Next Article in Journal
Application of Collaborative Engineering to Manage the Work of BIM Construction Stakeholders (Design Stage)
Previous Article in Journal
A Longitudinal Study of Post-Disaster Resettlement in Nepal: Insights into Building Back Better
 
 
Due to scheduled maintenance work on our servers, there may be short service disruptions on this website between 11:00 and 12:00 CEST on March 28th.
Article

Article Versions Notes

Architecture 2025, 5(1), 18; https://doi.org/10.3390/architecture5010018
Action Date Notes Link
article html file updated 24 June 2025 17:40 CEST Update https://www.mdpi.com/2673-8945/5/1/18/html
article html file updated 24 February 2025 10:15 CET Original file -
article pdf uploaded. 24 February 2025 10:11 CET Version of Record https://www.mdpi.com/2673-8945/5/1/18/pdf
article xml uploaded. 24 February 2025 10:11 CET Update https://www.mdpi.com/2673-8945/5/1/18/xml
article xml file uploaded 24 February 2025 10:11 CET Original file -
Back to TopTop