Next Article in Journal
Design and Optimization of a Fuzzy Logic System for Academic Performance Prediction
Next Article in Special Issue
Optimization Model for the Pavement Pothole Repair Problem Considering Consumable Resources
Previous Article in Journal
Properties of Quantizer and Dequantizer Operators for Qudit States and Parametric Down-Conversion
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Application of Game Theory against Nature in Supporting Bid Pricing in Construction

Faculty of Civil Engineering and Architecture, Lublin University of Technology, 40 Nadbystrzycka St, 20-618 Lublin, Poland
*
Author to whom correspondence should be addressed.
Symmetry 2021, 13(1), 132; https://doi.org/10.3390/sym13010132
Submission received: 10 December 2020 / Revised: 11 January 2021 / Accepted: 11 January 2021 / Published: 14 January 2021
(This article belongs to the Special Issue Symmetry in Civil Engineering)

Abstract

The problem of setting prices for construction works is significant for both the investor and contractor companies. The periodically occurring instabilities in the economy require investment process participants to perform detailed market analyses and assessments, as well as to monitor price forecasts in construction. It is only after such an assessment that it is possible within the framework of the initial assumptions for cost calculation to select the basis for setting prices and their levels. The identification and analysis of the risks related to uncontrolled price increases allow contractors to secure their businesses by developing bids that ensure maximum profit. In view of the above, this study proposes an approach based on the use of game theory against nature to identify the optimal variant of a bid estimate. The study considers price forecasts for construction products, which may reduce the negative impact in case the prices increase. The obtained results confirmed the effectiveness of the used decision-making support methods, indicating the optimal strategy to reduce financial losses in times of market instability. The proposed approach also allows for a balance (symmetry) between maximum profit and probability of winning the contract.
Keywords: bid price predicting; civil engineering; construction company marketing; construction project management; cost management; decision-making methods; game theory bid price predicting; civil engineering; construction company marketing; construction project management; cost management; decision-making methods; game theory

Share and Cite

MDPI and ACS Style

Rzepecki, Ł.; Jaśkowski, P. Application of Game Theory against Nature in Supporting Bid Pricing in Construction. Symmetry 2021, 13, 132. https://doi.org/10.3390/sym13010132

AMA Style

Rzepecki Ł, Jaśkowski P. Application of Game Theory against Nature in Supporting Bid Pricing in Construction. Symmetry. 2021; 13(1):132. https://doi.org/10.3390/sym13010132

Chicago/Turabian Style

Rzepecki, Łukasz, and Piotr Jaśkowski. 2021. "Application of Game Theory against Nature in Supporting Bid Pricing in Construction" Symmetry 13, no. 1: 132. https://doi.org/10.3390/sym13010132

APA Style

Rzepecki, Ł., & Jaśkowski, P. (2021). Application of Game Theory against Nature in Supporting Bid Pricing in Construction. Symmetry, 13(1), 132. https://doi.org/10.3390/sym13010132

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop