Next Article in Journal
A Forecast Model for the Level of Engineering Maturity Impact on Contractor’s Procurement and Construction Costs for Offshore EPC Megaprojects
Next Article in Special Issue
Constraint Satisfaction in Current Control of a Five-Phase Drive with Locally Tuned Predictive Controllers
Previous Article in Journal
Sizing and Siting of Distributed Generators and Energy Storage in a Microgrid Considering Plug-in Electric Vehicles
Previous Article in Special Issue
Model-Based Predictive Current Controllers in Multiphase Drives Dealing with Natural Reduction of Harmonic Distortion
 
 
Article

Article Versions Notes

Energies 2019, 12(12), 2294; https://doi.org/10.3390/en12122294
Action Date Notes Link
article xml file uploaded 15 June 2019 12:38 CEST Original file -
article xml uploaded. 15 June 2019 12:38 CEST Update https://www.mdpi.com/1996-1073/12/12/2294/xml
article pdf uploaded. 15 June 2019 12:38 CEST Version of Record https://www.mdpi.com/1996-1073/12/12/2294/pdf
article html file updated 15 June 2019 12:39 CEST Original file -
article html file updated 4 July 2019 12:57 CEST Update -
article html file updated 21 October 2019 23:26 CEST Update -
article html file updated 12 February 2020 20:00 CET Update https://www.mdpi.com/1996-1073/12/12/2294/html
Back to TopTop