Next Article in Journal
Prediction of Lithium-ion Battery Thermal Runaway Propagation for Large Scale Applications Fire Hazard Quantification
Next Article in Special Issue
Design of S2N—NEWMA Control Chart for Monitoring Process having Indeterminate Production Data
Previous Article in Journal
Numerical and Experimental Study of a Vortex Structure and Energy Loss in a Novel Self-Priming Pump
Previous Article in Special Issue
Gain Scheduling of a Robust Setpoint Tracking Disturbance Rejection and Aggressiveness Controller for a Nonlinear Process
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant

1
Department of Management Information, Faculty of Commercial Science, Başkent University, Ankara 06790, Turkey
2
Department of Industrial Engineering, Faculty of Engineering, Kırıkkale University, Kırıkkale 71450, Turkey
*
Author to whom correspondence should be addressed.
Processes 2019, 7(10), 702; https://doi.org/10.3390/pr7100702
Submission received: 5 September 2019 / Revised: 29 September 2019 / Accepted: 1 October 2019 / Published: 5 October 2019
(This article belongs to the Special Issue Synergies in Combined Development of Processes and Models)

Abstract

This paper deals with a sustainable personnel scheduling problem of personnel working in a large-scale natural gas combined-cycle power plant in Turkey. The proposed model focuses on employee complaints due to unfair work schedules and the results of balanced assignments based on power plant interruptions. Eighty personnel work in three shifts at this natural gas combined-cycle power plant. The model is solved with respect to some of the workers’ skills, and there are 20 criteria regarding skills. The analytic network process method is used to get the weights of workers’ skills, which are calculated and included in the model. Goal programming is used in this paper. Our proposed model gives cost minimization and fair work schedules for the power plant. Compared with the literature, the number and set of criteria are unique in terms of personnel competency in the energy sector. Minimizing cost and imbalanced assignments was achieved by the proposed model for the first time without considering the sector.
Keywords: skill-based personnel scheduling; analytic network process (ANP); goal programming (GP); optimization; natural gas combined-cycle power plant; electricity generation sector skill-based personnel scheduling; analytic network process (ANP); goal programming (GP); optimization; natural gas combined-cycle power plant; electricity generation sector

Share and Cite

MDPI and ACS Style

Özder, E.H.; Özcan, E.; Eren, T. Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes 2019, 7, 702. https://doi.org/10.3390/pr7100702

AMA Style

Özder EH, Özcan E, Eren T. Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes. 2019; 7(10):702. https://doi.org/10.3390/pr7100702

Chicago/Turabian Style

Özder, Emir Hüseyin, Evrencan Özcan, and Tamer Eren. 2019. "Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant" Processes 7, no. 10: 702. https://doi.org/10.3390/pr7100702

APA Style

Özder, E. H., Özcan, E., & Eren, T. (2019). Sustainable Personnel Scheduling Problem Optimization in a Natural Gas Combined-Cycle Power Plant. Processes, 7(10), 702. https://doi.org/10.3390/pr7100702