Lee, T.; Lee, J.; Kim, J.; Choi, H.; Lee, D.-E.
Effect of Formwork Removal Time Reduction on Construction Productivity Improvement by Mix Design of Early Strength Concrete. Appl. Sci. 2020, 10, 7046.
https://doi.org/10.3390/app10207046
AMA Style
Lee T, Lee J, Kim J, Choi H, Lee D-E.
Effect of Formwork Removal Time Reduction on Construction Productivity Improvement by Mix Design of Early Strength Concrete. Applied Sciences. 2020; 10(20):7046.
https://doi.org/10.3390/app10207046
Chicago/Turabian Style
Lee, Taegyu, Jaehyun Lee, Jinsung Kim, Hyeonggil Choi, and Dong-Eun Lee.
2020. "Effect of Formwork Removal Time Reduction on Construction Productivity Improvement by Mix Design of Early Strength Concrete" Applied Sciences 10, no. 20: 7046.
https://doi.org/10.3390/app10207046
APA Style
Lee, T., Lee, J., Kim, J., Choi, H., & Lee, D.-E.
(2020). Effect of Formwork Removal Time Reduction on Construction Productivity Improvement by Mix Design of Early Strength Concrete. Applied Sciences, 10(20), 7046.
https://doi.org/10.3390/app10207046