Next Article in Journal
Application of System Dynamic Modelling for Evaluation of Carbon Mitigation Strategies in Cement Industries: A Comparative Overview of the Current State of the Art
Next Article in Special Issue
Utility Scale Ground Mounted Photovoltaic Plants with Gable Structure and Inverter Oversizing for Land-Use Optimization
Previous Article in Journal
Implementation of an FPGA-Based Current Control and SVPWM ASIC with Asymmetric Five-Segment Switching Scheme for AC Motor Drives
Previous Article in Special Issue
A New MPPT Algorithm for Photovoltaic Power Generation under Uniform and Partial Shading Conditions
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement

National Renewable Energy Laboratory, Golden, CO 80401, USA
*
Author to whom correspondence should be addressed.
Energies 2021, 14(5), 1463; https://doi.org/10.3390/en14051463
Submission received: 2 February 2021 / Revised: 22 February 2021 / Accepted: 26 February 2021 / Published: 8 March 2021
(This article belongs to the Special Issue Photovoltaic Systems: Modelling, Control, Design and Applications)

Abstract

With the increasing share of distributed energy resources on the electric grid, utility companies are facing significant decisions about infrastructure upgrades. An alternative to extensive and capital-intensive upgrades is to offer non-firm interconnection opportunities to distributed generators, via a coordinated operation of utility scale resources. This paper introduces a novel flexible interconnection option based on the last-in, first-out principles of access aimed at minimizing the unnecessary non-firm generation energy curtailment by balancing access rights and contribution to thermal overloads. Although we focus on solar photovoltaic (PV) plants in this work, the introduced flexible interconnection option applies to any distributed generation technology. The curtailment risk of individual non-firm PV units is evaluated across a range of PV penetration levels in a yearlong quasi-static time-series simulation on a real-world feeder. The results show the importance of the size of the curtailment zone in the curtailment risk distribution among flexible generation units as well as that of the “access right” defined by the order in which PV units connect to the grid. Case study results reveal that, with a proper selection of curtailment radius, utilities can reduce the total curtailment of flexible PV resources by up to more than 45%. Findings show that non-firm PV generators can effectively avoid all thermal limit-related upgrade costs.
Keywords: renewable integration; distributed PV integration; active network management; PV interconnection agreement renewable integration; distributed PV integration; active network management; PV interconnection agreement

Share and Cite

MDPI and ACS Style

Sedzro, K.S.A.; Horowitz, K.; Jain, A.K.; Ding, F.; Palmintier, B.; Mather, B. Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement. Energies 2021, 14, 1463. https://doi.org/10.3390/en14051463

AMA Style

Sedzro KSA, Horowitz K, Jain AK, Ding F, Palmintier B, Mather B. Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement. Energies. 2021; 14(5):1463. https://doi.org/10.3390/en14051463

Chicago/Turabian Style

Sedzro, Kwami Senam A., Kelsey Horowitz, Akshay K. Jain, Fei Ding, Bryan Palmintier, and Barry Mather. 2021. "Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement" Energies 14, no. 5: 1463. https://doi.org/10.3390/en14051463

APA Style

Sedzro, K. S. A., Horowitz, K., Jain, A. K., Ding, F., Palmintier, B., & Mather, B. (2021). Evaluating the Curtailment Risk of Non-Firm Utility-Scale Solar Photovoltaic Plants under a Novel Last-In First-Out Principle of Access Interconnection Agreement. Energies, 14(5), 1463. https://doi.org/10.3390/en14051463