You are currently viewing a new version of our website. To view the old version click .
Remote Sensing
  • Correction
  • Open Access

31 March 2025

Correction: Marchamalo-Sacristán et al. MT-InSAR and Dam Modeling for the Comprehensive Monitoring of an Earth-Fill Dam: The Case of the Benínar Dam (Almería, Spain). Remote Sens. 2023, 15, 2802

,
,
,
,
,
,
,
,
and
1
Department of Land Morphology and Engineering, Universidad Politécnica de Madrid, 28040 Madrid, Spain
2
Department of Cartographic, Geodetic and Photogrammetry Engineering, University of Jaén, Campus Las Lagunillas s/n, 23071 Jaén, Spain
3
Center for Advanced Studies in Earth Sciences, Energy and Environment (CEACTEMA), University of Jaén, Campus Las Lagunillas s/n, 23071 Jaén, Spain
4
Research Group RNM-282 Microgeodesia Jaén, University of Jaén, Campus Las Lagunillas s/n, 23071 Jaén, Spain
This article belongs to the Special Issue Dam Stability Monitoring with Satellite Geodesy
The authors wish to make the following corrections to this manuscript [1]:
1. The Equation (6):
d A s c d D e s c = sin θ A s c cos A s c cos θ A s c sin θ D e s c cos D e s c cos θ D e s c · d E a s t d U p = M d E a s t d U p
should be replaced with:
d A s c d D e s c = sin θ A s c cos A s c cos θ A s c sin θ D e s c cos D e s c cos θ D e s c · d E a s t d U p = M d E a s t d U p
2. A correction has been made to **3. Materials and Methods, 3.3. MT-InSAR Processing, 3.3.3. Software**, **Paragraph Number 5**: “… Asc and Desc are the horizontal angles of the LOS directions measured from the east in a clockwise direction…”.
The words “horizontal”, “LOS”, and “east” should be replaced with “heading”, “orbit”, and “north,” respectively, as in: “… Asc and Desc are the heading angles of the orbit directions measured from the north in a clockwise direction.…”.
3. An erratum was present in Figure 12, as originally published. The white arrows indicating the line-of-sight (LOS) directions are shifted. The arrow in the left image (ERS 1/2 descending images) should be pointing westwards, and the arrow in the right image (ENVISAT ascending images) should be pointing eastwards. The revised version of Figure 12 is shown in the figure below.
Figure 12. Mean LOS velocity (mm/year) of Benínar Dam calculated from (left) 22 ERS-1/2 descending images from period 6 June 1992–31 October 2000 and (right) 32 Envisat ascending images from period 3 December 2002–29 June 2010.
4. Missing Funding. The original publication did not include the funder **Comunidad de Madrid**, **IND2020/TIC-17528**.
The authors would like to apologize for any inconvenience caused to the readers by these changes. The authors state that the scientific conclusions are unaffected. This correction was approved by the Academic Editor. The original publication has also been updated.

Reference

  1. Marchamalo-Sacristán, M.; Ruiz-Armenteros, A.M.; Lamas-Fernández, F.; González-Rodrigo, B.; Martínez-Marín, R.; Delgado-Blasco, J.M.; Bakon, M.; Lazecky, M.; Perissin, D.; Papco, J.; et al. MT-InSAR and Dam Modeling for the Comprehensive Monitoring of an Earth-Fill Dam: The Case of the Benínar Dam (Almería, Spain). Remote Sens. 2023, 15, 2802. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.