Evaluating Impact of Automated Work Site Speed Enforcement Using Connected Vehicle Data
Abstract
1. Introduction
1.1. Paper Objective
1.2. Background on Indiana’s Pilot Program Deployment
1.3. Placement of Advance Warning Signs in Advance of SSC
2. Materials and Methods
2.1. Data Description
2.1.1. Connected Vehicle Data
2.1.2. Deployment Logs
2.1.3. Fixed Panel Advance Warning Signs
2.2. Study Location
2.3. Summary of SSC Deployments
- The I-70 worksite (Figure 3, location A) was the first deployment with a pre-enforcement period from 14 August 2024 to 20 December 2024 in both directions of travel (eastbound and westbound).
- The I-465 deployments (Figure 3, Location C) were deployed in both directions of travel (clockwise Inner Loop and counterclockwise Outer Loop) and assessed from 15 January 2025 through 11 July 2025.
- The most recent worksite I-65 deployments were in the southbound direction of travel and assessed from 7 July 2025 [31] through 11 July 2025.
2.4. I-70 EB Worksite Configuration and Segment Definitions
2.5. Methodology for Processing CV Data
3. Results
3.1. Evaluating Speed Compliance over Hours of Active SSC
3.1.1. Longitudinal Trends in Speed Compliance at Sign and Unit Locations
3.1.2. Longitudinal Trends in Speed Compliance for Entire Worksite
3.2. Evaluating Speed Compliance over All 24 Hours for Both Cars and Commercial Trucks
4. Discussion
| Route | Analysis Period | 12 AM–6 AM | 6 AM–10 AM | 10 AM–2 PM | 2 PM–6 PM | 6 PM–12 AM | Days with Active SSC |
|---|---|---|---|---|---|---|---|
| I-70 E | 22 July 2024–22 December 2024 | −4.5 | −15.1 | −9.6 | −14.7 | −5.5 | 78 |
| I-70 W | 22 July 2024–22 December 2024 | −22.4 | −26.8 | −18.5 | −14.4 | −16.1 | 77 |
| I-69 S | 9 December 2024–13 July 2025 | −12.1 | −67.4 | −61.8 | −56.3 | −9.9 | 98 |
| I-465 IL | 9 December 2024–13 July 2025 | −16.7 | −53.5 | −56.3 | −57.7 | −21.6 | 93 |
| I-465 OL | 9 December 2024–13 July 2025 | −6.2 | −16.7 | −21.8 | −22.2 | −3.7 | 92 |
| I-65 S | 28 April 2025–13 July 2025 | −22.5 | −26.8 | −41.1 | −36.5 | −24.1 | 5 |
| Route | Analysis Period | 12 AM–6 AM | 6 AM–10 AM | 10 AM–2 PM | 2 PM–6 PM | 6 PM–12 AM | Days with Active SSC |
|---|---|---|---|---|---|---|---|
| I-70 E | 22 July 2024–22 December 2024 | −23.2 | −26.7 | −14.4 | −26.5 | −16.5 | 78 |
| I-70 W | 22 July 2024–22 December 2024 | −42.4 | −24.9 | −32.6 | −23.5 | −21.8 | 77 |
| I-69 S | 9 December 2024–13 July 2025 | −11.8 | −82.4 | −71.0 | −48.2 | 0.1 | 98 |
| I-465 IL | 9 December 2024–13 July 2025 | −21.4 | −69.1 | −65.6 | −56.6 | −27.0 | 93 |
| I-465 OL | 9 December 2024–13 July 2025 | −8.5 | −47.3 | −30.1 | −24.1 | −1.6 | 92 |
| I-65 S | 28 April 2025–13 July 2025 | −30.6 | −41.7 | −32.3 | −20.5 | −26.1 | 5 |
5. Conclusions
- Speed compliance gradually increased longitudinally from the location of the first fixed advance warning sign until the SSC unit’s location. This documents the impact of advance warning signs on speed reduction.
- The analysis found a 34% reduction on average in the percentage of passenger vehicle speeds exceeding the worksite speed limit by 11 mph or more on weekdays between 6 AM and 6 PM (Table 2).
- For commercial trucks, there was a 41% reduction on average between 6 AM and 6 PM across the four study sites (Table 3).
- There were no deployments on any of the worksites from 12 AM to 6 AM or from 6 PM to 12 AM. Even so, there are clearly substantive impacts on the speeds even in periods where there is no visible SSC. For example, when looking at the I-465 Inner Loop, the 10 AM–2 PM time period observed 56% to 66% reductions in the percentage of speeds 11 mph or greater than the WS speed limit for passenger vehicles and commercial trucks, respectively, the 6 PM–12 AM hours still witnessed a 22% to 27% reduction in the percentage of speeds 11 mph or greater than the WS speed limit (Table 2 and Table 3)
- There was a significant increase in speed reductions when the Pilot Program moved from a pre-enforcement period to mailing warnings over the course of the past 13 months, as evidenced by the increasing percentage reductions seen in Table 2 and Table 3 from the I-70 E worksite to the most recent I-65 S worksite.
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Acknowledgments
Conflicts of Interest
Abbreviations
| CV | Connected Vehicle |
| DL | Deployment Log |
| FHWA | Federal Highway Administration |
| HEA | House Enrolled Act |
| IL | Inner Loop |
| INDOT | Indiana Department of Transportation |
| MM | Mile Marker |
| OALP | Office of Administrative Law Proceedings |
| OL | Outer Loop |
| PV | Program Vendor |
| SSC | Speed Safety Cameras |
| WSCS | Worksite Speed Control System |
| WS | Worksite |
References
- FHWA Work Zone Facts and Statistics—FHWA Office of Operations. Available online: https://ops.fhwa.dot.gov/wz/resources/facts_stats.htm#ftnref5 (accessed on 21 July 2025).
- Fatality and Injury Reporting System Tool (FIRST). Available online: https://cdan.dot.gov/query (accessed on 21 July 2025).
- Li, Y.; Bai, Y. Highway Work Zone Risk Factors and Their Impact on Crash Severity. J. Transp. Eng. 2009, 135, 694–701. [Google Scholar] [CrossRef]
- Mohammed, H.J.; Chang, Y.I.; Schrock, S.D. Factors Associated with Work Zone Crashes. Transp. Res. Rec. 2023, 2677, 224–235. [Google Scholar] [CrossRef]
- INDOT Work Zone Safety. Available online: https://www.in.gov/indot/safety/work-zone-safety/ (accessed on 21 July 2025).
- Nnaji, C.; Gambatese, J.; Lee, H.W.; Zhang, F. Improving Construction Work Zone Safety Using Technology: A Systematic Review of Applicable Technologies. J. Traffic Transp. Eng. 2020, 7, 61–75. [Google Scholar] [CrossRef]
- Ravani, B.; Wang, C. Speeding in Highway Work Zone: An Evaluation of Methods of Speed Control. Accid. Anal. Prev. 2018, 113, 202–212. [Google Scholar] [CrossRef] [PubMed]
- Brewer, M.A.; Pesti, G.; SchneiderIV, W. Improving Compliance with Work Zone Speed Limits: Effectiveness of Selected Devices. Transp. Res. Rec. 2006, 1948, 67–76. [Google Scholar] [CrossRef]
- LIN, P.-W.; KANG, K.-P.; CHANG, G.-L. Exploring the Effectiveness of Variable Speed Limit Controls on Highway Work-Zone Operations. J. Intell. Transp. Syst. 2004, 8, 155–168. [Google Scholar] [CrossRef]
- Woo, T.H.; Ho, S.-M.; Chen, H.-L. Monitoring Displays Coupled with Speed Cameras: Effectiveness on Speed Reduction. Transp. Res. Rec. 2007, 2009, 30–36. [Google Scholar] [CrossRef]
- Soole, D.W.; Watson, B.C.; Fleiter, J.J. Effects of Average Speed Enforcement on Speed Compliance and Crashes: A Review of the Literature. Accid. Anal. Prev. 2013, 54, 46–56. [Google Scholar] [CrossRef] [PubMed]
- Speed Safety Cameras|FHWA. Available online: https://highways.dot.gov/safety/proven-safety-countermeasures/speed-safety-cameras (accessed on 21 July 2025).
- Speed Safety Cameras (SSC) Transportation Research Synthesis|MnDOT Digital Library. Available online: https://mdl.mndot.gov/items/TRS2303 (accessed on 21 July 2025).
- Benekohal, R.F.; Chitturi, M.V.; Hajbabaie, A.; Wang, M.-H.; Medina, J.C. Automated Speed Photo Enforcement Effects on Speeds in Work Zones. Transp. Res. Rec. 2008, 2055, 11–20. [Google Scholar] [CrossRef]
- Medina, J.C.; Benekohal, R.F.; Hajbabaie, A.; Wang, M.-H.; Chitturi, M.V. Downstream Effects of Speed Photo–Radar Enforcement and Other Speed Reduction Treatments on Work Zones. Transp. Res. Rec. 2009, 2107, 24–33. [Google Scholar] [CrossRef]
- Freedman, M.; De Leonardis, D.; Raisman, G.; InyoSwan, D.; Davis, A.; Levi, S.; Rogers, I.; Bergeron, E. Demonstration of Automated Speed Enforcement in School Zones in Portland, Oregon. Available online: https://rosap.ntl.bts.gov (accessed on 5 November 2025).
- Tilahun, N. Safety Impact of Automated Speed Camera Enforcement: Empirical Findings Based on Chicago’s Speed Cameras. Transp. Res. Rec. 2023, 2677, 1490–1498. [Google Scholar] [CrossRef]
- Guerra, E.; Puchalsky, C.; Kovalova, N.; Hu, Y.; Si, Q.; Tan, J.; Zhao, G. Evaluating the Effectiveness of Speed Cameras on Philadelphia’s Roosevelt Boulevard. Transp. Res. Rec. 2024, 2678, 452–461. [Google Scholar] [CrossRef]
- Shakir Mahmud, M.; Jashami, H.; Usamah Megat Johari, M.; Gupta, N.; Bamney, A.; Gates, T.J.; Savolainen, P. Effects of Speed Feedback Trailer Positioning and Police Enforcement on Vehicular Speeds in Freeway Work Zone Lane Closures. Transp. Res. Rec. 2024, 2678, 423–434. [Google Scholar] [CrossRef]
- Mathew, J.K.; Desai, J.; Li, H.; Bullock, D.M. Using Anonymous Connected Vehicle Data to Evaluate Impact of Speed Feedback Displays, Speed Limit Signs and Roadway Features on Interstate Work Zones Speeds. J. Transp. Technol. 2021, 11, 545–560. [Google Scholar] [CrossRef]
- Sakhare, R.S.; Desai, J.C.; Mahlberg, J.; Mathew, J.K.; Kim, W.; Li, H.; McGregor, J.D.; Bullock, D.M. Evaluation of the Impact of Queue Trucks with Navigation Alerts Using Connected Vehicle Data. J. Transp. Technol. 2021, 11, 561–576. [Google Scholar] [CrossRef]
- Mekker, M.M.; Lin, Y.-J.; Elbahnasawy, M.K.I.; Shamseldin, T.S.A.; Li, H.; Habib, A.F.; Bullock, D.M. Application of LiDAR and Connected Vehicle Data to Evaluate the Impact of Work Zone Geometry on Freeway Traffic Operations. Transp. Res. Rec. 2018, 2672, 1–13. [Google Scholar] [CrossRef]
- Day, C.M.; Okaidjah, D.; Knickerbocker, S.; Iowa State University Institute for Transportation. Usefulness and Reliability of Probe Data When Alerting Work Zone Message Signs; Iowa State University: Ames, IA, USA, 2024. [Google Scholar]
- Mathew, J.K.; Li, H.; Landvater, H.; Bullock, D.M. Using Connected Vehicle Trajectory Data to Evaluate the Impact of Automated Work Zone Speed Enforcement. Sensors 2022, 22, 2885. [Google Scholar] [CrossRef] [PubMed]
- SafeZonesIN|Indiana Safe Zones Program. Available online: https://www.safezonesin.com (accessed on 14 July 2025).
- Sakhare, R.S.; Hunter, M.; Mukai, J.; Li, H.; Bullock, D.M. Truck and Passenger Car Connected Vehicle Penetration on Indiana Roadways. JTTs 2022, 12, 578–599. [Google Scholar] [CrossRef]
- Kandiboina, R.; Knickerbocker, S.; Bhagat, S.; Hawkins, N.; Sharma, A. Exploring the Efficacy of Large-Scale Connected Vehicle Data in Real-Time Traffic Applications. Transp. Res. Rec. 2024, 2678, 651–665. [Google Scholar] [CrossRef]
- Dimitrijevic, B.; Zhong, Z.; Zhao, L.; Besenski, D.; Lee, J. Assessing Connected Vehicle Data Coverage on New Jersey Roadways. In Proceedings of the 2022 IEEE 7th International Conference on Intelligent Transportation Engineering (ICITE), Beijing, China, 11–13 November 2022; pp. 388–393. [Google Scholar]
- Sakhare, R.S.; Desai, J.; Mathew, J.K.; Bullock, D.M. Assessing the Interstate Coverage of Commercial Trucks Capable of Providing Roadway Imagery via On-Vehicle Dash Camera in the United States. IEEE Access 2024, 12, 173517–173529. [Google Scholar] [CrossRef]
- Craig, B. Safe Zones Pilot Program Moving to Clear Path Project in 2025. In Clear Path 465; 2024; Available online: https://clearpath465.com/safe-zones-in-2025/ (accessed on 21 July 2025).
- INDOT Announces Expansion of Worksite Speed Control Pilot. Available online: https://www.safezonesin.com/copy-of-press-release-4 (accessed on 21 July 2025).
- Press Releases. Available online: https://www.safezonesin.com/press-releases (accessed on 21 July 2025).
- Resources. Available online: https://www.safezonesin.com/resources (accessed on 4 November 2025).












| Worksite | Month/Year | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 08/24 | 09/24 | 10/24 | 11/24 | 12/24 | 01/25 | 02/25 | 03/25 | 04/25 | 05/25 | 06/25 | 07/25 | |
| I70 | P | P | P | P | P | |||||||
| I69 | P | P | P | P | MW | MW | MW | |||||
| I465 | P | P | P | P | MW | MW | MW | |||||
| I65 | MW | |||||||||||
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2025 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Desai, J.; Sakhare, R.S.; McGregor, J.; Snyder, B.; Bullock, D.M. Evaluating Impact of Automated Work Site Speed Enforcement Using Connected Vehicle Data. Appl. Sci. 2025, 15, 12140. https://doi.org/10.3390/app152212140
Desai J, Sakhare RS, McGregor J, Snyder B, Bullock DM. Evaluating Impact of Automated Work Site Speed Enforcement Using Connected Vehicle Data. Applied Sciences. 2025; 15(22):12140. https://doi.org/10.3390/app152212140
Chicago/Turabian StyleDesai, Jairaj, Rahul Suryakant Sakhare, John McGregor, Benjamin Snyder, and Darcy M. Bullock. 2025. "Evaluating Impact of Automated Work Site Speed Enforcement Using Connected Vehicle Data" Applied Sciences 15, no. 22: 12140. https://doi.org/10.3390/app152212140
APA StyleDesai, J., Sakhare, R. S., McGregor, J., Snyder, B., & Bullock, D. M. (2025). Evaluating Impact of Automated Work Site Speed Enforcement Using Connected Vehicle Data. Applied Sciences, 15(22), 12140. https://doi.org/10.3390/app152212140