Jiang, B.; Pan, L.; Qin, G.; Su, X.; Cai, F.; Liang, Y.
Development of an Integrated Water Resource Scheduling Model Based on Platform Plug-In: A Case Study of the Wudu Diversion and Irrigation Area, China. Water 2022, 14, 3671.
https://doi.org/10.3390/w14223671
AMA Style
Jiang B, Pan L, Qin G, Su X, Cai F, Liang Y.
Development of an Integrated Water Resource Scheduling Model Based on Platform Plug-In: A Case Study of the Wudu Diversion and Irrigation Area, China. Water. 2022; 14(22):3671.
https://doi.org/10.3390/w14223671
Chicago/Turabian Style
Jiang, Beihan, Long Pan, Genquan Qin, Xiaolin Su, Feng Cai, and Yue Liang.
2022. "Development of an Integrated Water Resource Scheduling Model Based on Platform Plug-In: A Case Study of the Wudu Diversion and Irrigation Area, China" Water 14, no. 22: 3671.
https://doi.org/10.3390/w14223671
APA Style
Jiang, B., Pan, L., Qin, G., Su, X., Cai, F., & Liang, Y.
(2022). Development of an Integrated Water Resource Scheduling Model Based on Platform Plug-In: A Case Study of the Wudu Diversion and Irrigation Area, China. Water, 14(22), 3671.
https://doi.org/10.3390/w14223671