Ghasemkhani, B.; Kut, R.A.; Yilmaz, R.; Birant, D.; Arıkök, Y.A.; Güzelyol, T.E.; Kut, T.
Machine Learning Model Development to Predict Power Outage Duration (POD): A Case Study for Electric Utilities. Sensors 2024, 24, 4313.
https://doi.org/10.3390/s24134313
AMA Style
Ghasemkhani B, Kut RA, Yilmaz R, Birant D, Arıkök YA, Güzelyol TE, Kut T.
Machine Learning Model Development to Predict Power Outage Duration (POD): A Case Study for Electric Utilities. Sensors. 2024; 24(13):4313.
https://doi.org/10.3390/s24134313
Chicago/Turabian Style
Ghasemkhani, Bita, Recep Alp Kut, Reyat Yilmaz, Derya Birant, Yiğit Ahmet Arıkök, Tugay Eren Güzelyol, and Tuna Kut.
2024. "Machine Learning Model Development to Predict Power Outage Duration (POD): A Case Study for Electric Utilities" Sensors 24, no. 13: 4313.
https://doi.org/10.3390/s24134313
APA Style
Ghasemkhani, B., Kut, R. A., Yilmaz, R., Birant, D., Arıkök, Y. A., Güzelyol, T. E., & Kut, T.
(2024). Machine Learning Model Development to Predict Power Outage Duration (POD): A Case Study for Electric Utilities. Sensors, 24(13), 4313.
https://doi.org/10.3390/s24134313