A Critical Look at the Need for Performing Multi-Hazard Probabilistic Risk Assessment for Nuclear Power Plants
Abstract
:1. Introduction
2. Single-Hazard PRA for NPPs
- Air-based external events are caused by airspeed, air temperature, air pressure, precipitation, humidity, air contamination, electromagnetic fields, and direct impact from the air.
- Ground-based external events are caused by ground speed, limited ground impact, direct impact from the ground, fire outside the plant, and ground contamination.
- Water-based external events are caused by water speed, water level, water temperature, soil impact, ice impact, solid impurities, water contamination, and direct impact from water.
- Seismic events
- Internal fires
- High winds and tornadoes
- External floods
- Transportation and nearby facility accidents
- Lightning
- Severe temperature transients, including extreme heat and extreme cold
- Severe weather storms
- External fires
- Extraterrestrial activity
- Volcanic activity
3. Multi-Hazard PRA for NPPs
- Hazards are phenomena that challenge the safe operation of a NPP, such as a seismic occurrence or high wind.
- Hazard event is an event caused by the occurrence of the specified hazard described in terms of various levels of some characteristic measure of its intensity, such as the peak ground acceleration for seismic hazards or wind speed for high wind hazards.
- Initiating events cover natural and human-made perturbations to the plant that can challenge control and safety systems, whose failure can lead to undesired consequences, such as radioactive material release. An initiating event can result from various hazard events internal (e.g., hardware fault, flood, fire) or external to the plant (e.g., earthquakes, high winds).
- Hazard analysis is the process of determining an estimate of the expected frequency of exceedance over a specified time interval of various levels of some characteristic measure of the intensity of the hazard, such as water level in a flood.
- Secondary hazard is a hazard induced by another hazard, such as a landslide caused by an earthquake.
- Multi-hazard is phenomenon in which one hazard occurs concurrently with another hazard, such as seismic and flooding.
- Multi-hazard (initiating) event is the occurrence of two or more correlated or uncorrelated events, such as an earthquake of a specific peak group acceleration and high winds of a specific wind speed.
- Initial data collection can be either site- or plant-specific. Then, the data is the source for screening analysis.
- Identification of hazards is the following step upon data gathering. The source for the hazards may be either natural or man-made.
- Hazard screening analysis aims to screen out the insignificant item or the items that have insignificant effects.
- Detailed hazards analysis analyzes the relevant hazards that affect the structures, systems, or components (SSCs).
4. Quantification of Multi-Hazard Risk
4.1. Sampling-Based Multi-Hazard PRA Algorithm
4.2. Trustworthiness of Risk Assessment
4.3. The Need for a General Multi-Hazard PRA Framework
5. Advanced Non-LWR Licensing Basis Event Selection (LBE) Approach
- AOOs are expected to occur with a frequency greater than 10−2/plant-year during the plant’s life, either include single or multiple reactor modules. The F-C Target for high-frequency AOOs until 10−1/plant-year are based on an iso-risk profile defined by annual exposure limits of 10 CFR 20 [49], in other words, 100 mrem/plant-year. The frequencies between 10−1/plant-year and 10−2/plant-year, the F-C Target is set at a reference value of 1 rem by considering the Environmental Protection Agency (EPA) Protective Action Guide (PAG) limits [50].
- DBEs are expected to occur between the frequencies 10−2/plant-year and 10−4/plant-year, meaning the less frequent events. The F-C Target for this part is 1 rem at 10−2/plant-year with 25 rem at 10−4/plant-year with the dose calculated at the Exclusion Area Boundary (EAB) for the 30 days following the release.
- BDBE frequency is less than 10−4/plant-year with the upper limit 5 × 10−7/plant-year, meaning that rare events can be excluded from the BDBE category. The F-C Target for this case is 25 rem at 10−4/plant-year with 750 rem at 5 × 10−7/plant-year to ensure that the QHO for early health effect does not exceed individual BDBEs.
- The frequency-dose evaluation line includes increasing and decreasing risk arrows to evaluate the risk significance of each LBE.
- The frequency-dose anchor points in the figure are used to define the shape of the curve. The lines between anchor points are straight lines on a log-log frequency-dose graph.
- Finally, the event sequences with frequencies less than 5 × 10−7/plant-year are kept in the PRA results to confirm no cliff-edge effects.
- The plant initiating event and event sequences are associated with the design and site.
- The response of the design and its structures, systems, and components (SSC) to initiating events and event sequence.
- Margins provided by the facility’s response regarding prevention and mitigation of radiological releases.
- Adequacy of the defense-in-depth (DID) philosophy.
6. Overview of Current Probabilistic Risk Assessment Standard for Non-Light Water Reactor (Non-LWR) Nuclear Power Plants
- Coexisting hazard: a hazard that is secondary to and/or concurrent with another hazard.
- Concurrent hazard: a hazard that co-occurs with the occurrence of another hazard resulting from a common cause (e.g., high winds concurrent with storm surge event caused by a hurricane or a moderate wind event concurrent with a significant rainfall event).
- Primary hazard: Hazards that are not the consequence of other preceding hazards.
- Secondary hazard: It is used in connection with, and in contrast to, a primary hazard. It is an additional hazard effect that is induced by the primary hazard.
7. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- Udalova, A.A. Nonpower applications of nuclear technology. In Nuclear Reactor Technology Development and Utilization; SKhan, U.-D., Nakhabov, A., Eds.; Woodhead Publishing: Cambridge, UK, 2020; pp. 319–341. [Google Scholar] [CrossRef]
- Wu, J.; Ma, Y.; Yu, C.; Zou, C.; Cai, X.; Chen, J. Nuclear non-proliferation review and improving proliferation resistance assessment in the future. Int. J. Energy Res. 2021, 45, 11399–11422. [Google Scholar] [CrossRef]
- Sehgal, B.R. Light water reactor (LWR) safety. Nucl. Eng. Technol. 2006, 38, 697–732. [Google Scholar]
- Security Aspects of Nuclear Facilities|IAEA. Available online: https://www.iaea.org/topics/security-aspects (accessed on 21 February 2021).
- Nuclear Regulatory Commission. Available online: https://www.nrc.gov/ (accessed on 6 June 2021).
- U.S. Nuclear Regulatory Commission. The Reactor Safety Study-The Introduction of Risk Assessment to the Regulation of Nuclear Reactors; WASH-1400, NUREG/KM-0010; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 2016; p. 60.
- Apostolakis, G. The concept of probability in safety assessments of technological systems. Science 1990, 250, 1359–1364. [Google Scholar] [CrossRef] [PubMed] [Green Version]
- Kaplan, S.; Garrick, B.J. On the quantitative definition of risk. Risk Anal. 1981, 1, 11–27. [Google Scholar] [CrossRef]
- Gilbertson, A. An approach for using probabilistic risk assessment in risk-informed decisions on plant-specific changes to the licensing basis. In U.S. Nuclear Regulatory Commission, Regulatory Guide 1.174, Revision 3; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 2018. [Google Scholar]
- An approach for determining the technical adequacy of probabilistic risk assessment results for risk-informed activities. U.S. Nuclear Regulatory Commission, Regulatory Guide 1.200, Revision 2; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 2009.
- PRAProcedures Guide: A Guide to The Performance of Probabilistic Risk Assessments for Nuclear Power Plants (NU-REG/CR-2300)|NRC.gov. Available online: https://www.nrc.gov/reading-rm/doc-collections/nuregs/contract/cr2300/index.html (accessed on 31 August 2021).
- Electric Power Research Institute. Basics of Nuclear Power Plant Probabilistic Risk Assessment. presented at the Fire PRA Workshop, San Diego, CA, USA and Jacksonville, FL, USA. 2011. [Google Scholar]
- Advances in Small Modular Reactor Technology Developments. A supplement to: IAEA Advanced Reactors Information System (ARIS); International Atomic Energy Agency: Vienna, Austria, 2020. [Google Scholar]
- Hussein, E.M. Emerging small modular nuclear power reactors: A critical review. Phys. Open 2020, 5, 100038. [Google Scholar] [CrossRef]
- Moe, W.L.; Afzali, A. Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors Selection and Evaluation of Licensing Basis Events; INL/EXT-19-55513-Rev000; Idaho National Lab. (INL): Idaho Falls, ID, USA, 2019. [Google Scholar] [CrossRef]
- Probabilistic Risk Assessment Standard for Advanced Non-LWR Nuclear Power Plants; ASME/ANS RA-S-1.4-2021; ASME: New York, NY, USA, 2021.
- Treatment of External Hazards in Probabilistic Safety Assessment for Nuclear Power Plants: A Safety Practice; International Atomic Energy Agency: Vienna, Austria, 1995. Available online: https://www.iaea.org/publications/5178/treatment-of-external-hazards-in-probabilistic-safety-assessment-for-nuclear-power-plants-a-safety-practice (accessed on 22 July 2021).
- Knochenhauer, M.; Louko, P. Guidance for external events analysis. In Probabilistic Safety Assessment and Management; Spitzer, C., Schmocker, U., Dang, V.N., Eds.; Springer: London, UK, 2004; pp. 1498–1503. [Google Scholar] [CrossRef]
- U.S. Nuclear Regulatory Commission. Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities (NUREG-1407); U.S. Nuclear Regulatory Commission: Washington, DC, USA, 1991; p. 98.
- Kimura, C.Y.; Prassinos, P.G. Evaluation of External Hazards to Nuclear Power Plants in the United States: Other External Events; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 1989. Available online: http://inis.iaea.org/search/search.aspx?orig_q=RN:20045139 (accessed on 22 July 2021).
- External Man-Induced Events in Relation to Nuclear Power Plant Design: A Safety Guide; International Atomic Energy Agency: Vienna, Austria, 1996. Available online: https://www.iaea.org/publications/5184/external-man-induced-events-in-relation-to-nuclear-power-plant-design-a-safety-guide (accessed on 22 July 2021).
- Final Safety Evaluation Report Related to Certification of the AP1000 Standard Design (NUREG-1793, Initial Report)|NRC.gov. Available online: https://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1793/initial/index.html#pub-info (accessed on 23 August 2021).
- Choi, E.; Ha, J.-G.; Hahm, D.; Kim, M.K. A review of multihazard risk assessment: Progress, potential, and challenges in the application to nuclear power plants. Int. J. Disaster Risk Reduct. 2021, 53, 101933. [Google Scholar] [CrossRef]
- Great East Japan Earthquake. Available online: https://www.who.int/westernpacific/emergencies/great-east-japan-earthquake (accessed on 6 January 2021).
- International Nuclear and Radiological Event Scale (INES)|IAEA. Available online: https://www.iaea.org/resources/databases/international-nuclear-and-radiological-event-scale (accessed on 11 June 2021).
- Wang, J.; He, Z.; Weng, W. A review of the research into the relations between hazards in multi-hazard risk analysis. Nat. Hazards 2020, 104, 2003–2026. [Google Scholar] [CrossRef]
- Kappes, M.S.; Keiler, M.; von Elverfeldt, K.; Glade, T. Challenges of analyzing multi-hazard risk: A review. Nat. Hazards 2012, 64, 1925–1958. [Google Scholar] [CrossRef] [Green Version]
- Kim, J.H.; Kim, M.K.; Choi, I.-K. Preliminary study on the quantification of component level failure frequency by multi-hazard. In Proceedings of the KNS 2017 Fall Meeting, Charlotte, NC, USA, 4–9 August 2019; p. 6. [Google Scholar]
- Yu, Y.; Lv, X.; Niu, F. Large LOCA accident analysis for AP1000 under earthquake. Ann. Nucl. Energy 2015, 77, 142–147. [Google Scholar] [CrossRef]
- Prošek, A.; Wielenberg, A.; Löffler, H.; Raimond, E. Methodology for selecting initiating events and hazards for consideration in an extended PSA. In Safety and Reliability—Theory and Applications; Tatras Mountains, Tatranské Matliare, Slovak Republic, Ed.; CRC Press: Boca Raton, FL, USA, 2017; p. 490. [Google Scholar] [CrossRef]
- Daniell, J.; Schaefer, A.; Wenzel, F.; Hacker, E. Review of State-of-the Art for Hazard and Multi-Hazard Characterization; European Commission: Brussels, Belgium, 2019. [Google Scholar]
- Home|NARSIS. Available online: http://www.narsis.eu/ (accessed on 23 July 2021).
- Kwag, S.; Hahm, D. Development of an earthquake-induced landslide risk assessment approach for nuclear power plants. Nucl. Eng. Technol. 2018, 50, 1372–1386. [Google Scholar] [CrossRef]
- Kwag, S.; Gupta, A. Probabilistic risk assessment framework for structural systems under multiple hazards using Bayesian statistics. Nucl. Eng. Des. 2017, 315, 20–34. [Google Scholar] [CrossRef]
- Li, H.; Apostolakis, G.E.; Gifun, J.; VanSchalkwyk, W.; Leite, S.; Barber, D. Ranking the risks from multiple hazards in a small community. Risk Anal. 2009, 29, 438–456. [Google Scholar] [CrossRef] [PubMed] [Green Version]
- Cooper, S.E.; Xing, J.; Chang, Y.J. What HRA needs to support site-wide, multi-hazard Level 2-PRA. In Proceedings of the ANS PSA 2013 International Meeting on Probabilistic Safety Assessment and Analysis, Columbia, SC, USA, 22–26 September 2013. [Google Scholar]
- Choine, M.N.; O’Connor, A.; Gehl, P.; D’Ayala, D.; García-Fernández, M.; Jiménez, M.-J.; Gavin, K.; Van Gelder, P.; Salceda, T.; Power, R. A multi hazard risk assessment methodology accounting for cascading hazard events. In Proceedings of the 12th International Conference on Applications of Statistics and Probability in Civil Engineering, Vancouver, Canada, 12–15 July 2015; p. 8. [Google Scholar]
- Ming, X.; Xu, W.; Li, Y.; Du, J.; Liu, B.; Shi, P. Quantitative multi-hazard risk assessment with vulnerability surface and hazard joint return period. Stoch. Environ. Res. Risk Assess. 2015, 29, 35–44. [Google Scholar] [CrossRef]
- He, Z.; Weng, W. A risk assessment method for multi-hazard coupling disasters. Risk Anal. 2020, 41, 1362–1375. [Google Scholar] [CrossRef] [PubMed]
- Kwag, S.; Ha, J.G.; Kim, M.K.; Kim, J.H. Development of efficient external multi-hazard risk quantification methodology for nuclear facilities. Energies 2019, 12, 3925. [Google Scholar] [CrossRef] [Green Version]
- Seismic Probabilistic Risk Assessment Implementation Guide; EPRI: Palo Alto, CA, USA, 2013.
- Watanabe, Y.; Oikawa, T.; Muramatsu, K. Development of the DQFM method to consider the effect of correlation of component failures in seismic PSA of nuclear power plant. Reliab. Eng. Syst. Saf. 2003, 79, 265–279. [Google Scholar] [CrossRef]
- Ebisawa, K.; Abe, K.; Muramatsu, K.; Itoh, M.; Kohno, K.; Tanaka, T. Evaluation of response factors for seismic probabilistic safety assessment of nuclear power plants. Nucl. Eng. Des. 1994, 147, 197–210. [Google Scholar] [CrossRef]
- Bani-Mustafa, T.; Zeng, Z.; Zio, E.; Vasseur, D. A new framework for multi-hazards risk aggregation. Saf. Sci. 2020, 121, 283–302. [Google Scholar] [CrossRef]
- Dezert, J.; Tacnet, J.-M.; Batton-Hubert, M.; Smarandache, F. Multi-criteria decision making based on DSmT-AHP. In Proceedings of the ELIEF 2010: Workshop on the Theory of Belief Functions, Brest, France, 1–2 April 2010; p. 9. [Google Scholar]
- Appendix A to Part 50—General Design Criteria for Nuclear Power Plants|NRC.gov. Available online: https://www.nrc.gov/reading-rm/doc-collections/cfr/part050/part050-appa.html (accessed on 30 September 2021).
- U.S. Nuclear Regulatory Commission. Guidance for Developing Principal Design Criteria for Non-Light-Water Reactors; Idaho National Lab. (INL): Idaho Falls, ID, USA, 2015.
- Oh, K.M.; Ahn, S.K.; Jo, N.C.; Yoon, W.H.; Chung, D.W.; Lee, H.J. Comparison of Frequency-Consequence (F-C) curves or criteria in foreign countries. In Proceedings of the Transactions of the Korean Nuclear Society Autumn Meeting, PyeongChang, Korea, 25–26 October 2007; pp. 593–594. [Google Scholar]
- PART 20—Standards FOR Protection against Radiation. Available online: https://www.nrc.gov/reading-rm/doc-collections/cfr/part020/index.html (accessed on 5 August 2021).
- Protective Action Guides (PAGs)|US EPA. Available online: https://www.epa.gov/radiation/protective-action-guides-pags (accessed on 5 August 2021).
- Moe, W.L. NEI 18-04 Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development; INL/EXT-19-55375-Rev000; Idaho National Lab. (INL): Idaho Falls, ID, USA, 2019. [CrossRef]
- Sandia National Laboratories and, U.S. Nuclear Regulatory Commission. Handbook of Parameter Estimation for Probabilistic Risk Assessment; NUREG/CR-6823; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 2003.
- Idaho National Engineering and Environmental Laboratory. Rates of Initiating Events at U.S. Nuclear Power Plants 1987–1995; UREG/CR-5750; U.S. Nuclear Regulatory Commission: Washington, DC, USA, 1999. Available online: https://www.nrc.gov/docs/ML0705/ML070580080.pdf (accessed on 24 July 2021).
- IAEA. Technical Approach to Probabilistic Safety Assessment for Multiple Reactor Units; International Atomic Energy Agency: Vienna, Austria, 2019; Available online: https://www.iaea.org/publications/12228/technical-approach-to-probabilistic-safety-assessment-for-multiple-reactor-units (accessed on 22 July 2021).
- PRIS-Home. Available online: https://pris.iaea.org/PRIS/home.aspx (accessed on 21 February 2021).
Categories | Details | |
---|---|---|
Number of events and hazards | Number of events | Single event: one event and one hazard Multi-event: two or more events, including secondary event |
Number of hazards | Single hazard: one hazard (it may be caused even by multi-event) Multi-hazard: two or more hazards (it may be caused even by a single event) | |
Order of event | Independent event [Independent] | Two or more events that are independent of each other |
Simultaneous event [Concurrent] | Two or more events caused by a single source | |
Sequential event [Successive] | Occurred by secondary event |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Aras, E.M.; Diaconeasa, M.A. A Critical Look at the Need for Performing Multi-Hazard Probabilistic Risk Assessment for Nuclear Power Plants. Eng 2021, 2, 454-467. https://doi.org/10.3390/eng2040028
Aras EM, Diaconeasa MA. A Critical Look at the Need for Performing Multi-Hazard Probabilistic Risk Assessment for Nuclear Power Plants. Eng. 2021; 2(4):454-467. https://doi.org/10.3390/eng2040028
Chicago/Turabian StyleAras, Egemen M., and Mihai A. Diaconeasa. 2021. "A Critical Look at the Need for Performing Multi-Hazard Probabilistic Risk Assessment for Nuclear Power Plants" Eng 2, no. 4: 454-467. https://doi.org/10.3390/eng2040028