Naneva, A.;                     Bonanomi, M.;                     Hollberg, A.;                     Habert, G.;                     Hall, D.    
        Integrated BIM-Based LCA for the Entire Building Process Using an Existing Structure for Cost Estimation in the Swiss Context. Sustainability 2020, 12, 3748.
    https://doi.org/10.3390/su12093748
    AMA Style
    
                                Naneva A,                                 Bonanomi M,                                 Hollberg A,                                 Habert G,                                 Hall D.        
                Integrated BIM-Based LCA for the Entire Building Process Using an Existing Structure for Cost Estimation in the Swiss Context. Sustainability. 2020; 12(9):3748.
        https://doi.org/10.3390/su12093748
    
    Chicago/Turabian Style
    
                                Naneva, Anita,                                 Marcella Bonanomi,                                 Alexander Hollberg,                                 Guillaume Habert,                                 and Daniel Hall.        
                2020. "Integrated BIM-Based LCA for the Entire Building Process Using an Existing Structure for Cost Estimation in the Swiss Context" Sustainability 12, no. 9: 3748.
        https://doi.org/10.3390/su12093748
    
    APA Style
    
                                Naneva, A.,                                 Bonanomi, M.,                                 Hollberg, A.,                                 Habert, G.,                                 & Hall, D.        
        
        (2020). Integrated BIM-Based LCA for the Entire Building Process Using an Existing Structure for Cost Estimation in the Swiss Context. Sustainability, 12(9), 3748.
        https://doi.org/10.3390/su12093748