure 5. Sustainability strategies: (a) Solar study. Revit model (b) Examples of vegetation cover. Revit model; (c) distribution of spaces, interior administrative area.
Figure 5. Sustainability strategies: (a) Solar study. Revit model (b) Examples of vegetation cover. Revit model; (c) distribution of spaces, interior administrative area.
Buildings 12 00971 g005
Figure 6. Academic Evaluation: Alluvial Diagram (score < 2: low, scores 2 to 3: medium, scores 3 to 4: high, scores ≥ 4: very high. Data displayed graphically using RAWGraphs [45]).
Figure 6. Academic Evaluation: Alluvial Diagram (score < 2: low, scores 2 to 3: medium, scores 3 to 4: high, scores ≥ 4: very high. Data displayed graphically using RAWGraphs [45]).
Buildings 12 00971 g006
Figure 7. (a) Evolution of the clustering criterion. (b) Silhouettes of clusters.
Figure 7. (a) Evolution of the clustering criterion. (b) Silhouettes of clusters.
Buildings 12 00971 g007
Figure 8. Classification tree of the samples.
Figure 8. Classification tree of the samples.
Buildings 12 00971 g008
Table 1. Practical sessions in laboratory: Tools and objectives.
Table 1. Practical sessions in laboratory: Tools and objectives.
SoftwareObjective
REVIT, SketchUp, MagiCAD, Navisworks, Arquimedes
Green Building Studio CYPE, Lumion
BIM Methodology Development
DIALuxLighting Systems Design
SimaProLife Cycle Analysis (LCA)
CATIA, DELMIA HUMANCAD Design, Ergonomic Analysis
TRELLOManage Project
Table 2. Project development in technical project subject: phases, stages and activities.
Table 2. Project development in technical project subject: phases, stages and activities.
PhasesActions
Prephase
Stage 0: Order of magnitudeMeeting of the teaching team and company managers. First approach to the project. Proposal of the type of industrial project to be developed. Conditions of collaboration.
Project phases
Stage 1: PreliminaryFormation of work teams: assignment of roles. Global vision of requirements and objectives of the project. Concept generation.
Stage 2: DesignApplication of sustainability criteria. Exposure sessions and debate between work teams
Stage 3: DevelopmentGeneration of digital models. Formalization of the technical project: Project + Process engineering.
Contest phases
Stage 4: Contest IPresentation and defense of projects before jury (teaching + company team).
Stage 5: Competition IIMeeting of the teaching team and company managers: Preparation of the training stay.
Stage 6: Competition IIIAcquisition by students of specialized training in the company.
Evaluation phases
Step 7: Evaluation IAcademic evaluation of the projects carried out.
Step 8: Evaluation IIStudent survey: analysis of results.
Table 3. Projects deliveries.
Table 3. Projects deliveries.
DeliveryDescription
3D BIM ModelFinal Industrial building in 3D (REVIT model): selection of alternative layouts, construction solutions, materials, orientation, solar study and other studies to verify a sustainable project.
Industrial ProcessDevelopment of manufacturing process: layout, number of work cells line balancing, cycle time, production, and ergonomics process analysis
Mechanical, Electrical and Plumbing systems (MEP)Development of at least one complete system
SustainabilityProject life cycle analysis (LCA) study. Basic analysis of the environmental impact of project implementation.
Final Oral PresentationOral presentation and defense of the project in class
Table 4. Criteria used to academic evaluation: criteria and relative importance of each criterion (weights).
Table 4. Criteria used to academic evaluation: criteria and relative importance of each criterion (weights).
CategoryCriteriaWeight
BWMUncertainly
Overall technical learningOLL: level of the technical project0.2239[0.1221, 0.1628, 0.1832, 0.2239]
Other SkillsS1: level of use of ICT tools 0.1119[0.0061, 0.0814, 0.0916, 0.1119]
S2: degree of integration and maturity in teamwork 0.1119[0.0611, 0.0814, 0.0916, 0.1119]
S3: level of autonomous learning 0.0896[0.0489, 0.6512, 0.7327, 0.0896]
S4: degree of critical awareness and self-criticism0.0896[0.0489, 0.6512, 0.7327, 0.0896]
S5: level of reasoning and decision-making0.1119[0.0611, 0.0814, 0.0916, 0.1119]
S6: level of drafting technical documentation0.1493[0.0814, 0.1086, 0.1221, 0.1493]
S7: level of presentation and defense of the results 0.1119[0.0611, 0.0814, 0.0916, 0.1119]
Table 5. Sample Course rating scale.
Table 5. Sample Course rating scale.
Linguistic TermValueRating Scale
(Uncertainty Conditions)
Very Low0.0 < S1 ≤ 0.0[0.0, 0.0, 0.5, 1.0]
Low1.0 < S2 ≤ 1.5[0.5, 1.0, 1.0, 1.5]
Medium Low1.5 < S3 ≤ 2.5[1.0, 1.5, 2.0, 2.5]
Medium2.5 < S4 ≤ 3.5[2.0, 2.5, 2.5, 3.0]
Medium High3.5 < S5 ≤ 4.0[2.5, 3.0, 3.5, 4.0]
High4.0 < S6 ≤ 4.5[3.5, 4.0, 4.0, 4.5]
Very High4.5 < S7 ≤ 5.0[4.0, 4.5, 5.0, 5.0]
Table 6. Survey conducted with students on the project, BIM, and university-company collaboration.
Table 6. Survey conducted with students on the project, BIM, and university-company collaboration.
Field Question
On the collaboration with the companyQ1Is it more motivating to orient the projects of the subject toward a real problem raised in collaboration with a company?
Q2Do you think that it is more effective for learning to carry out a project related to an existing company than to recreate a fictitious project?
On conducting an internal competitionQ3Has establishing an internal subject-company competition as a goal for obtaining a reward increased the degree of involvement in the subject?
Q4Do you think that presenting and defending the project for evaluation before a jury (faculty + company representatives) can improve the degree of visibility of students before their incorporation into the world of work?
Q5Do you consider the award of a training stay in the company interesting?
About the BIM methodologyQ6The incidence of the BIM methodology in the project was valued
Q7Collaborative and coordinated BIM work, with sharing through a central file and subprojects, was valued
On the typology of the projectQ8The incidence of sustainability aspects in the project was high
Q9Do you consider it interesting to have carried out in the course of Industrial Technical Projects an industrial project understood as industrial building + process development?
Q10Would you consider it interesting to carry out a project on an industrial product in the course of Industrial Technical Projects?
Table 7. Projects objectives and potential BIM Uses.
Table 7. Projects objectives and potential BIM Uses.
PriorityProject ObjetivesPotential BIM Uses
1Archive a high quality of design and project documentationDesigner, Design Reviews, 3D Coordination
1Good monitor the process of design to ensure correct deadline of the projectDesigner, Design Reviews, 3D Coordination
1Include all customers targetsEngineering Analysis
2Include sustainability solutionsEngineering Analysis
Table 8. Models generated according to technical issue and software used.
Table 8. Models generated according to technical issue and software used.
Technical IssueSoftwareFile extensionVersion
3D ModelingREVITRVTEducational
Mechanical, Electrical and Plumbing systems (MEP)REVIT/DDS Cad/MagiCAD/DIALuxRVTEducational
Render and video LUMION Educational
Modeling and structural analysisREVIT/ROBOT Structural Analysis Professional/CYPERVT/RTD/FCEducational
Clash detection and coordination in BIMNavisworksIFCEducational
Bill of quantities of BIM modelsREVIT/Arquímedes/MSProject/NavisworksRVT/MCSV/MPP/NWF/NWCEducational
Building Energy Analysis/SustainabilityGreen Building Studio/SimaProRVT/pdf, gbXM/DOE-2/.EnergyPlus EcoSpold1/CSV, ILCDEducational
Industrial ProcessCATIA V5
DELMIA HUMAN
CATPART/DWGEducational
Table 9. Sustainability strategies: academic proposals.
Table 9. Sustainability strategies: academic proposals.
FieldAction
Orientation Solar impact Study (Revit Model)
Industrial building envelopeIntensive and extensive green roofs
Exhaustive control of the thermal load of the building in vertical enclosures.
Photocatalytic pavements in horizontal enclosures
Distribution of spacesDesign of outdoor patios inside the industrial building with trees and benches.
Natural ventilation and lighting, with the provision, of darkening devices, transformation of direct radiation into diffuse, uniform distribution of light, conditioning equipment or devices, and penetration of light in places away from light inputs
FacilitiesPhotovoltaic panels installed on the roof
Construction of Canadian wells
Low consumption lamps and high efficiency luminaires
Separation networks, recovery and reuse of gray water
Life-cycle analysis (LCA) of the elements of the production line
Waste managementInstallation of a steam boiler and a turbine to energetically take advantage of waste from the exhaust gases from the engines in the bench tests
Table 10. Teacher evaluation of criteria: statistical results.
Table 10. Teacher evaluation of criteria: statistical results.
OLLS1S2S3S4S5S6S7
Minimum2.001.0001.0001.0002.0002.0003.0003.000
Maximum5.0005.0005.0005.0004.0005.0005.0005.000
Freq. of Minimum43334277
Freq. del Maximum54547346
Mean3.6253.5833.7503.5003.1253.5003.8753.958
Std. deviation (n − 1)1.0131.1761.1891.1800.6800.8340.6800.751
Table 11. Teacher evaluation: Fuzzy VIKOR results and ranking courses by S, R and Q (υ = 0.5).
Table 11. Teacher evaluation: Fuzzy VIKOR results and ranking courses by S, R and Q (υ = 0.5).
CourseSiRiQi
ValueOrderValueOrderValueOrder
C_1_1_1_30.1269710.3235310.003901
C_1_1_1_60.1269920.3235420.003942
C_1_1_1_10.1475140.3329830.015693
C_1_1_1_50.1290430.3768050.016034
C_1_0_1_60.1621250.3760440.031775
C_1_0_1_30.2080460.3861570.073906
C_1_1_1_40.2160370.3840760.077517
C_1_1_1_20.2172080.3906690.078538
C_1_1_1_70.2172190.39167100.079539
C_0_0_1_40.22576100.3894880.0808210
C_1_1_1_80.22822110.39168110.0839611
C_1_0_1_20.23608120.40870130.0911012
C_1_0_1_70.24630130.40871140.0952313
C_0_0_0_20.25016140.40490120.1084614
C_1_0_1_10.25490150.41735160.1148115
C_0_0_1_10.27651170.41548150.1225216
C_0_0_1_30.31046190.42909170.1407317
C_1_0_1_40.32346240.47424240.1428218
C_1_0_1_50.31074200.46720220.1516019
C_1_0_0_10.31079210.46728230.1516620
C_0_0_0_10.25962160.44249190.1546021
C_0_0_0_30.27656180.44776200.1632122
C_0_0_1_20.31083220.44249190.1747223
C_0_0_0_40.31517230.45317210.1808024
Table 12. Teacher evaluation of criteria: ANOVA results.
Table 12. Teacher evaluation of criteria: ANOVA results.
OLLSourceDFSSRMSFp-ValueEffect Size (η2)
BIM11.6441.6445.7690.0260.0651
Enterprise11.4511.4515.0890.0350.0578
Sustainability13.6743.67412.8880.0020.1346
Error205.7010.285
Corrected Total2323.625
S1SourceDFSSRMSFp-ValueEffect Size (η2)
BIM14.5684.5684.6870.0430.1255
Enterprise19.1319.1319.3700.0060.2229
Sustainability11.7611.7611.8070.1940.0524
Error2019.489
Corrected Total2331.833
S2SourceDFSSRMSFp-ValueEffect Size (η2)
BIM16.8356.8356.0510.0230.1738
Enterprise16.7726.7725.9950.0240.1724
Sustainability10.6580.6580.5820.4540.0198
Error2022.594
Corrected Total2332.500
S3SourceDFSSRMSFp-ValueEffect Size (η2)
BIM15.7395.7394.5390.0460.1521
Enterprise12.3322.3321.8440.1900.0679
Sustainability11.9621.9621.5520.2270.0578
Error2025.2881.264
Corrected Total2332.500
S4SourceDFSSRMSFp-ValueEffect Size (η2)
BIM12.2832.2837.8370.0110.1769
Enterprise10.0460.0460.1590.6950.0043
Sustainability10.0490.0490.1680.6860.0046
Error205.8260.291
Corrected Total2332.500
S6SourceDFSSRMSFp-ValueEffect Size (η2)
BIM12.8892.8898.2940.0090.2138
Enterprise10.0140.0140.0400.8430.0013
Sustainability10.6580.6581.8880.1850.0583
Error206.9680.348
Corrected Total2310.625
Table 13. Survey conducted with students on the project, BIM, and university-company collaboration: Statistical Results.
Table 13. Survey conducted with students on the project, BIM, and university-company collaboration: Statistical Results.
VariableMinimumMaximumMeanStd. Deviation
Q1454.830.38
Q2354.390.85
Q3152.611.24
Q4153.281.27
Q5152.671.57
Q6153.561.38
Q7153.221.70
Q8143.000.84
Q9143.671.49
Q10243.220.73
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Sanchez-Lite, A.; Zulueta, P.; Sampaio, A.Z.; Gonzalez-Gaya, C. BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception. Buildings 2022, 12, 971. https://doi.org/10.3390/buildings12070971

AMA Style

Sanchez-Lite A, Zulueta P, Sampaio AZ, Gonzalez-Gaya C. BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception. Buildings. 2022; 12(7):971. https://doi.org/10.3390/buildings12070971

Chicago/Turabian Style

Sanchez-Lite, Alberto, Patricia Zulueta, Alcínia Zita Sampaio, and Cristina Gonzalez-Gaya. 2022. "BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception" Buildings 12, no. 7: 971. https://doi.org/10.3390/buildings12070971

APA Style

Sanchez-Lite, A., Zulueta, P., Sampaio, A. Z., & Gonzalez-Gaya, C. (2022). BIM for the Realization of Sustainable Digital Models in a University-Business Collaborative Learning Environment: Assessment of Use and Students’ Perception. Buildings, 12(7), 971. https://doi.org/10.3390/buildings12070971

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop