Next Article in Journal
On the Optimal Control of a Malware Propagation Model
Next Article in Special Issue
Two-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work
Previous Article in Journal
Fuzzy Set Models for Economic Resilience Estimation
 
 

Order Article Reprints

Journal: Mathematics, 2020
Volume: 8
Number: 1517

Article: Two-Agent Preemptive Pareto-Scheduling to Minimize Late Work and Other Criteria
Authors: by Ruyan He and Jinjiang Yuan
Link: https://www.mdpi.com/2227-7390/8/9/1517

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Quote and Order Details

Contact Person

Invoice Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop