Next Article in Journal
UIS Characterization of LOCOS-Based LDMOS Transistor Fabricated by 1 µm CMOS Process
Previous Article in Journal
Adaptive Sliding Mode Control Improved by Fuzzy-PI Controller: Applied to Magnetic Levitation System
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Proceeding Paper

A Comprehensive Assessment of the Wind Power Potential of NokKundi in Balochistan and Its Integration with the Local Electrical Grid †

1
Department of Electrical Engineering Technology, Benazir Bhutto Shaheed University of Technology and Skill Development Khairpur Mirs, Khairpur Mirs 66020, Pakistan
2
Department of Electrical Engineering BUITEMS, Quetta 87300, Pakistan
*
Author to whom correspondence should be addressed.
Presented at the 1st International Conference on Energy, Power and Environment, Gujrat, Pakistan, 11–12 November 2021.
Eng. Proc. 2021, 12(1), 96; https://doi.org/10.3390/engproc2021012096
Published: 10 February 2022
(This article belongs to the Proceedings of The 1st International Conference on Energy, Power and Environment)

Abstract

At present, decarbonization takes the top spot as a priority in the energy sector. The world has largely polluted its environment because of the use of non-renewable resources for electricity production. Therefore, governments worldwide are trying to reduce their reliance on highly emitted carbon fuels and utilize more renewable resources such as wind for electricity generation. There has been only a 6% utilization of Pakistan’s wind potential. Baluchistan’s NokKundi region boasts an enormous wind potential with exceptional wind velocities throughout the year. With this study, an abundance of wind potential and feasibility is explored using a complete simulation-based study of the said area. There has been a calculation of the load of the NokKundi area, and an appropriate wind farm has been designed to meet it. The HOMER software has been used to carry out a complete financial analysis for both standalone and grid-connected systems, including capital investment and running costs. An analysis of the load flow on a grid-connected system is carried out with the ETAP software. The study considers a 40 MW wind farm as a feasible alternative for meeting the load requirements of NokKundi. A complete analysis of the simulation results for both grid-connected and isolated wind farm systems concludes that the grid-connected system offers more advantages in terms of cost and smooth integration with the local grid.
Keywords: wind power generation; feasibility analysis; load flow analysis; wind power generation; wind farms; gird tied system; standalone system; feasibility analysis; load flow analysis wind power generation; feasibility analysis; load flow analysis; wind power generation; wind farms; gird tied system; standalone system; feasibility analysis; load flow analysis

Share and Cite

MDPI and ACS Style

Hussain, M.; Hussain, A.; Khan, S. A Comprehensive Assessment of the Wind Power Potential of NokKundi in Balochistan and Its Integration with the Local Electrical Grid. Eng. Proc. 2021, 12, 96. https://doi.org/10.3390/engproc2021012096

AMA Style

Hussain M, Hussain A, Khan S. A Comprehensive Assessment of the Wind Power Potential of NokKundi in Balochistan and Its Integration with the Local Electrical Grid. Engineering Proceedings. 2021; 12(1):96. https://doi.org/10.3390/engproc2021012096

Chicago/Turabian Style

Hussain, Muzamil, Arif Hussain, and Surat Khan. 2021. "A Comprehensive Assessment of the Wind Power Potential of NokKundi in Balochistan and Its Integration with the Local Electrical Grid" Engineering Proceedings 12, no. 1: 96. https://doi.org/10.3390/engproc2021012096

APA Style

Hussain, M., Hussain, A., & Khan, S. (2021). A Comprehensive Assessment of the Wind Power Potential of NokKundi in Balochistan and Its Integration with the Local Electrical Grid. Engineering Proceedings, 12(1), 96. https://doi.org/10.3390/engproc2021012096

Article Metrics

Back to TopTop