Zhou, D.; Chen, L.; Wei, G.; Zhang, J.; Guo, P.; Wang, H.; Zhao, J.; Huang, W.
Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study. Buildings 2024, 14, 3498.
https://doi.org/10.3390/buildings14113498
AMA Style
Zhou D, Chen L, Wei G, Zhang J, Guo P, Wang H, Zhao J, Huang W.
Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study. Buildings. 2024; 14(11):3498.
https://doi.org/10.3390/buildings14113498
Chicago/Turabian Style
Zhou, Ding, Longbao Chen, Guohua Wei, Jiahui Zhang, Pengxiang Guo, Huigang Wang, Junpeng Zhao, and Weijia Huang.
2024. "Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study" Buildings 14, no. 11: 3498.
https://doi.org/10.3390/buildings14113498
APA Style
Zhou, D., Chen, L., Wei, G., Zhang, J., Guo, P., Wang, H., Zhao, J., & Huang, W.
(2024). Technology Gap Analysis on the BIM-Enabled Design Process of Prefabricated Buildings: An Autoethnographic Study. Buildings, 14(11), 3498.
https://doi.org/10.3390/buildings14113498