RETRACTED: Cao et al. Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197
Reference
- Cao, W.; Peng, R.; Li, C.; Li, M. RETRACTED: Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Share and Cite
Cao, W.; Peng, R.; Li, C.; Li, M. RETRACTED: Cao et al. Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197. Processes 2026, 14, 1313. https://doi.org/10.3390/pr14081313
Cao W, Peng R, Li C, Li M. RETRACTED: Cao et al. Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197. Processes. 2026; 14(8):1313. https://doi.org/10.3390/pr14081313
Chicago/Turabian StyleCao, Wengang, Runkang Peng, Cuiruikai Li, and Meimei Li. 2026. "RETRACTED: Cao et al. Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197" Processes 14, no. 8: 1313. https://doi.org/10.3390/pr14081313
APA StyleCao, W., Peng, R., Li, C., & Li, M. (2026). RETRACTED: Cao et al. Energy-Efficient Distributed Welding Shop Scheduling Based on Multi-Objective Seagull Algorithm. Processes 2025, 13, 197. Processes, 14(8), 1313. https://doi.org/10.3390/pr14081313
