Next Article in Journal
Understanding Architectural Designers’ Continuous Use Intention Regarding BIM Technology: A China Case
Next Article in Special Issue
Developing a Scoring System to Evaluate the Level of Smartness in Commercial Buildings: A Case of Sri Lanka
Previous Article in Journal
Adaptation Strategies of Residential Buildings Based on a Health Risk Evaluation—A Case Study of Townhouses in Taiwan
Previous Article in Special Issue
Barriers to Adopting Lean Construction in the Construction Industry—The Case of Jordan
 
 

Order Article Reprints

Journal: Buildings, 2021
Volume: 11
Number: 447

Article: Comparing Team Interactions in Traditional and BIM-Lean Design Management
Authors: by Rodrigo F. Herrera, Claudio Mourgues, Luis F. Alarcón and Eugenio Pellicer
Link: https://www.mdpi.com/2075-5309/11/10/447

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop