Next Article in Journal
Grouping Preventive Maintenance Strategy of Flexible Manufacturing Systems and Its Optimization Based on Reliability and Cost
Previous Article in Journal
On Constraints and Parasitic Motions of a Tripod Parallel Continuum Manipulator
Previous Article in Special Issue
Muscle Selection Using ICA Clustering and Phase Variable Method for Transfemoral Amputees Estimation of Lower Limb Joint Angles
 
 
Due to scheduled maintenance work on our database systems, there may be short service disruptions on this website between 10:00 and 11:00 CEST on June 14th.
Article

Article Versions Notes

Action Date Notes Link
article xml file uploaded 6 January 2023 13:45 CET Original file -
article xml uploaded. 6 January 2023 13:45 CET Update https://www.mdpi.com/2075-1702/11/1/73/xml
article pdf uploaded. 6 January 2023 13:45 CET Version of Record https://www.mdpi.com/2075-1702/11/1/73/pdf
article html file updated 6 January 2023 13:47 CET Original file -
article html file updated 7 March 2023 21:06 CET Update https://www.mdpi.com/2075-1702/11/1/73/html
Back to TopTop