Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant
Abstract
Share and Cite
Özder, E.H.; Özcan, E.; Eren, T. Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes 2019, 7, 702. https://doi.org/10.3390/pr7100702
Özder EH, Özcan E, Eren T. Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes. 2019; 7(10):702. https://doi.org/10.3390/pr7100702
Chicago/Turabian StyleÖzder, Emir Hüseyin, Evrencan Özcan, and Tamer Eren. 2019. "Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant" Processes 7, no. 10: 702. https://doi.org/10.3390/pr7100702
APA StyleÖzder, E. H., Özcan, E., & Eren, T. (2019). Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes, 7(10), 702. https://doi.org/10.3390/pr7100702

