Xia, N.; Lu, Z.; Zhang, Y.; Fu, J.
Integrated Production, EWMA Scheme, and Maintenance Policy for Imperfect Manufacturing Systems of Bolt-On Vibroseis Equipment Considering Quality and Inventory Constraints. Axioms 2025, 14, 703.
https://doi.org/10.3390/axioms14090703
AMA Style
Xia N, Lu Z, Zhang Y, Fu J.
Integrated Production, EWMA Scheme, and Maintenance Policy for Imperfect Manufacturing Systems of Bolt-On Vibroseis Equipment Considering Quality and Inventory Constraints. Axioms. 2025; 14(9):703.
https://doi.org/10.3390/axioms14090703
Chicago/Turabian Style
Xia, Nuan, Zilin Lu, Yuting Zhang, and Jundong Fu.
2025. "Integrated Production, EWMA Scheme, and Maintenance Policy for Imperfect Manufacturing Systems of Bolt-On Vibroseis Equipment Considering Quality and Inventory Constraints" Axioms 14, no. 9: 703.
https://doi.org/10.3390/axioms14090703
APA Style
Xia, N., Lu, Z., Zhang, Y., & Fu, J.
(2025). Integrated Production, EWMA Scheme, and Maintenance Policy for Imperfect Manufacturing Systems of Bolt-On Vibroseis Equipment Considering Quality and Inventory Constraints. Axioms, 14(9), 703.
https://doi.org/10.3390/axioms14090703