Maroušek, L.;                     Dollinger, S.;                     Elmer, S.;                     Öfner, W.;                     Nussbacher, H.;                     Melcher, F.;                     Flachberger, H.    
        Re-Mining of Waste Rock Dumps from a Closed Lead–Zinc Mine—Characterisation of the Residuals. Minerals 2023, 13, 361.
    https://doi.org/10.3390/min13030361
    AMA Style
    
                                Maroušek L,                                 Dollinger S,                                 Elmer S,                                 Öfner W,                                 Nussbacher H,                                 Melcher F,                                 Flachberger H.        
                Re-Mining of Waste Rock Dumps from a Closed Lead–Zinc Mine—Characterisation of the Residuals. Minerals. 2023; 13(3):361.
        https://doi.org/10.3390/min13030361
    
    Chicago/Turabian Style
    
                                Maroušek, Lukas,                                 Sabrina Dollinger,                                 Simone Elmer,                                 Wolfgang Öfner,                                 Hanspeter Nussbacher,                                 Frank Melcher,                                 and Helmut Flachberger.        
                2023. "Re-Mining of Waste Rock Dumps from a Closed Lead–Zinc Mine—Characterisation of the Residuals" Minerals 13, no. 3: 361.
        https://doi.org/10.3390/min13030361
    
    APA Style
    
                                Maroušek, L.,                                 Dollinger, S.,                                 Elmer, S.,                                 Öfner, W.,                                 Nussbacher, H.,                                 Melcher, F.,                                 & Flachberger, H.        
        
        (2023). Re-Mining of Waste Rock Dumps from a Closed Lead–Zinc Mine—Characterisation of the Residuals. Minerals, 13(3), 361.
        https://doi.org/10.3390/min13030361