Next Article in Journal
Multifactorial Chloride Ingress Model for Reinforced Concrete Structures Subjected to Unsaturated Conditions
Next Article in Special Issue
Check and Validation of Building Information Models in Detailed Design Phase: A Check Flow to Pave the Way for BIM Based Renovation and Construction Processes
Previous Article in Journal
A Parallel Dissipation-Free and Dispersion-Optimized Explicit Time-Domain FEM for Large-Scale Room Acoustics Simulation
Previous Article in Special Issue
Clash Detection Using Building Information Modeling (BIM) Technology in the Republic of Kazakhstan
 
 
Article

Article Versions Notes

Buildings 2022, 12(2), 106; https://doi.org/10.3390/buildings12020106
Action Date Notes Link
article pdf uploaded. 23 January 2022 11:09 CET Version of Record https://www.mdpi.com/2075-5309/12/2/106/pdf-vor
article xml file uploaded 24 January 2022 09:14 CET Original file -
article xml uploaded. 24 January 2022 09:14 CET Update https://www.mdpi.com/2075-5309/12/2/106/xml
article pdf uploaded. 24 January 2022 09:14 CET Updated version of record https://www.mdpi.com/2075-5309/12/2/106/pdf
article html file updated 24 January 2022 09:16 CET Original file -
article html file updated 24 January 2022 09:19 CET Update -
article html file updated 24 January 2022 10:09 CET Update -
article html file updated 31 July 2022 05:32 CEST Update https://www.mdpi.com/2075-5309/12/2/106/html
Back to TopTop