Correction

Correction: Antonijević, M.; Sučić, S.; Keserica, H. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication. Energies 2018, 11, 599

Končar-Power Plant and Electric Traction Engineering Inc., Fallerovo 22, 10000 Zagreb, Croatia
*
Author to whom correspondence should be addressed.
Energies 2018, 11(9), 2386; https://doi.org/10.3390/en11092386
Submission received: 30 August 2018 / Accepted: 31 August 2018 / Published: 10 September 2018
(This article belongs to the Section F: Electrical Engineering)
The authors wish to make the following corrections to their paper [1]:
On page 15, Figure 15 should be changed from:
To the following correct version:
The authors would like to apologize for any inconvenience caused to the readers by these changes. The changes do not affect the scientific results. The manuscript will be updated and the original will remain online on the article webpage, with a reference to this Correction.

Reference

  1. Antonijević, M.; Sučić, S.; Keserica, H. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication. Energies 2018, 11, 599. [Google Scholar] [CrossRef]
Figure 15. SCADA response time boxplot test results using local VPN and the 4G mobile Internet.
Figure 15. SCADA response time boxplot test results using local VPN and the 4G mobile Internet.
Energies 11 02386 g001
Figure 15. SCADA response time boxplot test results using local VPN and the 4G mobile Internet.
Figure 15. SCADA response time boxplot test results using local VPN and the 4G mobile Internet.
Energies 11 02386 g002

Share and Cite

MDPI and ACS Style

Antonijević, M.; Sučić, S.; Keserica, H. Correction: Antonijević, M.; Sučić, S.; Keserica, H. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication. Energies 2018, 11, 599. Energies 2018, 11, 2386. https://doi.org/10.3390/en11092386

AMA Style

Antonijević M, Sučić S, Keserica H. Correction: Antonijević, M.; Sučić, S.; Keserica, H. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication. Energies 2018, 11, 599. Energies. 2018; 11(9):2386. https://doi.org/10.3390/en11092386

Chicago/Turabian Style

Antonijević, Miro, Stjepan Sučić, and Hrvoje Keserica. 2018. "Correction: Antonijević, M.; Sučić, S.; Keserica, H. Augmented Reality Applications for Substation Management by Utilizing Standards-Compliant SCADA Communication. Energies 2018, 11, 599" Energies 11, no. 9: 2386. https://doi.org/10.3390/en11092386

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.