Barrier-Oriented FWGM-Based Fuzzy-FMEA for Risk Assessment and Safety-Barrier Prioritization in Solvent-Based Electrospinning Processes
Abstract
1. Introduction
2. Materials and Methods
2.1. Study System and Process Scope
2.2. Expert Panel, Evaluation Procedure, and Scoring Principles
2.3. FMEA Scoring Criteria
2.4. Conventional FMEA and Auxiliary Comparison Index
2.5. FWGM-Based Fuzzy-FMEA
3. Results and Discussion
3.1. Stepwise Risk Structure and Conventional FMEA Results
3.2. Risk-Priority Re-Ranking Using FWGM-Based Fuzzy-FMEA
3.3. Engineering Interpretation of High-Risk Failure Modes and Safety-Barrier Prioritization
3.4. Risk Reduction Effect of Safety-Barrier Application Scenarios
3.5. Study Limitations and Future Research Directions
4. Conclusions
Supplementary Materials
Author Contributions
Funding
Data Availability Statement
Acknowledgments
Conflicts of Interest
References
- Reneker, D.H.; Chun, I. Nanometre diameter fibres of polymer, produced by electrospinning. Nanotechnology 1996, 7, 216–223. [Google Scholar] [CrossRef] [Scilit]
- Huang, Z.-M.; Zhang, Y.-Z.; Kotaki, M.; Ramakrishna, S. A review on polymer nanofibers by electrospinning and their applications in nanocomposites. Compos. Sci. Technol. 2003, 63, 2223–2253. [Google Scholar] [CrossRef] [Scilit]
- Li, D.; Xia, Y. Electrospinning of nanofibers: Reinventing the wheel? Adv. Mater. 2004, 16, 1151–1170. [Google Scholar] [CrossRef] [Scilit]
- Greiner, A.; Wendorff, J.H. Electrospinning: A fascinating method for the preparation of ultrathin fibers. Angew. Chem. Int. Ed. 2007, 46, 5670–5703. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Deitzel, J.M.; Kleinmeyer, J.; Harris, D.; Beck Tan, N.C. The effect of processing variables on the morphology of electrospun nanofibers and textiles. Polymer 2001, 42, 261–272. [Google Scholar] [CrossRef] [Scilit]
- Fong, H.; Chun, I.; Reneker, D.H. Beaded nanofibers formed during electrospinning. Polymer 1999, 40, 4585–4592. [Google Scholar] [CrossRef] [Scilit]
- Hohman, M.M.; Shin, M.; Rutledge, G.; Brenner, M.P. Electrospinning and electrically forced jets. I. Stability theory. Phys. Fluids 2001, 13, 2201–2220. [Google Scholar] [CrossRef] [Scilit]
- Hohman, M.M.; Shin, M.; Rutledge, G.; Brenner, M.P. Electrospinning and electrically forced jets. II. Applications. Phys. Fluids 2001, 13, 2221–2236. [Google Scholar] [CrossRef] [Scilit]
- Avossa, J.; Herwig, G.; Toncelli, C.; Itel, F.; Rossi, R.M. Electrospinning based on benign solvents: Current definitions, implications and strategies. Green Chem. 2022, 24, 2347–2375. [Google Scholar] [CrossRef] [Scilit]
- Ménard, A.D.; Trant, J.F. A review and critique of academic lab safety research. Nat. Chem. 2020, 12, 17–25. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Cho, Y.; Baek, J.W.; Sagong, M.; Ahn, S.; Nam, J.S.; Kim, I.-D. Electrospinning and Nanofiber Technology: Fundamentals, Innovations, and Applications. Adv. Mater. 2025, 37, 2500162. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Omiyale, B.O.; Ogbeyemi, A.; Rasheed, A.A.; Adamolekun, T.M.; Zhang, W.C. Influence of Electrospinning Parameters on the Development of High-Quality Electrospun Nanofibers: A Brief Critical Assessment. Next Nanotechnol. 2025, 8, 100295. [Google Scholar] [CrossRef] [Scilit]
- Xue, J.; Wu, T.; Dai, Y.; Xia, Y. Electrospinning and electrospun nanofibers: Methods, materials, and applications. Chem. Rev. 2019, 119, 5298–5415. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Megelski, S.; Stephens, J.S.; Chase, D.B.; Rabolt, J.F. Micro- and nanostructured surface morphology on electrospun polymer fibers. Macromolecules 2002, 35, 8456–8466. [Google Scholar] [CrossRef] [Scilit]
- Malara, A. Environmental Concerns on the Use of the Electrospinning Technique for the Production of Polymeric Micro/Nanofibers. Sci. Rep. 2024, 14, 8293. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Zahra, F.T.; Zhang, Y.; Ajayi, A.O.; Quick, Q.; Mu, R. Optimization of Electrospinning Parameters for Lower Molecular Weight Polymers: A Case Study on Polyvinylpyrrolidone. Polymers 2024, 16, 1217. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Ab Rahim, M.S.; Reniers, G.; Yang, M.; Bajpai, S. Risk assessment methods for process safety, process security and resilience in the chemical process industry: A thorough literature review. J. Loss Prev. Process Ind. 2024, 88, 105274. [Google Scholar] [CrossRef] [Scilit]
- Ruijters, E.; Stoelinga, M. Fault tree analysis: A survey of the state-of-the-art in modeling, analysis and tools. Comput. Sci. Rev. 2015, 15–16, 29–62. [Google Scholar] [CrossRef] [Scilit]
- Myers, P.M. Layer of Protection Analysis—Quantifying human performance in initiating events and independent protection layers. J. Loss Prev. Process Ind. 2013, 26, 534–546. [Google Scholar] [CrossRef] [Scilit]
- Chin, K.-S.; Wang, Y.-M.; Poon, G.K.K.; Yang, J.-B. Failure mode and effects analysis using a group-based evidential reasoning approach. Comput. Oper. Res. 2009, 36, 1768–1779. [Google Scholar] [CrossRef] [Scilit]
- Wang, Y.-M.; Chin, K.-S.; Poon, G.K.K.; Yang, J.-B. Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean. Expert Syst. Appl. 2009, 36, 1195–1207. [Google Scholar] [CrossRef] [Scilit]
- Bowles, J.B.; Peláez, C.E. Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis. Reliab. Eng. Syst. Saf. 1995, 50, 203–213. [Google Scholar] [CrossRef] [Scilit]
- Liu, P.; Shen, M.; Geng, Y. Risk Assessment Based on Failure Mode and Effects Analysis (FMEA) and WASPAS Methods under Probabilistic Double Hierarchy Linguistic Term Sets. Comput. Ind. Eng. 2023, 186, 109758. [Google Scholar] [CrossRef] [Scilit]
- Liu, H.-C.; Liu, L.; Bian, Q.-H.; Lin, Q.-L.; Dong, N.; Xu, P.-C. Failure mode and effects analysis using fuzzy evidential reasoning approach and grey theory. Expert Syst. Appl. 2011, 38, 4403–4415. [Google Scholar] [CrossRef] [Scilit]
- Kim, J.G.; Bai, B.C. Study on Risk Analysis of a Rotary Kiln-Based Activated Carbon Manufacturing Process Using Fuzzy-FMEA. Processes 2026, 14, 1071. [Google Scholar] [CrossRef] [Scilit]
- Liu, H.-C.; Liu, L.; Liu, N. Risk evaluation approaches in failure mode and effects analysis: A literature review. Expert Syst. Appl. 2013, 40, 828–838. [Google Scholar] [CrossRef] [Scilit]
- Liu, H.-C.; Chen, X.-Q.; Duan, C.-Y.; Wang, Y.-M. Failure mode and effect analysis using multi-criteria decision making methods: A systematic literature review. Comput. Ind. Eng. 2019, 135, 881–897. [Google Scholar] [CrossRef] [Scilit]
- Huang, J.; You, J.-X.; Liu, H.-C.; Song, M.-S. Failure mode and effect analysis improvement: A systematic literature review and future research agenda. Reliab. Eng. Syst. Saf. 2020, 199, 106885. [Google Scholar] [CrossRef] [Scilit]
- Occupational Safety and Health Administration. Laboratory Safety: Chemical Fume Hoods. OSHA QuickFacts, OSHA 3407. 2011. Available online: https://www.osha.gov/sites/default/files/publications/OSHAQUICKFACTS-LAB-SAFETY-CHEMICAL-FUME-HOODS.pdf (accessed on 1 June 2026).
- Occupational Safety and Health Administration. 29 CFR 1910.1450 App A: National Research Council Recommendations Concerning Chemical Hygiene in Laboratories (Non-Mandatory). Available online: https://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.1450AppA (accessed on 1 June 2026).
- National Fire Protection Association. NFPA 45: Standard on Fire Protection for Laboratories Using Chemicals; NFPA: Quincy, MA, USA, 2024; Available online: https://www.nfpa.org/codes-and-standards/nfpa-45-standard-development/45 (accessed on 1 June 2026).
- ANSI/ASSP. ANSI/ASSP Z9.5-2022: Laboratory Ventilation; American Society of Safety Professionals: Park Ridge, IL, USA, 2022; Available online: https://blog.ansi.org/ansi/ansi-assp-z9-5-2022-laboratory-ventilation/ (accessed on 1 June 2026).
- Deng, X.; Jiang, W. Fuzzy risk evaluation in failure mode and effects analysis using a D numbers based multi-sensor information fusion method. Sensors 2017, 17, 2086. [Google Scholar] [CrossRef] [Scilit] [PubMed]
- Liu, H.; Deng, X.; Jiang, W. Risk evaluation in failure mode and effects analysis using fuzzy measure and fuzzy integral. Symmetry 2017, 9, 162. [Google Scholar] [CrossRef] [Scilit]
- Lo, H.-W.; Liou, J.J.H. A novel multiple-criteria decision-making-based FMEA model for risk assessment. Appl. Soft Comput. 2018, 73, 684–696. [Google Scholar] [CrossRef] [Scilit]
- Qin, J.; Xi, Y.; Pedrycz, W. Failure mode and effects analysis (FMEA) for risk assessment based on interval type-2 fuzzy evidential reasoning method. Appl. Soft Comput. 2020, 89, 106134. [Google Scholar] [CrossRef] [Scilit]
- Liou, J.J.H.; Guo, B.H.T.; Huang, S.-W.; Yang, Y.-T. Failure Mode and Effect Analysis Using Interval Type-2 Fuzzy and Multiple-Criteria Decision-Making Methods. Mathematics 2024, 12, 3931. [Google Scholar] [CrossRef] [Scilit]
- Yu, Y.; Yang, Y.; Yu, J.; Wu, S.; Zeng, Q.; Ding, H.; Ma, J.; Duan, Q. An Improved FMEA Approach Based on Interval-Valued Spherical Fuzzy Sets and CODAS Method for LNG Tank Safety Analysis. J. Loss Prev. Process Ind. 2025, 97, 105679. [Google Scholar] [CrossRef] [Scilit]
- Soltani, E.; Mohammadinejad, A.; Rashnoudi, P.; Ahmadi, O. A Fuzzy Based Hybrid Approach for Risk Assessment of Anesthesiologists Using OPA and EDAS Methods. Sci. Rep. 2025, 15, 32028. [Google Scholar] [CrossRef] [Scilit] [PubMed]




| No. | Process Step | Representative Failure Mode |
|---|---|---|
| 1 | Material Review/Approval | Failure to review the safety data sheet (SDS) or omission of additives, resulting in underestimated hazard |
| 2 | Solution Preparation | Preparation outside the hood or prolonged open preparation |
| 3 | Solvent Transfer | Transfer of flammable solvent without bonding/grounding |
| 4 | Syringe Filling/Installation | Leakage or splashing during syringe/needle connection |
| 5 | Equipment Setup | Poor collector grounding, exposed high-voltage parts, and absence of interlocks |
| 6 | Pre-Start Inspection | Start-up without confirming exhaust, door status, or distance |
| 7 | Voltage Application/Start-Up | Dripping/arc generation due to excessive voltage, excessive flow rate, or improper distance |
| 8 | Normal Operation | Direct adjustment of the needle/collector during energization |
| 9 | Response to Abnormalities | Clog removal without shutdown and discharge confirmation |
| 10 | Shutdown/Discharge | Contact under residual-charge condition after power-off |
| 11 | Product Collection | Collection of a wet fiber mat on an open bench |
| 12 | Post-Treatment | Immediate heat treatment of samples with residual solvent |
| 13 | Waste Disposal/Cleaning | Open waste containers and unattended contaminated materials |
| 14 | Maintenance | Opening the power supply or using damaged cables while power remains connected |
| Score | Severity (S) | Occurrence (O) | Detection (D) |
|---|---|---|---|
| 1 | Mild housekeeping-level problem; no health impact | Rare under normal operating conditions | Almost certainly detectable in advance by a checklist, interlock, indicator light, etc. |
| 2 | Minor exposure or localized contamination; first-aid level | May occur intermittently under abnormal or maintenance conditions | Detectable with high probability through an inspection procedure or operator observation |
| 3 | Reversible health effect, small spill, temporary process interruption | May occasionally occur during routine laboratory activity | Detectable depending on operator skill, but omissions are possible |
| 4 | Serious exposure, localized fire, electrical burn, or equipment damage | May occur frequently under unstable operating conditions | Likely to be detected only after the abnormality has progressed |
| 5 | Major accident, severe electric shock, fire/explosion, or fatal toxic exposure | Repetitive or nearly inevitable in the absence of controls | Very difficult to detect before an imminent accident |
| Integer Score | Triangular Fuzzy Number (TFN) |
|---|---|
| 1 | (1, 1, 2) |
| 2 | (1, 2, 3) |
| 3 | (2, 3, 4) |
| 4 | (3, 4, 5) |
| 5 | (4, 5, 5) |
| Hazard Type | Linguistic Weights (S, O, D) | Normalized Weights (, , ) | Applied Steps |
|---|---|---|---|
| Chemical-dominant | H, H, M | (0.368, 0.368, 0.263) | Material Review/Approval (1), Solution Preparation (2), Syringe Filling/Installation (4), Product Collection (11), Post-Treatment (12) |
| Electrical-dominant | VH, M, H | (0.419, 0.242, 0.339) | Equipment Setup (5), Normal Operation (8), Response to Abnormalities (9), Shutdown/Discharge (10), Maintenance (14) |
| Fire/static-dominant | VH, M, M | (0.464, 0.268, 0.268) | Solvent Transfer (3) |
| Combined-dominant | VH, H, H | (0.383, 0.309, 0.309) | Pre-Start Inspection (6), Voltage Application/Start-Up (7), Waste Disposal/Cleaning (13) |
| No. | Process Step | Failure Mode | Main Cause | Potential Effect | Hazard Type | S/O/D | RPN |
|---|---|---|---|---|---|---|---|
| 1 | Material Review/Approval | Failure to review the safety data sheet (SDS) or omission of additives | Use of customary recipes, supplier change, omission of additive/nanofiller review | Inappropriate PPE and ventilation, underestimated toxicity/flammability, process-wide risk propagation | Chemical-dominant | 5/3/4 | 60 |
| 2 | Solution Preparation | Preparation outside the hood or prolonged open preparation | Open-bench work, prolonged container opening, prioritization of convenience | Solvent-vapor exposure, local vapor accumulation, increased flammability risk | Chemical-dominant | 5/3/3 | 45 |
| 3 | Solvent Transfer | Transfer of flammable solvent without bonding/grounding | Lack of bonding/grounding procedure, inadequate electrostatic control | Electrostatic spark ignition, fire, secondary worker exposure | Fire/static-dominant | 5/2/4 | 40 |
| 4 | Syringe Filling/Installation | Leakage or splashing during syringe/needle connection | Overfilling, incomplete Luer connection, forced injection of high-viscosity solution | Skin/eye exposure, contamination, localized vapor release | Chemical-dominant | 4/3/2 | 24 |
| 5 | Equipment Setup | Poor collector grounding, exposed high-voltage parts, and absence of interlocks | Loose grounding wire, homemade apparatus, insulation deterioration, inadequate shielding | Electric shock, arcing, fire, equipment damage | Electrical-dominant | 5/3/4 | 60 |
| 6 | Pre-Start Inspection | Start-up without confirming exhaust, door status, or distance | Absence of a pre-start checklist, rushed operation, and door status not checked | Ignition risk, electric shock, defective fiber formation | Combined-dominant | 5/3/4 | 60 |
| 7 | Voltage Application/Start-Up | Dripping/arc generation due to excessive voltage, excessive flow rate, or improper distance | Unverified start-up conditions, recipe variation, and error in initial settings | Leakage, fiber defects, arcing, localized fire | Combined-dominant | 5/3/3 | 45 |
| 8 | Normal Operation | Direct adjustment of the needle/collector during energization | Ad hoc intervention for process stabilization, insufficient access restriction | Direct electric shock, secondary injury | Electrical-dominant | 5/2/4 | 40 |
| 9 | Response to Abnormalities | Clog removal without shutdown and discharge confirmation | Insufficient understanding of residual charge, absence of a troubleshooting SOP | Electric shock, arc, solution splashing, facial/hand exposure | Electrical-dominant | 5/3/4 | 60 |
| 10 | Shutdown/Discharge | Contact under residual-charge condition after power-off | Mistaken belief that power-off means safe, absence of a discharge verification procedure | Electric shock, arc, secondary accident during shutdown | Electrical-dominant | 5/2/4 | 40 |
| 11 | Product Collection | Collection of a wet fiber mat on an open bench | Insufficient confirmation of drying, handling outside the hood | Residual-solvent exposure, contamination spread | Chemical-dominant | 4/2/4 | 32 |
| 12 | Post-Treatment | Immediate heat treatment of samples with residual solvent | Insufficient drying time, absence of criteria, failure to review equipment suitability | Vapor release, possible fire in the oven, increased exposure | Chemical-dominant | 4/2/4 | 32 |
| 13 | Waste Disposal/Cleaning | Open waste containers and unattended contaminated materials | Stored near equipment for convenience, lid not fully closed | Vapor accumulation, secondary ignition, persistent exposure | Combined-dominant | 5/2/4 | 40 |
| 14 | Maintenance | Opening the power supply or using damaged cables while power remains connected | Unauthorized repair, absence of regular inspection, and damaged cable left unaddressed | Severe electric shock, arc, fire, reduced equipment reliability | Electrical-dominant | 5/2/4 | 40 |
| Rank Group (Implementation Priority) | No. | Process Step | Hazard Type | S/O/D | Conventional RPN | FRPN (TFN) | FRPN (0–100) |
|---|---|---|---|---|---|---|---|
| 1T(1) | 9 | Response to Abnormalities | Electrical-dominant | 5/3/4 | 60 | (3.068, 4.097, 4.737) | 79.35 |
| 1T(2) | 5 | Equipment Setup | Electrical-dominant | 5/3/4 | 60 | (3.068, 4.097, 4.737) | 79.35 |
| 3(3) | 6 | Pre-Start Inspection | Combined-dominant | 5/3/4 | 60 | (2.955, 3.986, 4.667) | 77.39 |
| 4(4) | 1 | Material Review/Approval | Chemical-dominant | 5/3/4 | 60 | (2.873, 3.906, 4.605) | 75.89 |
| 5T(5) | 14 | Maintenance | Electrical-dominant | 5/2/4 | 40 | (2.595, 3.714, 4.419) | 71.52 |
| 5T(6) | 10 | Shutdown/Discharge | Electrical-dominant | 5/2/4 | 40 | (2.595, 3.714, 4.419) | 71.52 |
| 5T(7) | 8 | Normal Operation | Electrical-dominant | 5/2/4 | 40 | (2.595, 3.714, 4.419) | 71.52 |
| 8(8) | 7 | Voltage Application/Start-Up | Combined-dominant | 5/3/3 | 45 | (2.608, 3.648, 4.357) | 70.76 |
| 9(9) | 3 | Solvent Transfer | Fire/static-dominant | 5/2/4 | 40 | (2.554, 3.685, 4.361) | 70.67 |
| 10(10) | 2 | Solution Preparation | Chemical-dominant | 5/3/3 | 45 | (2.582, 3.621, 4.343) | 70.30 |
| 11(11) | 13 | Waste Disposal/Cleaning | Combined-dominant | 5/2/4 | 40 | (2.385, 3.517, 4.270) | 67.81 |
| 12T(12) | 12 | Post-Treatment | Chemical-dominant | 4/2/4 | 32 | (2.001, 3.099, 4.142) | 61.62 |
| 12T(13) | 11 | Product Collection | Chemical-dominant | 4/2/4 | 32 | (2.001, 3.099, 4.142) | 61.62 |
| 14(14) | 4 | Syringe Filling/Installation | Chemical-dominant | 4/3/2 | 24 | (1.935, 2.998, 4.026) | 59.73 |
| Process Step | Safety Engineering Characteristic | Engineering Root Cause | Prioritized Safety-Barrier Package |
|---|---|---|---|
| Material Review/Approval (1) | Upstream information-based hazard | No SDS review, omitted composition, absence of an approval system | Mandatory SDS review, re-approval of composition changes, pre-review system |
| Equipment Setup (5) | Direct high-voltage access hazard | Poor grounding, exposed high-voltage parts, absence of an enclosure/interlock | Grounded enclosure, interlock, grounding continuity check |
| Pre-Start Inspection (6) | Pre-start combined hazard | Ventilation/door/distance not checked, absence of a pre-start procedure | Pre-start checklist, ventilation confirmation, door-closed confirmation |
| Voltage Application/Start-Up (7) | Coupled operational instability and ignition hazard | Excessive voltage, excessive flow rate, improper distance, erroneous initial conditions | Validated operating window, focused initial observation, drip tray |
| Response to Abnormalities (9) | Abnormal-response intervention hazard | Access before discharge, absence of a troubleshooting SOP | De-energize-discharge-verify procedure, access control |
| Solvent Transfer (3) | Electrostatic ignition hazard | Bonding/grounding not implemented | Bonding/grounding, pre-transfer check |
| Shutdown/Discharge (10) | Residual-charge contact hazard | Misconception that power-off means safe, absence of discharge confirmation | Residual-charge confirmation, shutdown checklist |
| Maintenance (14) | Maintenance without de-energization confirmation hazard | Failure to comply with power isolation, damaged cable left unaddressed | De-energized maintenance principle, periodic inspection, and replacement of damaged cables |
| Process Step | Key Safety Barrier | Pre-Control FRPN | Post-Control FRPN | Reduction Rate (%) | Main Dimension of Change |
|---|---|---|---|---|---|
| Response to Abnormalities (9) | De-energize-discharge-verify, troubleshooting SOP, access control | 79.35 | 44.60 | 43.79 | Mostly improved O and D |
| Equipment Setup (5) | Grounded enclosure, door interlock, grounding continuity check | 79.35 | 44.60 | 43.79 | Mostly improved O and D |
| Pre-Start Inspection (6) | Pre-start checklist, exhaust/door confirmation, validated operating window | 77.39 | 48.06 | 37.90 | Mostly improved O and D |
| Material Review/Approval (1) | SDS review gate, composition re-approval, change review | 75.89 | 46.38 | 38.89 | Mostly improved O and D |
| Solvent Transfer (3) | Bonding/grounding, sealed transfer, transfer checklist | 70.67 | 52.38 | 25.88 | Mostly improved O and D |
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.
Share and Cite
Kim, J.G.; Bai, B.C. Barrier-Oriented FWGM-Based Fuzzy-FMEA for Risk Assessment and Safety-Barrier Prioritization in Solvent-Based Electrospinning Processes. Materials 2026, 19, 2673. https://doi.org/10.3390/ma19122673
Kim JG, Bai BC. Barrier-Oriented FWGM-Based Fuzzy-FMEA for Risk Assessment and Safety-Barrier Prioritization in Solvent-Based Electrospinning Processes. Materials. 2026; 19(12):2673. https://doi.org/10.3390/ma19122673
Chicago/Turabian StyleKim, Jong Gu, and Byong Chol Bai. 2026. "Barrier-Oriented FWGM-Based Fuzzy-FMEA for Risk Assessment and Safety-Barrier Prioritization in Solvent-Based Electrospinning Processes" Materials 19, no. 12: 2673. https://doi.org/10.3390/ma19122673
APA StyleKim, J. G., & Bai, B. C. (2026). Barrier-Oriented FWGM-Based Fuzzy-FMEA for Risk Assessment and Safety-Barrier Prioritization in Solvent-Based Electrospinning Processes. Materials, 19(12), 2673. https://doi.org/10.3390/ma19122673