Stakeholders’ Roles in the Delivery of Sustainable Housing Projects in Lagos State, Nigeria
Abstract
:1. Introduction
2. Literature Review
2.1. Construction Stakeholders
2.2. Influence of Stakeholders on Sustainable Project Delivery
2.3. Roles of Stakeholders in the Delivery of Sustainable Housing Projects
2.3.1. Contractor
2.3.2. Government
2.3.3. Developers
2.3.4. Architects
2.3.5. Structural Engineers
2.3.6. Quantity Surveyors
2.3.7. Project Managers
2.3.8. Electrical Engineers
2.3.9. Mechanical Engineers
2.3.10. Builders
2.3.11. Government Regulatory Agencies
3. Methodology
3.1. Study Population
3.2. Data Collection
3.3. Data Analysis
4. Results
4.1. Respondents’ General Information
4.1.1. Type of Organisation
4.1.2. Designation of Respondents
4.1.3. Years of Experience
4.1.4. Professional Membership
- Contractor’s roles
- Government’s roles
- Developers’ roles
- Contractor’s roles
- Role 1: “Taking the lead in achieving a sustainable society through advocacy and other steps.”
- Role 3: “Complying with sustainability laws in the operation of their firms.”
- Government’s roles
- Role 2: “Monitor project execution for compliance with agreed sustainability standards.”
- Role 8: “Providing relevant legislation promoting sustainable constructions.”
- Developers’ roles:
- Role 1: “Contributing sustainable ideas at the briefing stage.”
- Role 9: “Identifying and allocating risks associated with sustainable buildings.”
- Contractors’ roles
- Government’s role
- Developers’ roles
4.2. Discussion of Findings
4.3. Theoretical and Practical Implications of the Study
4.3.1. Theoretical Implications
4.3.2. Practical Implications
5. Conclusions
Author Contributions
Funding
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
References
- Jepsen, A.L.; Eskerod, P. Stakeholder analysis in projects—Challenges in using current guidelines in the real world. Int. J. Proj. Manag. 2009, 27, 335–343. [Google Scholar] [CrossRef] [Green Version]
- Shen, L.Y.; Song, S.C.; Hao, J.L.; Tam, V.W.Y. Collaboration among Project Participants towards Sustainable Construction—A Hong Kong Study. Open Constr. Build. Technol. J. 2008, 2, 59–68. [Google Scholar] [CrossRef] [Green Version]
- Vyas, S.; Ahmed, S.; Parashar, A. BEE (Bureau of energy efficiency) and Green Buildings. Int. J. Res. 2014, 1, 23–32. [Google Scholar]
- Beltrán, P.; Chaparro-González, F.; Pastor-Ferrando, J.-P.; Pla-Rubio, A. An AHP (Analytic Hierarchy Process)/ANP (AnalyticNetwork Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects. Energy 2017, 66, 222–238. [Google Scholar] [CrossRef]
- Olanipekun, A.O. Motivating Project Owners to Increase Their Commitment towards Improving the Delivery Performance of Green Building Projects. Ph.D. Thesis, Queensland University of Technology, Brisbane, Australia, 2017. [Google Scholar]
- Senaratne, S.; Hewamanage, P.R. The role of team leadership in achieving LEED certification in a green building project. Built Environ. Proj. Asset Manag. 2015, 5, 170–183. [Google Scholar] [CrossRef]
- Waniko, D.P. Green Building in Nigeria: Emerging Opportunities for the Quantity Surveying Profession. 2012. Available online: http://alive2green.com/greenbuilding/green-building-in-nigeria-emerging-opportunities-for-the-quantity-surveying-profession/ (accessed on 20 September 2014).
- Smith, M.; Duffy, A. Architects’ perspectives on integrating sustainability into architectural practice. J. Green Build. 2018, 13, 49–69. [Google Scholar]
- Schiavon, S.; Altomonte, S. Green building certification systems: A comparative review. Energy Build. 2015, 109, 201–214. [Google Scholar]
- Bourne, L.M.; Walker, D.H.T. Visualising and mapping stakeholder influence. Manag. Decis. 2005, 43, 649–660. [Google Scholar] [CrossRef]
- Rajablu, M.; Marthandan, G.; Yusoff, W.F. Managing for Stakeholders: The Role of Stakeholder-Based Management in Project Success. J. Asian Soc. Sci. 2015, 11, 111–125. [Google Scholar] [CrossRef] [Green Version]
- Mitchell, R.K.; Bradley, R.A.; Wood, D.J. Toward a theory of stakeholder identification and salience: Defining the principle of who and what really counts. Acad. Manag. Rev. 1997, 22, 853–885. [Google Scholar] [CrossRef]
- Post, J.E.; Preston, L.E.; Sachs, S. Redefining the Corporation—Stakeholder Management and Organizational; Stanford University Press: Redwood City, CA, USA, 2002. [Google Scholar]
- Olander, S.; Martine, C. Stakeholder participation for sustainable property development. Procedia Econ. Financ. 2015, 21, 57–63. [Google Scholar]
- Walker, D.H.T.; Bourne, L.M.; Shelley, A. Influence, stakeholder mapping and visualization. Constr. Manag. Econ. 2008, 26, 645–658. [Google Scholar] [CrossRef]
- Phillips, R.; Freeman, E.; Wicks, A.C. What stakeholder theory is not. Bus. Ethics Q. 2003, 13, 479–502. [Google Scholar]
- Jiang, W.; Wong, J.K. Key activity areas of corporate social responsibility (CSR) in the construction industry: A study of China. J. Clean. Prod. 2016, 113, 850–860. [Google Scholar] [CrossRef]
- Parkin, S. Sustainable development: The concept and the practical challenge. Proc. Inst. Civ. Eng.-Civ. Eng. 2000, 138, 3–8. [Google Scholar] [CrossRef]
- Bal, M.; Bryde, D.; Fearon, D.; Ochieng, E. Stakeholder engagement: Achieving sustainability in the construction sector. Sustainability 2013, 5, 695–710. [Google Scholar] [CrossRef] [Green Version]
- Ng, S.T.; Li, T.H.; Wong, J.M. Rethinking public participation in infrastructure projects. Proc. Inst. Civil Eng. Munic. Eng. 2012, 165, 101–113. [Google Scholar]
- Li, Y.Y.; Chen, P.-H.; Chew DA, S.; Teo, C.C.; Ding, R.G. Exploration of critical external partners of architecture/engineering/construction (AEC) firms for delivering green building projects in Singapore. J. Green Build. 2012, 7, 193–209. [Google Scholar] [CrossRef]
- Liang, F.Y. Influences on innovation benefits during implementation: Client’s perspective. J. Constr. Eng. Manag. 2010, 133, 306–315. [Google Scholar] [CrossRef]
- Takim, R. The management of stakeholders’ needs and expectations in the development of construction project in Malaysia. Mod. Appl. Sci. 2009, 3, 167–175. [Google Scholar] [CrossRef]
- Winch, C. Dimensions of Expertise: A Conceptual Exploration of Vocational Knowledge. Bloomsbury Publishing: London, UK, 2013. [Google Scholar]
- Cadman, D. The Vicious Circle of Blame. Sustainable Construction Task Group; The RICS Research Foundation: London, UK, 2000. [Google Scholar]
- Mendelow, A.L. Environmental scanning-the impact of the stakeholder concept. In Proceedings of the 2nd International Conference on Information Systems, Cambridge, MA, USA, 7–9 December 1981. [Google Scholar]
- Calvert, S. Managing Stakeholders: The Commercial Project Manager; McGraw-Hill: New York, NY, USA, 1995. [Google Scholar]
- Beringer, C.; Jonas, D.; Kock, A. Behavior of internal stakeholders in project portfolio management and its impact on success. Int. J. Proj. Manag. 2013, 31, 830–846. [Google Scholar] [CrossRef]
- Gomes, R.C.; Liddle, J.; Gomes, L.O.M. A five-sided model of stakeholder influence. Public Manag. Rev. 2010, 12, 701–724. [Google Scholar] [CrossRef]
- Williams, K.; Dair, C. What is stopping sustainable building in England? Barriers experienced by stakeholders in delivering sustainable developments. Sustain. Dev. 2007, 15, 135–147. [Google Scholar] [CrossRef]
- Osuizugbo, I. Traditional Building—Construction Problems: Need for Espousal of Sustainable Construction in Nigeria. Int. J. Sci. Res. Publ. 2018, 8, 194–199. [Google Scholar] [CrossRef]
- Pitt, M.; Tucker, M.; Riley, M.; Longden, J. Towards sustainable construction: Promotion and best practices. Constr. Innov. Inf. Process Manag. 2009, 9, 201–224. [Google Scholar] [CrossRef]
- Gan, X.; Zuo, J.; Ye, K.; Skitmore, M.; Xiong, B. Why sustainable construction? Why not? An owner’s perspective. Habitat Int. 2015, 47, 61–68. [Google Scholar] [CrossRef]
- Dalibi, S.G.; Feng, J.C.; Shuangqin, L.; Sadiq, A.; Bello, B.S.; Danja, I.I. Hindrances to Green Building Developments in Nigeria’s Built Environment: “The Project Professionals’ Perspectives”. IOP Conf. Ser. Earth Environ. Sci. 2017, 63, 012033. [Google Scholar] [CrossRef]
- Daniel, E.I.; Oshineye, O.; Oshodi, O. Barriers to Sustainable Construction Practice in Nigeria. In Proceeding of the 34th Annual ARCOM Conference, Belfast, UK, 3–5 September 2018; Gorse, C., Neilson, C.J., Eds.; Association of Researchers in Construction Management: Belfast, UK, 2018. [Google Scholar]
- AlSanad, S. Awareness, drivers, actions, and barriers of sustainable construction in Kuwait. Procedia Eng. 2015, 118, 969–983. [Google Scholar] [CrossRef] [Green Version]
- Circo, C.J. Using mandates and incentives to promote sustainable construction and green building projects in the private sector: A call for more state land use policy initiatives. Penn St. L. Rev. 2007, 112, 731. [Google Scholar]
- Ong, P.S.; Kang, S. Green engineering practices in structural engineering: State-of-the-art and future directions. J. Green Build. 2018, 13, 37–60. [Google Scholar]
- Panagiotidou, M.; May, D. Role of the structural engineer in sustainable design. In Sustainable Buildings and Structures; Springer: Cham, Switzerland, 2017; pp. 1–18. [Google Scholar]
- Smith, J.L.; Love, P.E. Quantity surveyors and sustainability: A review of the Australian quantity surveying profession. J. Constr. Eng. Manag. 2012, 139, 1263–1271. [Google Scholar]
- Akintoye, A.; Chinyio, E.A. Life cycle costing techniques for maintenance of building assets. Facilities 2005, 23, 347–364. [Google Scholar]
- Aibinu, A.A.; Ofori, G. The roles and responsibilities of project managers in sustainable building projects. J. Constr. Dev. Ctries. 2007, 12, 15–34. [Google Scholar]
- Loosemore, M.; Lim, B.T. Stakeholder engagement in building projects: Exploring the contribution of social network analysis. Eng. Constr. Archit. Manag. 2015, 22, 674–693. [Google Scholar]
- Riffat, S.B.; Ma, X. Sustainable architecture in the UK: Current state and future directions. Energy Build. 2003, 35, 553–566. [Google Scholar]
- Zhou, G.; Ma, Z. A review on building energy efficiency in China during “12th Five Year Plan”. Renew. Sustain. Energy Rev. 2017, 75, 220–232. [Google Scholar]
- Srebric, J.; Chen, Q.; Javed, S. Review of sustainable urban district cooling systems. Energy Build. 2004, 36, 393–398. [Google Scholar]
- Kang, J.; Skitmore, M. Impact of plumbing system design on construction waste generation. Build. Res. Inf. 2002, 30, 381–394. [Google Scholar]
- Papargyropoulou, E.; Jones, N.; Iribarren, D. The food waste hierarchy as a framework for the management of food surplus and food waste. J. Clean. Prod. 2014, 76, 106–115. [Google Scholar] [CrossRef]
- Ruiz-Torres, A.J.; Fernandez-Sanchez, G. Environmental impact and life cycle assessment (LCA) of traditional and ecological building systems: A case study in Spain. Build. Environ. 2013, 65, 99–108. [Google Scholar]
- Lützkendorf, T.; Lorenz, D. Sustainable building certification: A review of comparative assessment systems. Int. J. Sustain. Build. Technol. Urban Dev. 2005, 1, 221–234. [Google Scholar]
- Sutrisna, M.; Shah, M.N. An assessment of sustainable housing development in Malaysia: Regulatory framework and stakeholder engagement. Int. J. Sustain. Build. Technol. Urban Dev. 2019, 10, 214–226. [Google Scholar]
- Nduka, D.; Ogunsanmi, O. Construction Professionals’ Perception on Green Building Awareness and Accruable Benefits in Construction Projects in Nigeria. Covenant J. Res. Built Environ. 2015, 5, 188–197. [Google Scholar]
- Mukherjee, A.; Muga, H. An integrative framework for studying sustainable practices and its adoption in the AEC industry: A case study. J. Eng. Technol. Manag. 2010, 27, 197–214. [Google Scholar] [CrossRef]
Background Information | Parameter | Frequency | Percent |
---|---|---|---|
Type of Organisation | Government Agency | 39 | 19.21 |
Contractor | 74 | 36.45 | |
Developer | 90 | 44.33 | |
Designation of Respondent | Architects | 20 | 9.85 |
Quantity Surveyors | 62 | 30.54 | |
Engineers | 25 | 12.32 | |
Builders | 30 | 14.78 | |
Project Managers | 27 | 13.30 | |
Government | 39 | 19.21 | |
Years of Construction Industry Experience | 1–5 years | 48 | 23.6 |
6–10 years | 80 | 39.4 | |
11–15 years | 26 | 12.8 | |
16–20 years | 26 | 12.8 | |
21–25 years | 23 | 11.3 | |
Years of Experience in Sustainable Construction | 1–5 years | 134 | 66 |
6–10 years | 55 | 27.1 | |
11–15 projects | 11 | 5.4 | |
16–20 years | 1 | 0.5 | |
21–25 years | 2 | 1 | |
Professional Membership of the Respondents | Probationers | 52 | 25.6 |
Corporate Members | 111 | 54.7 | |
Fellows | 40 | 19.7 | |
Number of Projects handled in the last ten years | 1–5 projects | 75 | 36.9 |
6–10 projects | 48 | 23.6 | |
11–15 projects | 43 | 21.2 | |
16–20 projects | 17 | 8.4 | |
21–25 projects | 20 | 9.9 |
S/N | Stakeholders’ Roles | All | Government | Contractors | Developers | ||||
---|---|---|---|---|---|---|---|---|---|
MS | R | MS | R | MS | R | MS | R | ||
CONTRACTOR’S ROLES | |||||||||
1 | Taking the lead in achieving a sustainable society through advocacy and other steps | 3.52 | 1 | 3.46 | 3 | 3.46 | 2 | 3.59 | 1 |
2 | Complying with material specifications and suggesting better options where possible | 3.50 | 2 | 3.49 | 2 | 3.50 | 1 | 3.51 | 3 |
3 | Complying with sustainability laws in the operation of their firms | 3.50 | 2 | 3.72 | 1 | 3.38 | 5 | 3.50 | 4 |
4 | Advocating for the delivery and patronage of sustainable buildings | 3.47 | 4 | 3.36 | 7 | 3.39 | 3 | 3.59 | 1 |
5 | Participating in setting sustainable demands and goals | 3.43 | 5 | 3.46 | 3 | 3.35 | 6 | 3.49 | 5 |
6 | Efficiently meeting demands for sustainable practices in the market | 3.39 | 6 | 3.28 | 9 | 3.39 | 3 | 3.44 | 6 |
7 | Adopting ethical sourcing strategies for sustainable projects | 3.37 | 7 | 3.41 | 5 | 3.34 | 7 | 3.39 | 7 |
8 | Simulation of design scenarios to attain sustainability. Targets | 3.30 | 8 | 3.38 | 6 | 3.30 | 8 | 3.26 | 9 |
9 | Studying and interpreting the supply chain and sourcing standards for sustainable construction | 3.28 | 9 | 3.33 | 8 | 3.24 | 9 | 3.28 | 8 |
10 | Updating ethical/responsible manufacturing and sourcing standards | 3.14 | 10 | 3.26 | 10 | 3.05 | 10 | 3.17 | 10 |
GOVERNMENT’S ROLE | |||||||||
1 | Initiating and directing sustainability agenda during the construction period | 3.42 | 1 | 3.28 | 5 | 3.36 | 2 | 3.53 | 1 |
2 | Monitoring project execution for compliance with agreed sustainability standards | 3.38 | 2 | 3.26 | 8 | 3.38 | 1 | 3.44 | 2 |
3 | Providing guidance favouring sustainable construction | 3.36 | 3 | 3.18 | 15 | 3.36 | 2 | 3.44 | 2 |
4 | Evaluating design decisions against sustainability assessment methodologies | 3.35 | 4 | 3.21 | 10 | 3.34 | 4 | 3.42 | 4 |
5 | Obtaining necessary approvals promoting sustainable construction | 3.34 | 5 | 3.44 | 1 | 3.27 | 6 | 3.36 | 5 |
6 | Providing and applying necessary incentives for sustainable compliance | 3.29 | 6 | 3.28 | 5 | 3.32 | 5 | 3.26 | 7 |
7 | Informing stakeholders on choices of sustainable construction materials | 3.27 | 7 | 3.36 | 2 | 3.22 | 7 | 3.27 | 6 |
8 | Providing relevant legislation promoting sustainable construction | 3.23 | 8 | 3.33 | 3 | 3.22 | 7 | 3.20 | 12 |
9 | Drafting and appraising the adequacy of contractual terms in the light of sustainable construction | 3.21 | 9 | 3.18 | 14 | 3.20 | 9 | 3.22 | 10 |
10 | Enforcing ethical sourcing standards for sustainable construction | 3.20 | 10 | 3.31 | 4 | 3.14 | 12 | 3.20 | 12 |
11 | Outlining dispute resolution procedures available for sustainable construction | 3.19 | 11 | 3.15 | 16 | 3.12 | 13 | 3.26 | 7 |
12 | Designing iterations towards sustainability target | 3.17 | 12 | 3.21 | 10 | 3.08 | 14 | 3.22 | 10 |
13 | Partnering with stakeholders to drive public consciousness | 3.17 | 12 | 3.21 | 10 | 3.05 | 15 | 3.24 | 9 |
14 | Drafting and appraising the adequacy of procurement method options for sustainable construction | 3.16 | 14 | 3.21 | 10 | 3.16 | 10 | 3.14 | 14 |
15 | Monitoring new knowledge on sustainability and ethical supply chain | 3.16 | 14 | 3.26 | 8 | 3.15 | 11 | 3.13 | 15 |
16 | Funding sustainability teaching, research, and development to sensitize society to the importance of sustainable construction | 3.11 | 16 | 3.28 | 5 | 3.03 | 16 | 3.10 | 16 |
DEVELOPERS’ ROLES | |||||||||
1 | Contributing sustainable ideas at the briefing stage | 3.37 | 1 | 3.46 | 1 | 3.32 | 1 | 3.38 | 2 |
2 | Adherence to sound professional advice promoting sustainable construction | 3.35 | 2 | 3.36 | 5 | 3.32 | 1 | 3.37 | 3 |
3 | Constantly updating knowledge on sustainable building | 3.34 | 3 | 3.31 | 7 | 3.24 | 8 | 3.44 | 1 |
4 | Interest in sustainable construction | 3.33 | 4 | 3.23 | 13 | 3.32 | 1 | 3.37 | 3 |
5 | Clear specification of sustainable features, characteristics, materials, and methods | 3.33 | 4 | 3.33 | 6 | 3.31 | 4 | 3.34 | 5 |
6 | Evaluating price decisions in line with sustainable project objectives | 3.30 | 6 | 3.38 | 2 | 3.30 | 5 | 3.26 | 10 |
7 | Appraisal of sustainability credentials of design professionals | 3.30 | 6 | 3.38 | 2 | 3.22 | 11 | 3.32 | 6 |
8 | Design sustainably—floor, green ratio, harmless gas emissions, etc. | 3.28 | 8 | 3.28 | 11 | 3.27 | 7 | 3.29 | 8 |
9 | Identifying and allocating risks associated with sustainable buildings | 3.27 | 9 | 3.15 | 16 | 3.28 | 6 | 3.31 | 7 |
10 | Commissioning relevant professionals knowledgeable in sustainable construction | 3.25 | 10 | 3.26 | 12 | 3.23 | 10 | 3.27 | 9 |
11 | Preparing a post-construction maintenance plan incorporating sustainable features | 3.24 | 11 | 3.31 | 7 | 3.24 | 8 | 3.21 | 12 |
12 | Defining information required from sustainable stakeholders | 3.21 | 12 | 3.31 | 7 | 3.22 | 11 | 3.17 | 15 |
13 | Appraising client’s fund acquisition decisions and advising accordingly on the benefits of sustainable projects | 3.21 | 12 | 3.31 | 7 | 3.18 | 13 | 3.19 | 13 |
14 | Compliance with ethical sourcing of sustainable construction materials | 3.20 | 14 | 3.38 | 2 | 3.11 | 16 | 3.19 | 13 |
15 | Facilitating stakeholder engagement on general and sustainability matters | 3.17 | 15 | 3.13 | 17 | 3.12 | 15 | 3.23 | 11 |
16 | Preparing occupancy guide for end users | 3.15 | 16 | 3.21 | 15 | 3.14 | 14 | 3.14 | 17 |
17 | Arranging for funding and agreement on funding terms with the other stakeholders | 3.11 | 17 | 3.23 | 13 | 2.97 | 17 | 3.17 | 15 |
S/N | Stakeholders’ Roles | ANOVA | |
---|---|---|---|
F Stat | p Value | ||
CONTRACTORS’ ROLES | |||
1 | Taking the lead in achieving a sustainable society through advocacy and other steps | 0.338 | 0.714 |
2 | Complying with material specifications and suggesting better options where possible | 0.006 | 0.994 |
3 | Complying with sustainability laws in the operation of their firms | 1.316 | 0.270 |
4 | Advocating for the delivery and patronage of sustainable buildings | 1.088 | 0.339 |
5 | Participating in setting sustainable demands and goals | 0.334 | 0.716 |
6 | Efficiently meeting demands for sustainable practices in the market | 0.324 | 0.724 |
7 | Adopting ethical sourcing strategies for sustainable projects | 0.076 | 0.927 |
8 | Simulation of design scenarios to attain sustainability targets | 0.135 | 0.874 |
9 | Studying and interpreting the supply chain and sourcing standards for sustainable construction | 0.067 | 0.936 |
10 | Updating ethical/responsible manufacturing and sourcing standards | 0.375 | 0.688 |
GOVERNMENT’S ROLE | |||
1 | Initiating and directing sustainability agenda during the construction period | 0.901 | 0.408 |
2 | Monitoring project execution for compliance with agreed sustainability standards | 0.332 | 0.718 |
3 | Providing guidance favouring sustainable construction | 0.827 | 0.439 |
4 | Evaluating design decisions against sustainability assessment methodologies | 0.447 | 0.640 |
5 | Obtaining necessary approvals promoting sustainable construction | 0.241 | 0.786 |
6 | Providing and applying necessary incentives for sustainable compliance | 0.077 | 0.926 |
7 | Informing stakeholders on choices of sustainable construction materials | 0.170 | 0.844 |
8 | Providing relevant legislation promoting sustainable construction | 0.183 | 0.833 |
9 | Drafting and appraising the adequacy of contractual terms in the light of sustainable construction | 0.016 | 0.984 |
10 | Enforcing ethical sourcing standards for sustainable construction | 0.248 | 0.781 |
11 | Outlining dispute resolution procedures available for sustainable construction | 0.259 | 0.772 |
12 | Design iterations towards sustainability target | 0.312 | 0.733 |
13 | Partnering with stakeholders to drive public consciousness | 0.486 | 0.616 |
14 | Drafting and appraising the adequacy of procurement method options for sustainable construction | 0.032 | 0.969 |
15 | Monitoring new knowledge on sustainability and ethical supply chain | 0.147 | 0.863 |
16 | Funding sustainability teaching, research, and development to sensitize society to the importance of sustainable construction | 0.543 | 0.582 |
DEVELOPERS’ ROLES | |||
1 | Contributing sustainable ideas at the briefing stage | 0.173 | 0.841 |
2 | Adherence to sound professional advice promoting sustainable construction | 0.024 | 0.976 |
3 | Constantly updating knowledge on sustainable building | 0.594 | 0.553 |
4 | Interest in sustainable construction | 0.196 | 0.822 |
5 | Clear specification of sustainable features, characteristics, materials, and methods | 0.015 | 0.985 |
6 | Evaluating price decisions in line with sustainable project objectives | 0.151 | 0.860 |
7 | Appraisal of sustainability credentials of design professionals | 0.300 | 0.741 |
8 | Design sustainably—floor, green ratio, harmless gas emissions, etc. | 0.004 | 0.996 |
9 | Identifying and allocating risks associated with sustainable buildings | 0.239 | 0.788 |
10 | Commissioning relevant professionals knowledgeable in sustainable construction | 0.019 | 0.981 |
11 | Preparing a post-construction maintenance plan incorporating sustainable features | 0.079 | 0.924 |
12 | Defining information required from sustainable stakeholders | 0.197 | 0.821 |
13 | Appraising client’s fund acquisition decisions and advising accordingly on the benefits of sustainable projects | 0.170 | 0.844 |
14 | Compliance with ethical sourcing of sustainable construction materials | 0.625 | 0.536 |
15 | Facilitating stakeholder engagement on general and sustainability matters | 0.195 | 0.823 |
16 | Preparing occupancy guide for end users | 0.041 | 0.960 |
17 | Arranging for funding and agreement on funding terms with the other stakeholders | 0.699 | 0.498 |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Leo-Olagbaye, F.; Odeyinka, H.; Rathnasiri, P. Stakeholders’ Roles in the Delivery of Sustainable Housing Projects in Lagos State, Nigeria. Sustainability 2023, 15, 11709. https://doi.org/10.3390/su151511709
Leo-Olagbaye F, Odeyinka H, Rathnasiri P. Stakeholders’ Roles in the Delivery of Sustainable Housing Projects in Lagos State, Nigeria. Sustainability. 2023; 15(15):11709. https://doi.org/10.3390/su151511709
Chicago/Turabian StyleLeo-Olagbaye, Feyisetan, Henry Odeyinka, and Pavithra Rathnasiri. 2023. "Stakeholders’ Roles in the Delivery of Sustainable Housing Projects in Lagos State, Nigeria" Sustainability 15, no. 15: 11709. https://doi.org/10.3390/su151511709
APA StyleLeo-Olagbaye, F., Odeyinka, H., & Rathnasiri, P. (2023). Stakeholders’ Roles in the Delivery of Sustainable Housing Projects in Lagos State, Nigeria. Sustainability, 15(15), 11709. https://doi.org/10.3390/su151511709