Systematic Review

A Systematic Literature Review of Augmented Reality’s Development in Construction

ISEC—Coimbra Institute of Engineering, Polytechnic University of Coimbra, 3030-199 Coimbra, Portugal
*
Author to whom correspondence should be addressed.
Electronics 2026, 15(1), 225; https://doi.org/10.3390/electronics15010225
Submission received: 22 October 2025 / Revised: 21 November 2025 / Accepted: 29 December 2025 / Published: 3 January 2026

Abstract

Augmented reality (AR) has emerged as a transformative technology, allowing users to engage with digital content overlaid on the physical world. In the construction industry, AR shows significant potential to enhance visualization, collaboration, training, and safety across the project lifecycle. This paper presents a systematic literature review (SLR) of 136 publications on the use of AR in construction published between 2019 and 2025, focusing on architectures, technologies, trends, and challenges. The review identifies the main architectures (cloud, hybrid, and local) and examines how AR is combined with Building Information Modeling (BIM) systems, digital twins, the Internet of Things (IoT), and Unmanned Aerial Vehicles (UAVs). Key application trends are identified and discussed, including on-site visualization, inspection and monitoring, immersive training, hazard detection, and remote collaboration. Challenges and constraints to the adoption of AR in construction are highlighted and examined such as hardware limitations, usability and ergonomics issues, interoperability with existing systems, high costs, and resistance to organizational change. By systematizing existing approaches and mapping both opportunities and barriers, this review provides a comprehensive reference for researchers, practitioners, and policy makers aiming to accelerate AR adoption in the construction sector.

1. Introduction

Augmented reality (AR) is clearly gaining significance in our society, starting to be recognized as the next major technological breakthrough. This is demonstrated by AR’s rapid market expansion, projected to grow from USD 140.34 billion in 2025 to USD 1716.37 billion by 2032 [1] and its transformative impact on user experience (driven by its expanding applications across several sectors). The term AR first appeared in the work of Caudell and Mizell [2], although the first AR system was attributed to Ivan Sutherland [3]. However, it was Azuma in his pivotal paper [4] who outlined three requirements to qualify technology or experience as AR: the combination of real and digital content; real-time interaction; and 3D registration, which means digital elements must be aligned with real-world structures. Therefore, with AR, individuals can visualize and interact seamlessly with a mixture of digital and real-world elements, enhancing their perception of sensory information. This can be facilitated through devices such as smartphones, AR glasses, head-mounted displays, projectors, and holographic technology. Context, covering user characteristics, activities, content, purpose, and the surrounding environment plays a critical role in AR.
In the construction industry, AR holds the potential to significantly improve what is visualized on construction sites, such as by overlaying a 3D model of future buildings. This information would foster better decisions and could increase client satisfaction. Collaboration and communication between the stakeholders, as well as safety in the construction sites, could also benefit greatly from AR. This technology could provide a shared visual and audio context, reducing misunderstandings or errors among the working teams and machine operators. Offering training experiences in real-world scenarios with digital equipment (sometimes very expensive) is another potential area that can be enhanced by AR, improving learning outcomes and safety practices. During the construction and inspection phases, and even in maintenance activities, AR could assist with real-time guidance, ensuring, for instance, that the entire process closely follows design specifications. However, while the adoption of AR could offer significant benefits in the construction industry, addressing challenges will be crucial for maximizing its potential. Therefore, the rationale for writing this article is to present the types of architecture used in the construction industry, including associated technologies, along with its current trends and challenges.
This article is organized as follows: Section 2 introduces the followed systematic literature review (SLR) methodology, Section 3 classifies the type of articles analyzed and provides definitions and relevant terminology, Section 4 presents an overview of technologies and architectures, Section 5 examines the trends, Section 6 discusses the challenges, and, finally, Section 7 presents the concluding remarks.

2. Methodology

This section describes, in detail, the process followed in the systematic literature review, which was conducted in accordance with the PRISMA 2020 guidelines [5]. This review was not registered in any database of systematic review protocols, and no formal review protocol was prepared prior to conducting the study.

2.1. Research Questions

The following research questions were raised regarding AR in the construction industry:
  • RQ1. Which types of architectures are used?
  • RQ2. What are the trends and challenges?

2.2. Documentation Source

To find representative literature on AR in the construction industry, the Web of Science (WoS) online research database was used. The key factor for choosing this database was its inclusion of books, journals, conference proceeding, and tools to aid in analysis.

2.3. Search Process

The search was conducted in June 2025, focusing on the intersection of AR and the construction industry. To capture the relevant literature, two search queries were formulated using the OR Boolean operator. The first query was “augmented reality” AND “construction industry”, and the second was “AR” AND “construction industry”. The search was designed to target occurrences of these terms in the title, abstract, or keywords of publications.
The search strategy, screening process, eligibility criteria, and synthesis procedures are summarized in the flow diagram presented in Figure 1. The initial search generated 635 publications. To ensure the review was up-to-date and relevant, only manuscripts published between 2019 and 2025 were considered, leading to the exclusion of older publications. This refinement led to 453 manuscripts. Additionally, duplicate entries were removed, and publications that were either outside the intended area of knowledge or unavailable in full text were discarded. This filtering process resulted in a refined pool of 236 manuscripts.
Subsequently, the abstracts of all these manuscripts were carefully reviewed and classified into three groups: “included,” “excluded,” and “in doubt.” Manuscripts placed in the “in doubt” category underwent a full-text review to determine their final categorization. Through this assessment, a total of 136 manuscripts were ultimately accepted for inclusion in the systematic review.
Five reviewers participated in the screening process. All records were first screened by title and abstract, and disagreements regarding classification into “included,” “excluded,” or “in doubt” categories were resolved during a consensus meeting with all reviewers present. No automation tools were used at any stage of study selection.
Data extraction was performed by five reviewers, each working independently on specific elements of the dataset. Any discrepancies in extracted information were discussed collectively and resolved through consensus during a reviewer meeting. No standardized extraction form was used, no authors of the included studies were contacted for clarification or additional data, and no automation tools were employed during the data extraction process.

2.4. Outcomes and Discussion

For each included study, data were extracted regarding the main outcome domains of interest, namely, (i) technologies and architectures used, (ii) trends, and (iii) challenges addressed by the studies. All results compatible with these domains were collected as reported in each study. In addition to these outcomes, further descriptive variables were extracted, including year of publication, application scenario, and study focus categories. No assumptions were made about missing or unclear information, and such cases were documented without imputation or interpretation.
According to WoS, all the publications analyzed have a total of 3231 citations, including 222 self-citations. The publications have an H-index of twenty-seven (27), meaning there are 27 papers that have each been cited at least 27 times. It is important to highlight that this H-index may be different (probably higher) if other citation databases, such as Scopus or Google Scholar, are used. This indicator reflects the overall impact of the retrieved publications. As shown in Figure 2, citations grew rapidly during the analyzed period (2019 to 2025). Regarding the number of publications per year, there has been a decline in 2023. Of the publications analyzed, manuscripts [6,7,8,9,10,11,12,13,14,15], are the ten (10) most cited, with over one hundred (100) citations each. However, seventeen (17) papers had zero (0) citations. Regarding the references used in the papers, a total of 2341 manuscripts were cited, with 73 manuscripts being self-citations.
All the manuscripts were classified by WoS into forty-one (41) different categories, where the top five (5) categories, encompassing 92.7% of the publications, are Civil Engineering, Construction Building Technology, Multidisciplinary Engineering, Industrial Engineering, and Computer Science Interdisciplinary Applications. Among the analyzed manuscripts, seventy-three (73) are journal articles (55.73%), one (1) is an early access paper (0.76%), sixteen (16) are proceedings papers (12.21%), and forty-two (42) are review articles (32.06%).
Among the analyzed manuscripts related to the Sustainable Development Goals (SDGs), and according to WoS, sixty (60) align with Industry, Innovation, and Infrastructure (45.802%), fifty-eight (58) with Partnerships for the Goals (44.275%), eight (8) with Good Health and Well-Being (6.107%), three (3) with Sustainable Cities and Communities (2.290%), two (2) each with Responsible Consumption and Production and Life on Land (1.527%), and one (1) each with Affordable and Clean Energy and Climate Action (0.763%).
The main countries publishing on the topic of applying AR in the construction industry include the United States, which leads with 41 publications (31.298%). It is followed by the People’s Republic of China with 19 publications (14.504%), Australia with 15 publications (11.450%), and England with 14 publications (10.687%). Other notable contributors are India (5.344%), and Chile, South Africa, and Spain, each with 6 publications (4.580%). Additionally, Austria, Malaysia, New Zealand, and South Korea have each published 5 articles (3.817%), while Germany, Iran, and Italy each contributed 4 articles (3.053%).
Overall, our search shows that the United States, China, and Australia account for about 57% of the publications included in this SLR under the Web of Science search criteria. Most of the remaining studies come from other advanced economies, such as the United Kingdom, Germany, or Italy. With the combination of search terms used and the restriction to this database, we did not identify studies from some countries that regularly appear among the largest construction investment markets worldwide, such as India and Japan, as reported in recent rankings [16,17]. Even so, the geographical concentration observed in the literature broadly reflects the current research output on the application of AR in the construction industry.

2.5. Synthesis Methods

This review did not include statistical or quantitative synthesis. All studies that met the eligibility criteria were included in a narrative synthesis and organized into thematic categories (architectures, AR technologies, device interactions, trends, challenges, and objectives). Data extracted from each study were tabulated and categorized according to predefined outcome domains. No data transformations or conversions were required.
Results were summarized narratively and presented using descriptive tables and figures, including frequency charts illustrating temporal trends and categorical distributions. A narrative synthesis approach was used due to the heterogeneity of study designs, objectives, and reporting formats among the included studies. Meta-analysis and other forms of statistical synthesis were not feasible.
No assessment of statistical heterogeneity or sensitivity analyzes were conducted, as these procedures are only applicable when performing a meta-analysis.

3. Paper Type, Definitions, and Relevant Terminology

The aim of this section is to inform readers and help them select the most relevant papers/articles for their scientific work, that merit closer examination, in accordance with the criteria set out below.
The scientific references identified in this SLR are classified according to content and type of publication and then organized based on their relevance as indicated by citations. Regarding content and type of publication, the papers/articles are classified into three categories: (a) scientific development (original work); (b) surveys or literature reviews, including systematic reviews and questionnaire-based surveys; and (c) references to support the definitions used in the writing of the present paper. Table 1 presents the references grouped into these three categories and ranked within each group based on citation count at the time of writing. Category (b) is divided in the systematic review, literature review, literature survey, review, SLR based on PRISMA (Preferred Reporting Items for Systematic Reviews and Meta-Analyses), review survey, survey questionnaire, and survey paper.
Table 2 shows the annual citation trends for the top three articles in each group, based on Semantic Scholar, considering the number of citations per year since the articles were first cited. Table 3 shows the same information based on WoS for groups (a) and (b).
Table 4 presents some definitions and content extracted from articles classified as ”Original Work” in 2025. It is organized by annual citation count, from highest to lowest, and presents only references classified as “Original work” just for 2025. A condensed version for the period 2019–2025 can be found in Appendix A (Table A1, Table A2 and Table A3).
Table 5 presents some definitions and content extracted from articles classified as ”Survey/Literature review” in 2025. It is organized by annual citation count, from highest to lowest, and presents only references classified as “Survey/Literature review” for 2025. A condensed version for the period 2019–2025 can be found in Appendix B (Table A4, Table A5 and Table A6).

4. Overview of Technologies and Architectures Used

One of the research questions addressed in this study was: “Which types of architectures are used?”. It must be noted that this question inherently captures the underlying technologies. Defining an architecture for the use of AR in the construction context may seem trivial, but it is not. In our systematic review, it was possible to identify the most referenced technologies and architectures used in conjunction with AR. We found that techniques such as Building Information Modeling (BIM), cloud-based systems, visualization devices, and AR tools are widely used. In many cases, these technologies are integrated with geospatial databases (GIS), sensors such as GPS, and platforms like Unity3D or Unreal Engine.
Let us begin by classifying the system as cloud, hybrid, or local. According to our study, most of the analyzed papers propose a hybrid solution. For instance, the authors of [94] propose a GIS database in the cloud that serves as a central repository to store and share information about underground infrastructures among the various stakeholders. This solution is complemented by AR tools that allow contractors to record, design, and analyze the impact of new underground pipelines.
The authors of [8], who also use cloud computing, incorporate IoT devices, drones, and artificial intelligence (AI) integrated with AR into their system. Meanwhile, ref. [134] present, in their study, a hybrid architecture approach, both local and cloud-based, which also incorporates digital twin technology.
A digital twin (DT), according to [10,14,25], is a digital replica of physical assets or systems used to simulate and analyze real-world counterparts. From the perspective of [121], a digital twin is a fundamental part of an AR project and produces a graphical virtual representation of the data input by other components. Some DTs [79] (Figure 3) were obtained using different technologies: IBMR digital photogrammetry (image-based modeling and rendering) based on a digital SLR camera and specialized software (e.g., Canon Mark II 5D, Canon 450D, Agisoft Metashape, RealityCapture); drone-based acquisition (e.g., DJI Phantom 4, DJI Mavic Pro); ALS/TLS (aerial/terrestrial laser scanning) technologies such as Leica BLK360, Faro Focus S150, or GeoSlam Go, combined with Leica Cyclone software; and GPR (ground-penetrating radar). The information captured by these devices was processed using point-cloud algorithms, converted into 3D models, and missing parts were reconstructed with the support of AI-based methods. This workflow enabled the reconstruction of the monument, making both real and virtual visits possible.
It is worth noting that according to [24], Information and Communication Technologies (ICT) also play a role in the architecture of these solutions, due to their contribution to improving construction processes (Figure 4). The same authors also mention that the use of BIM and IoT can be employed to optimize construction processes (Figure 5). According to [41], BIM is a digital representation of the lifecycle data of a facility for decision-making purposes, and according to [49], it integrates data and enhances stakeholder collaboration.
BIM can be integrated with AR and is defined as an approach that involves the generation and management of digital representations of the physical and functional characteristics of buildings and other assets. As for trends in the use of AR in construction, there is a strong presence of AR integration with BIM, with the main goal of improving team communication, project visualization, and problem detection on-site.
Sharing this line of thought, the authors of [117] state that the integration of AR with BIM is used to improve visualization and information flow during the construction process. In turn, ref. [94] used this integration to enhance facility management, as BIM with AR allows for the visualization of hidden utilities and increased efficiency of complex tasks in the post-construction phase. The authors of [134], also in the context of a construction project, use AR, 3D models, and BIM to improve communication and understanding of tasks among stakeholders. Sharing the same point of view, ref. [129] state that AR can be integrated into BIM to provide a more dynamic and comprehensive understanding of project progress and potential issues.
Another example is presented by the authors of [27], who mention that the integration of AR and BIM is improving inspection and defect management in construction projects. According to [116], by integrating the concept of digital twins with AR, this technology can be used to ensure an accurate and real-time representation of projects, enabling precise overlays of 3D models. We can conclude that AR can and should be used during construction to assist workers in understanding and executing tasks on-site [132]. According to [36], the main trends of AR in construction consist of enhanced communication, real-time annotations, remote collaboration, support in training and decision-making, and assistance in selecting choice factors.
Informed decision-making is becoming increasingly important in construction management, yet many digital tools that could support it remain prohibitively expensive for small organizations. Studies on low-cost mobile augmented reality prototypes integrated with BIM [30], which demonstrate their use in pipe maintenance by supporting inspections, workflow management, and on-site data visualization, are therefore particularly important (Figure 6). Feedback from organizations in the UK and South Korea showed that integrating the augmented reality service with building automation tools connected to the BIM server creates a closed loop that significantly enhances on-site decision-making. The findings also highlight the need for affordable digital solutions to drive the digitalization of construction companies operating with limited budgets.
AR has potential applications in various phases of the construction lifecycle, particularly in on-site visualization [117]. The authors of [86] state that AR should be used to improve collaboration and interaction with BIM data, including marker-based AR, a Model–View–Controller (MVC) architecture, and cloud-based systems. In [25], with the aim of visualizing 3D models in real environments for inspections, plan verifications, and building presentations, the authors use and present technologies such as AR, BIM, Construction 4.0, OpenBIM (see Figure 6), IFC, 3D Maps, BAM, REM, IFC files with regulatory information, Unity, QR Codes, mobile devices, and AR glasses.
Going further, the authors of [6] mention that the combined use of BIM with VR, AR, and MR can benefit construction project performance, including time, cost, quality, and safety during the design, construction, and maintenance phases. It is worth noting that these authors refer to VR for design, decision-making, education/training, and safety management in construction; AR to reduce rework, improve safety, lower labor costs, and meet construction deadlines; and MR to assist in design, support education and assembly in construction, improve collaboration and decision-making, and strengthen sustainability analysis.
Regarding technologies, specifically VR glasses, the authors of [36] mention the use of AR technology, specifically the Microsoft Remote Assist application for the HoloLens. According to them, this technology allows on-site staff to communicate in real time with remote users, facilitating discussions and providing real-time annotations. The authors of [110], in their AR project in the construction domain, tested the Microsoft HoloLens and the DAQRI Smart Helmet. According to these authors, these technologies were highlighted due to their significant responsiveness and application in AR research and practice in the sector.
In [24], the proposed AR-based smart FMS was implemented following the defined BPMN workflow and UI specifications, with AR data generation and data-transmission simulation aligned to the maintenance scenario. The prototype application was developed in C# using Unity and PTC Vuforia, and deployed on Android mobile devices. BIM data were based on an IFC2 × 4 model created in Autodesk Revit, from which COBie information was automatically extracted. Marker-based AR visualization was adopted, using QR codes to identify spatial locations and retrieve corresponding COBie maintenance attributes. The overall development process and tools are illustrated in Figure 7.
Using the same technological foundation, [117] present, in their study, the use of AR applications in the various phases of a building’s lifecycle. For this, in their architecture, the authors of [117] use devices such as the Microsoft HoloLens for real-time visualization and remote support and BIM methodology, with positive results. In [22], the authors address several technologies and architectures related to MR and its application in safety communication in construction. For this purpose, the authors use and investigate HoloLens glasses to create a collaborative environment for on-site personnel, visualization technologies to aid safety management by better representing risks and hazards at construction sites, and also address detection technology applicable to construction safety and health.
Another type of technology can be seen in studies such as the integration of Unmanned Aerial Vehicles (UAV) with AR, which is being explored for surveying and data visualization on construction sites [83]. All mentioned technologies can be framed within different architectures, from traditional approaches based on MVC (Model–View–Controller) to more complex architectures such as cyber–physical systems, composed of physical, digital, and real-time data layers.
It is important to highlight that the integration between AR and BIM still faces significant challenges since it is still in an early stage of development, with limitations in terms of maturity and practical applicability, and technical difficulties related to the creation of cloud-based physical infrastructures [12,94]. Despite this, the integration between AR and BIM emerges as the most consistent and recurring trend. Most studies highlight AR’s potential to overlay BIM models onto the physical construction environment, facilitating the visualization of invisible elements, such as buried infrastructures or future construction phases.
The technologies used are often embedded in cloud-based architectures, allowing real-time data management, and in cyber–physical systems that combine physical, digital, and computational layers. An evolution of this approach is the use of digital twins, where the BIM model functions as a virtual replica of what is happening physically on-site, being updated in real time through sensors and AR platforms. The most cited technologies throughout the studies include BIM, AR devices such as head-mounted displays, game engines such as Unity3D and Unreal Engine, cloud platforms, digital twins, IoT, and GPS sensors.
In terms of applicability in the construction context, the most frequent applications are training and safety simulations with realistic hazardous scenarios; project visualization on-site before physical execution; inspection and maintenance assisted by AR, with instructions overlaid on the real environment; and coordination between teams and project communication through interactive models.

5. Trends

As mentioned in the previous section, the SLR reveals a wide variety of AR applications in the construction industry. This allows us to partially answer one of the research questions: “What are the trends and challenges?”. Consistent trends have emerged in areas such as visualization, safety, training, inspection, stakeholder communication, and real-time project monitoring. These trends are described and organized into nine categories in Table 6. Table 7 shows the references to the articles reviewed that directly mention each category of trends.
Integration of AR with BIM, often referred to as BIM-AR, is a central trend in the literature. This integration allows for the visualization of hidden elements, improves project comprehension, and reduces time and costs during design and construction. BIM-AR enables users to overlay 3D models onto real environments to compare planned and built conditions in real time and improve progress tracking and coordination among project stakeholders [20,25,78,82,94,134]. BIM-AR is also seen as a valuable tool in facility management, particularly in visualizing hidden utilities during post-construction phases, thus enhancing efficiency for complex tasks [94]. For example, the BIM-AR system proposed by [20] utilizes a Model–View–Controller (MVC) architecture and cloud-based systems to allow multiple stakeholders (e.g., engineers and architects) to visualize and interact with the same overlaid 3D models on-site, improving design and construction collaboration. The authors of [76] present a smartphone application for AR that aims to provide experts working in architecture, design, and construction with an immersive platform to view and assess prototypes in authentic physical environments.
Integrating AR with digital twins and cyber–physical systems (CPS) is an emerging trend. This bidirectional flow of data between the physical site and the digital model enables real-time synchronization of project progress, anomaly detection, and predictive analytics. Several studies point to the increasing reliance on IoT devices, sensor integration, and environmental data to support these systems [96,116].
Worker training and education are other prevalent applications of AR, which are used to provide immersive training experiences, simulate complex tasks, and deliver safety instructions for entering hazardous environments. According to the revised literature, experiential AR learning improves user engagement, situational awareness, and retention of safety protocols. Real-time feedback and simulation-based learning environments have been shown to significantly enhance learning outcomes and task accuracy in complex scenarios [6,63,97,113]. Furthermore, research has emphasized the potential of AR in reducing training costs and improving the performance of unskilled workers through guided tasks [38,110]. For example, the authors of [63] propose a teaching–learning methodology utilizing an AR tool to facilitate the development and reinforcement of spatial skills among a group of undergraduate civil engineering students (Figure 8). These tools, often built on engines such as Unity, allow civil engineering workers and students to intuitively rotate, inspect, and understand complex architectural models, strengthening their spatial skills [76].
Cognitive and ergonomic aspects of AR in construction are also being investigated by researchers, which emphasizes the importance of user-centered AR design to reduce mental workload and improve usability during physical assembly and inspection tasks. For instance, using different display formats (e.g., 2D overlays vs. 3D conformal models) can show varying impacts on worker performance and decision-making during assembly tasks [37,48,52]. One concrete example is a study that validated a cognitive ergonomics-based AR application for a rebar-tying task [37]. The study compared participants using HoloLens head-mounted displays with those using paper instructions, measuring outcomes such as subjective mental load and kinaesthetic performance (time spent in awkward postures). The aim of the study was to test whether an AR design aligned with workers’ cognitive mechanisms could improve usability and reduce ergonomic strain. The results demonstrated significant efficiency gains and improved kinaesthetic performance.
Construction site safety, closely linked to training, has emerged as a leading AR use case. Numerous studies demonstrate how AR overlays can support hazard detection, safety compliance verification, and real-time warning systems, providing hazard warnings and enforcing safety regulations [10,12,97,113,122]. Globally, AR systems provide visual signals and warnings to construction workers, supported by wearable sensors and real-time data integration. These tools, particularly effective in high-risk environments, are increasingly underpinned by AI and computer vision techniques for continuous monitoring [103,107,134]. For example, the authors of [48] present an innovative eye-tracking-based method, aiming to objectively measure the impact of visual warnings on workers’ situational awareness, using metrics such as time to first fixation (TFF). Figure 9, extracted from [48], illustrates the components of an AR warning system, featuring the Meta UI (User Interface) and Spatial UI used to assist construction workers. The Spatial UI elements merge with real-world objects to delineate hazard zones, while the Meta UI elements function on a separate layer to provide detailed information regarding hazards, including type, direction, and distance.
Integration of AR systems with the IoT enables dynamic monitoring of site conditions and worker status in real-time through environmental sensing, data analysis, and automation [76,96]. This integration allows for context-aware AR applications that dynamically adjust visual overlays based on sensor inputs, such as temperature, material humidity, and location tracking, which is especially useful for maintenance and safety monitoring [116].
Inspection, Monitoring, and Quality Control are key areas where AR is increasingly employed, particularly for automated inspection, real-time monitoring, and the detection and management of defects. The real-time overlays provided by AR help inspectors detect discrepancies more precisely, thereby minimizing the need for rework [27,128,129]. Through mobile AR applications or integration with drones and IoT systems, site managers can overlay progress data, check for compliance, and capture performance metrics without interrupting operations [78,83]. AR tools have also been used to aid in identifying buried utilities and other invisible infrastructure [94]. For example, the authors of [27] propose and evaluate BIM-ARDM, a BIM-AR defect management system designed for construction inspections. The system combines a wearable AR application running on a HoloLens 2 head-mounted display with a tablet application for input and control. With the HoloLens device, inspectors can visualize the 3D BIM model superimposed on the physical construction site at a one-to-one scale, as shown in Figure 10. A key feature is the defect communication mechanism, which provides color-coded feedback to indicate element status: green for correct, yellow for minor defects, and red for major defects.
Project coordination, stakeholder collaboration, and remote workflows are areas where AR enables synchronized, remote communication, often integrating with BIM or digital twin platforms, to facilitate real-time annotations, design reviews, and layout tasks [40,104]. Remote experts can participate in construction processes without being physically present, thereby improving decision-making and reducing delays [74,87].
Mobile AR and UAV-AR integration has expanded the scope of AR from static on-site views to dynamic, spatially aware environments. UAV equipped with AR systems are used for architectural visualization, drone flight path planning, and inspection of hard-to-reach infrastructure [8,67,71]. Mobile AR also continues to gain traction as a low-cost alternative to head-mounted devices (HDM), offering accessibility for field personnel using smartphones and tablets [61,65]. For example, the system proposed by [29] uses AR to scan the environment, plan drone trajectories (using algorithms like Particle Swarm Optimization), and monitor their execution, optimizing internal logistics. Figure 11 presents the AR visualisation from the screen of a mobile device in [29].
Lifecycle integration and maintenance can also be mentioned since AR is now being applied across all phases of the project lifecycle, from initial design to the operation and maintenance phase for real-time monitoring. During the operation and maintenance phase of the construction lifecycle, AR assists facility managers by overlaying digital information on infrastructure and equipment, which makes inspections and repairs easier to carry out and guides maintenance tasks in complex environments [30,132].
Human–robot collaboration on construction sites, where workers and robots operate together, is an area where innovative research has explored the potential of AR to facilitate interaction. AR provides guidance to both parties, thus improving coordination and task efficiency. For example, systems have been implemented to guide both robotic arms and bricklayers during precise construction tasks, such as brick placement and timber beam fabrication [46,75]. The authors of [75] describe a collaborative construction system with a mobile AR application as the primary interface between human workers and robotic collaborators. This system enables real-time interaction by synchronizing the 3D design model with the robots’ actions. Workers use the AR application to preview robot motions, initiate robot tasks, and receive spatially precise instructions for their own manual work, such as placing and tightening mechanical connectors. This allows the system to leverage robotic precision for placing components, while human workers perform tactile tasks.
Lastly, public engagement also demonstrates the increasing potential of AR for communicating complex construction activities to the public, particularly in urban areas. AR tools have been applied to simulate infrastructure impacts, display phased construction plans, and involve citizens in planning decisions [34,56].
These trends suggest that AR is evolving from an experimental tool into a foundational technology of construction technology. The continued development of mobile AR, wearable devices, cloud computing, and real-time data integration is enabling its broader adoption of AR across the industry.

6. Challenges

The adoption of AR in the construction industry faces several challenges that hinder its use in this sector (Figure 12). Usability and ergonomic issues are among the most frequently cited barriers. Hardware limitations in the harsh construction site is also a significant issue. Reliability is a major concern, with several factors undermining AR’s effectiveness. Teamwork negative impact and safety concerns are also commonly cited in the literature. Integration and interoperability with existing information is a major challenge, as well as societal and organizational barriers. The high costs and limited availability of skilled personnel is a very commonly cited challenge. It also is worth noting that the lack of studies about the use of AR in construction was referred to as a barrier. Next, these challenges are examined in detail.
Ergonomics and usability issues are consistently referred to as barriers when using AR technologies and devices in constructions scenarios. The use of AR devices can interfere with the operators’ actions and, in some cases, may require a chaperone [13]. Headsets have been found to have ergonomic issues [135] and most AR devices hinder the operator where using two hands is required [52,97,104]. Generally, AR devices have poor usability in operational scenarios [37]. AR devices, especially headsets, reduce the field of vision or otherwise constrains the operator’s vision [48,97,104,110,122], in particular, for users that have already some form of impairment [39]. Limited rendering resolution or quality is referred on multiple occasions [36,54,130] as well as low accuracy [27,38]. Using AR devices increase the difficulty in switching the focus from virtual to real objects [48,122] and cybersickness (motion sickness) has been associated to the use of AR devices [8]. In general terms, AR hardware is referred at large to affect performance and user experience [38,47]. In simple terms, poor design and usability in AR devices as been linked to low user acceptance [37,128]. Vision and audio are, by far, the most common senses used in AR. However, support for other multi-sensory modalities has been referred as a barrier to the adoption of AR [122]. On the important issue of cognitive load, it is worth noting that using AR devices at the same time as performing construction tasks increases the complexity and cognitive load involved [9,24,47,52,99]. This is an important issue if one considers the complexity of construction projects to begin with, and the possible safety implications of increased complexity in a construction site. To address those issues, several research avenues are identified, including mapping how AR information interacts with attention, memory retrieval, situational awareness, and hazard identification; exploring multimodal notifications (e.g., sound, haptic feedback, etc.) to reduce reliance and overload on visual overlays; improved ergonomic design to improve mobility and reduce vision obstruction; researching hands-free AR interaction modes (e.g., voice and eye-tracking commands); and researching and quantifying how the different AR characteristics (device weight, latency, and framerate) affect cybersickness and perceptual misalignment.
Concerning hardware limitations, it should be noted that the integration of diverse technologies and devices, possibly from diverse vendors and manufacturers, has been found to be a considerable barrier to the adoption of AR in construction [12,34,100]. There is also a lack of a unified industry standard across devices and vendors [26,62,66,96,113] which increases the problem of integration. The need for high computational resources has been referred as a serious barrier [42,44,66]. Energy consumption and battery life has been consistently referred as important barriers that limit the use of AR in construction scenarios [14,25,40,83,97,104,118,128], especially if one considers prolonged periods of use. In general terms, the use of AR in construction requires a reliably power supply and connectivity which is not always available [41,57], and a robust technological infrastructure [56,84,88] which may be unfeasible given the typical reality of companies involved in the construction industry.
Reliability offered by AR devices is poor, concerning several relevant aspects in a construction operational scenario. Connectivity issues in the operational scenario can render the AR devices useless [36,39]. Environmental factors, such as signal coverage, weather, and noise can affect the performance of AR applications [40,104]. Inconsistent lightning hinders AR usability and performance [13,78], and seamless real-world integration is very difficult to achieve under regular operational conditions [24]. AR devices show poor tracking and virtual to real-world objects alignment capabilities [94] and discrepancies between virtual and real elements reduce reliability [43,118]. This is a serious problem as poor tracking causes user inefficiencies [128]. Misalignemnt between real-world context and virtual models require constant adjustment and calibration [14,54,66,90] which is not feasible to perform in a production scenario. Very precise calibration is required in many occasions but those are hard or infeasible to achieve systematically [122]. It is very difficult to achieve real-time accurate sensory perception and latency compromise accuracy [71,116]. In fact, latency is consistently referred to as a problematic issue [50,74,78,84,112,127].
Communication, teamwork, and safety are other concerns since AR can reduce communication between users [99] and hinder tasks requiring multiple operators [7]. In fact, the use of AR in construction scenarios has been associated to increased difficulty in team work: AR devices (e.g., headsets) can limit the user perception of other events occurring and create a sense of isolation [13], creating barriers in sharing experiences and performing collaborative work [11,20,99]. Safety issues were also associated to the use of AR: devices are typically immersive and thus can reduce users’ situational awareness [52,99] which can lead to occupational hazards and danger situations [104,122]. The distraction caused by the use of AR technologies can be a safety issue [10,47], and AR devices may conflict with safety gear [128].
Related to information systems and integration with BIM, data security and privacy concerns have been frequently referred as a concern when considering the adoption of AR in construction [14,34,41,50,62,66,87]. This is not a surprise, as the increased computer infrastructure and data use related to AR will necessarily increase attack surfaces and exposure to cyber-attacks and data leaking. Difficulties in interoperability when integrating AR with existing systems [22,25,42,44,50,62,65,67,78,83,86,88,118], workflows [24,36,41,97,127], and in particular BIM models [11,14,25,26,27,30,31,38,83,89,90,96,101,102,105,109,112,116,124,128,129,137] are consistently referred as a major issue, making integration one of the most commonly cited challenges. The data involved in AR poses challenges: AR typically requires real-time data management, which can be difficult to achieve [10]. The large quantities of data involved raise difficulty in processing [94] and archiving [6,13,104], the latter requiring significant changes to the existing information systems’ technology, and the new data involves an increased level of precision which may be difficult to handle in the existing systems [56]. Data interoperability issues typically involve the need for multiple conversions, requiring moving from native BIM data formats to intermediate formats, and then to formats understood by AR tools. This conversion may cause the loss of semantic information, introduce errors and artifacts due to geometry simplification, and the multiple conversions involve brittle pipelines that are hard to maintain. Open standards (e.g., openBIM) exist but do not provide a direct path from BIM data format to AR data format. System integration is directly affected by the lack of full data interoperability, long toolchains, and brittle workflows. Systems may include diverse tools and data such as BIM, GIS survey data, AR engines, IoT for live data, and data exchange data formats (ICF, BCF, JSON, etc.). Many BIM and AR integration prototypes assume a relatively static model, hindering real-time updates on models and information, Furthermore, latency and bandwidth limitations cause synchronization and consistency issues.
Contextual/societal barriers are often referred to as the result of the lack of specific legal frameworks and government policies on AR usage in construction scenarios, in particular when considering regulatory standards [96] and data privacy and ownership [26,130]. The resistance to new technologies and change is one of the most common challenges to the adoption of AR in construction [9,10,11,14,22,26,34,36,38,41,47,50,56,57,62,74,83,86,87,88,91,96,107,126,127,132]. This encompasses mostly resistance to change, fear of new technologies, and fear of perceived complexity. The construction sector also presents barriers from withing management levels: the sector is traditional and reluctant to adopt new technologies [93,116], posing resistance to change [25,41]. Upper management has been found to lack in awareness and acceptance of AR technologies [11] and changes clash with existing organizational practices [22,24]. Lastly, the industry as a whole also lacks in awareness and acceptance of AR: the construction sector is typically fragmented, and this makes it hard to define standards for the use of AR in the construction [7,25,100,119,137].
High costs have been consistently referred across the literature, making it one of the most common challenges when adopting AR technologies in construction. Typically, companies lack the budget for AR technologies [11,34,43,97,98,104,105]. The cost of the technologies involved is very high [22,26,36,41,54,62,83,86,87,93], and the deployment itself is also very costly [27,28,30,39,60,62,78,84,85,88,89,90,91,100,101,107,112]. The specialized training required for operators before using the new AR technologies and systems also requires a significant investment [28,54,62,67,135]. In general terms, the upfront investment is very high [10,14,31,38,41,47,50,66,74,110,127]. Higher operational costs translate into higher costs to the client, and those typically do not readily accept them [6].
Beyond the widely cited barrier of high upfront costs, such as hardware acquisition, software development, BIM–AR integration, and specialised training, several studies highlight the importance of considering the long-term economic implications of AR adoption [138,139]. Although the literature is still limited in quantitative cost–benefit analyzes, the evidence reviewed suggests that AR has the potential to generate substantial financial savings over a project’s lifecycle. These include reductions in rework through improved visualization and clash detection, shorter project timelines enabled by more efficient inspections and real-time decision-making, decreased labour costs in tasks supported by AR-guided procedures, and fewer safety-related incidents leading to reduced downtime and insurance expenses. However, the absence of standardized frameworks to measure these economic impacts prevents consistent comparison across projects. This highlights the need for future research to include structured economic analyzes, such as ROI assessments, lifecycle costing, and productivity metrics—to more accurately quantify the financial value of AR implementation in construction and support decision-makers in evaluating the real economic viability of AR technologies.
Skill availability is one of the most commonly mentioned challenges when adopting AR in construction. The use of AR requires very specialized skills that are usually not present in the construction team [7,25,31,34,36,38,40,42,66,86,93,96,104,107,111,122,126,129]. There is the need for and innitial training that is either difficult or expensive to integrate into the usual workflow of companies in the sector [41,66,74,83,87,110]. Furthermore, it has been found that lack of the necessary skill set can cause worker exclusion within the team [30,44,56,85].
The need for more studies is noted in several of the surveyed works. Most technologies are still immature or in research phase and the full potential is not yet available [7,56,66], and there is the need for more research on the use of AR in the construction sector, as the technology may not be robust or reliable for widespread adoption [13,62,83,88,127,130]. The economic impact of the use of AR in the construction sector is also referred as one topic that needs to be further studied before widespread adoption [109], and there is the need for more results from actual real-world implementations, as many published data concerns laboratory results [97,128]. User acceptance is also still largely unknown [56] and there is the need for more proper research concerning the impact of the use of AR over the construction’s personnel [29,48]. Overall, AR has been referred as an immature technology when considering its readiness for construction [40].
The findings from the survey concerning the challenges faced when adopting AR in the construction sector show that while AR holds potential in construction, substantial technical, organizational, and economic barriers must be addressed to enable wider adoption. It is worth noting that the challenges noted in the literature are not focused on one field, instead the need for improvement is noted in a wide range of aspects, including technological aspects, management issues, and societal facets (e.g., resistance to change), and academics and experts from several fields must cooperate to realize the full potential of AR in construction.

7. Concluding Remarks

This article presents a SLR of the state of the art of AR applied to the construction industry. The review demonstrates that AR can generate significant value by enhancing visualization, improving accuracy and efficiency, reducing rework and delays, and promoting safer and more sustainable practices through optimized resource use and waste reduction.
Compared with previous reviews, this SLR provides a novel contribution by systematizing the proposed architectures (cloud, hybrid, and local), the most frequently adopted technologies (BIM, digital twins, UAVs, and IoT), and the main emerging trends. This integrated approach enables cross-comparison of solutions and maturity levels, thereby offering a broader understanding of how AR is being incorporated into construction.
We plan to extend this review by including additional databases and search strategies to better capture studies from major construction markets that are currently underrepresented in this investigation.
The findings also have direct implications for professional practice and public policy. Practitioners can use these insights to select technologies aligned with project maturity, while policy makers may support the definition of interoperability standards, the creation of workforce training programs, and the design of incentives for the adoption of lower-cost solutions.
In general, the literature points to AR-BIM integration as one of the most promising directions for improving coordination, communication, and visualization on construction sites. However, the evidence analyzed also shows that this integration is still in an early stage of technological and organizational maturity, requiring additional development, standardization, and large-scale empirical validation before its potential can be realized across the industry.
With respect to trends, AR integration with BIM emerges as the most mature application, widely used for model visualization, on-site inspection, and improved stakeholder communication. In contrast, areas such as human–robot collaboration and applications for smart cities remain largely experimental, requiring further validation in real-world scenarios. AR–BIM integration is frequently presented as a key enabler for more efficient and data-driven construction processes, the evidence collected in this review indicates that this integration remains at an emerging stage of technological maturity. This integration is frequently presented as a key enabler for more efficient and data-driven construction processes, and the evidence collected in this review indicates that this integration remains at an emerging stage of technological maturity.
The challenges identified can be classified into two dimensions: technical and socio-cultural. Technical barriers include usability problems, hardware limitations (battery life, ergonomics, and connectivity), and difficulties in integrating AR with existing information systems such as BIM. Socio-cultural barriers include resistance to change in the sector, scarcity of skilled professionals, and the absence of regulatory frameworks and standards to guide AR adoption in construction. Economic aspects remain insufficiently quantified in the existing literature, indicating the need for future research to develop rigorous cost–benefit evaluation frameworks for AR in construction.
Finally, the construction industry differs from other sectors due to its highly dynamic, fragmented, and unpredictable environment. This unique context demands AR solutions that are more robust and adaptable, compatible with diverse and often non-standardized workflows. Despite these barriers, the prospects are promising: the continuous evolution of AR, together with AI and BIM, points toward smarter, more efficient, and safer construction processes.

Supplementary Materials

The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/electronics15010225/s1, File S1. PRISMA 2020 Checklist [140].

Author Contributions

Conceptualization, N.C.M., J.M., F.S., J.D. and I.F.; methodology, N.C.M., J.M., F.S., J.D. and I.F.; software, not applicable; validation, N.C.M., J.M., F.S., J.D. and I.F.; formal analysis, N.C.M., J.M., F.S., J.D. and I.F.; investigation, N.C.M., J.M., F.S., J.D. and I.F.; resources, N.C.M., J.M., F.S., J.D. and I.F.; data curation, N.C.M., J.M., F.S., J.D. and I.F.; writing—original draft preparation, N.C.M., J.M., F.S., J.D. and I.F.; writing—review and editing, N.C.M., J.M., F.S., J.D. and I.F.; visualization, N.C.M., J.M., F.S., J.D. and I.F.; supervision, N.C.M., J.M., F.S., J.D. and I.F.; project administration, N.C.M., J.M., F.S., J.D. and I.F.; funding acquisition, N.C.M., J.M., F.S., J.D. and I.F. All authors have read and agreed to the published version of the manuscript.

Funding

This research received no external funding.

Data Availability Statement

Data is contained within the article.

Acknowledgments

This work is included in the CRIARTE: Construction with Intelligent Robotics and Revolutionary Architecture of Emerging Technologies project (COMPETE2030-FEDER-01192200), developed within the Innovation and Digital Transition Operational Programme (Portugal 2030) and the European Union.

Conflicts of Interest

The authors declare no conflicts of interest.

Appendix A. Studies Classified as “Original Work”

Table A1. Thematic grouping of studies classified as “Original Work”.
Table A1. Thematic grouping of studies classified as “Original Work”.
ThemeConcepts/Key Ideas/Contributions
AR/VR/MR Adoption and BarriersStudies analyzing adoption factors, drivers, and barriers to AR/VR/MR in construction and AECO industries, using surveys, causal models, situational analysis, or theoretical frameworks.
AR–BIM/Digital Twin IntegrationResearch on combining AR with BIM, 4D/5D models, and digital twins for inspection, defect detection, dimensional compliance, project management, and building submission workflows.
Safety, Training, and AwarenessAR/VR/MR applied to safety hazard assessment, immersive storytelling, gamification, fear-arousal safety training, eye-tracking, situational awareness, communication, and workforce learning.
Human–Robot and AutomationMultimodal interaction for human–robot collaboration, adaptive machines, XR-enabled automation in timber construction, robotic welding cells, and holographic assembly.
Cultural Heritage and ArchitectureAR/VR for cultural heritage documentation and restoration, georeferenced UAV visualisation, holographic assembly, architectural prototyping, and urban authority communication.
Infrastructure and Smart CitiesIoT, AI, XR and digital technologies for pavements, roads, UAV inspection, telecommunications, GIS-enabled mapping, and infrastructure management.
Education and Training (Academic)XR for improving civil engineering students’ spatial skills, AECO training, workforce upskilling, digital learning outcomes, and VR to bridge student–expert gaps.
Accessibility and InclusivityResearch on AR/VR, drones, modular construction, and disability studies in civil engineering and construction to promote inclusive practices.
Mixed/Cross-CuttingBroader Industry 4.0 strategies, integration of digital technologies, resilience models, CPS-enabled collaboration, and systemic approaches to AR adoption.
Table A2. References grouped by theme for studies classified as “Original Work”.
Table A2. References grouped by theme for studies classified as “Original Work”.
ThemeReferences
AR/VR/MR Adoption and Barriers[28,34,42,49,54,55,58,59,60,62,77].
AR–BIM/Digital Twin Integration[18,20,24,25,27,30,33,45,61,65,66,72,73,78].
Safety, Training and Awareness[22,29,31,32,36,37,38,39,40,47,48,52,53,63,64,69,70,72].
Human–Robot and Automation[19,35,46,50,51,68,75].
Cultural Heritage and Architecture[43,51,65,71,76,79].
Infrastructure and Smart Cities[21,29,56,57,67,74].
Education and Training (Academic)[23,32,60,63,64].
Accessibility and Inclusivity[74].
Mixed/Cross-Cutting[9,25,26,41,44,66,80].
Table A3. Multi-thematic studies classified as "Original Work”. “✓” indicates presence in a theme. HR (Human–Robot), Aut. (Automation), CH (Cultural Heritage), Arch (Architecture) Infra (Infrastructure), SC (Smart Cities), EDU (Education), Access (Accessibility), Inc (Inclusivity).
Table A3. Multi-thematic studies classified as "Original Work”. “✓” indicates presence in a theme. HR (Human–Robot), Aut. (Automation), CH (Cultural Heritage), Arch (Architecture) Infra (Infrastructure), SC (Smart Cities), EDU (Education), Access (Accessibility), Inc (Inclusivity).
Ref.AR/VR/MRAR-BIM/DTSafe/TrainHR/Aut.CH/ArchInfra/SCEduAccess/IncMixed
[60]
[32]
[63]
[64]
[72]
[51]
[65]
[74]
[29]
[66]
[25]

Appendix B. Studies Classified as “Survey/Literature Review”

Table A4. Thematic grouping of studies classified as “Survey/Literature review”.
Table A4. Thematic grouping of studies classified as “Survey/Literature review”.
ThemeConcepts/Key Ideas/Contributions
AR ApplicationsAR in construction tasks, safety, productivity, BIM integration, training, on-site inspection, hazard notification, digital twins interface, implementation barriers, adoption drivers
VR ApplicationsVR in construction training, safety, architectural education, robotics learning, human–machine interaction, immersive simulations
Mixed/Extended Reality (XR) ApplicationsCombined VR/AR/MR for construction safety, training, project lifecycle management, human–machine interaction, collaboration, BIM integration, evaluation methods
Digital twins (DTs) and Cyber–Physical Systems (CPS)DT integration for construction lifecycle management, safety, productivity, predictive analytics, smart buildings, Industry 4.0 alignment, CPS frameworks
BIM Integration and InteroperabilityBIM-based AR/VR/MR, IFC standards, data integration, project lifecycle support, evaluation frameworks, maturity assessment
Construction 4.0 and Industry 4.0 TechnologiesIoT, AI, robotics, blockchain, digital twins, VDC, ICT tools, 3D printing, big data, smart site integration, workflow optimization
Safety and ProductivitySafety training, risk prevention, hazard monitoring, ergonomics, productivity evaluation, knowledge transfer, site management
Education and TrainingPedagogical enhancement, skills development, architectural/engineering education, robotics learning, adaptive learning systems
Methodology/Review FocusSystematic reviews, PRISMA, literature surveys, scientometric analyzes, bibliometric studies, quantitative analysis, questionnaire-based studies, conceptual frameworks
Table A5. References grouped by theme for studies classified as “Survey/Literature review”.
Table A5. References grouped by theme for studies classified as “Survey/Literature review”.
ThemeReferences
AR Applications[6,11,13,81,92,93,97,104,107,108,114,117,125,135]
VR Applications[81,85,90,102,105,126,133,137]
XR Applications[84,91,98,101,112,113,122,123,127,131]
Digital Twins and CPS[10,12,14,83,94,115,118]
BIM Integration[7,82,87,109,110,112,114,119,120,124]
Construction 4.0 and Industry 4.0[8,12,15,88,89,95,100,131,132,134]
Safety and Productivity[10,13,86,93,96,103,106,107,108,111,113,116,117,126,128,129]
Education and Training[90,91,102,105,133,137]
Methodology/Review Focus[15,83,98,99,101,103,112,121,125,130,132,136]
Table A6. Multi-thematic studies classified as ”Survey/Literature review”. “✓” indicates presence in a theme.
Table A6. Multi-thematic studies classified as ”Survey/Literature review”. “✓” indicates presence in a theme.
Ref.ARVRXRDT/CPSBIMC/I4.0Saf.Edu/TrainMet.
[93]
[81]
[102]
[112]
[126]
[13]
[103]
[90]
[105]
[10]
[107]
[131]
[132]
[113]
[117]
[91]
[133]
[101]
[125]
[137]
[114]
[108]
[12]
[98]

References

  1. Fortune Business Insights. Augmented Reality (AR) Market Size, Share & Industry Analysis, By Industry (Gaming, Media, Automotive, Retail, Healthcare, Education, Manufacturing, Real Estate/Architecture Design, Defense & Aerospace, Art & Designing, Law Enforcement (Government, Logistics)), By Application (Interactive Showroom, Driving Experience, Virtual Fitting Room, Brand Engagement, Space Visualization and Virtual Tours), and Regional Forecast, 2025–2032. Available online: https://www.fortunebusinessinsights.com/augmented-reality-ar-market-102553 (accessed on 21 October 2025).
  2. Caudell, T.; Mizell, D.W. Augmented Reality: An Application of Heads-Up Display Technology to Manual Manufacturing Processes. In Proceedings of the Hawaii International Conference on System Sciences, Kauai, HI, USA, 7–10 January 1992; ACM SIGCHI Bulletin; Volume 2, pp. 659–669. [Google Scholar]
  3. Sutherland, I.E. A Head-Mounted Three-Dimensional Display. In Proceedings of the Fall Joint Computer Conference, Part I, San Francisco, CA, USA, 9–11 December 1968; pp. 757–764. [Google Scholar]
  4. Azuma, R.T. A Survey of Augmented Reality. Presence Teleoperators Virtual Environ. 1997, 6, 355–385. [Google Scholar] [CrossRef]
  5. Kitchenham, B. Procedures for Performing Systematic Reviews; Technical Report 33; Keele University: Keele, UK, 2004. [Google Scholar]
  6. Alizadehsalehi, S.; Hadavi, A.; Huang, J.C. From BIM to extended reality in AEC industry. Autom. Constr. 2020, 116, 1–13. [Google Scholar] [CrossRef]
  7. Delgado, J.M.D.; Oyedele, L.; Demian, P.; Beach, T. A research agenda for augmented and virtual reality in architecture, engineering and construction. Adv. Eng. Inform. 2020, 45, 101122. [Google Scholar] [CrossRef]
  8. Forcael, E.; Ferrari, I.; Opazo-Vega, A.; Pulido-Arcas, J.A. Construction 4.0: A Literature Review. Sustainability 2020, 12, 9755. [Google Scholar] [CrossRef]
  9. Turner, C.J.; Oyekan, O.; Stergioulas, L.; Griffin, D. Utilizing Industry 4.0 on the Construction Site: Challenges and Opportunities. IEEE Trans. Ind. Inform. 2021, 17, 746–756. [Google Scholar] [CrossRef]
  10. Hou, L.; Wu, S.; Zhang, G.K.; Tan, Y.; Wang, X. Literature Review of Digital Twins Applications in Construction Workforce Safety. Appl. Sci. 2021, 11, 339. [Google Scholar] [CrossRef]
  11. Noghabaei, M.; Heydarian, A.; Balali, V.; Han, K. Trend Analysis on Adoption of Virtual and Augmented Reality in the Architecture, Engineering, and Construction Industry. Data 2020, 5, 26. [Google Scholar] [CrossRef]
  12. You, Z.; Feng, L. Integration of Industry 4.0 Related Technologies in Construction Industry: A Framework of Cyber-Physical System. IEEE Access 2020, 8, 122908–122922. [Google Scholar] [CrossRef]
  13. Davila Delgado, J.M.; Oyedele, L.; Beach, T.; Demian, P. Augmented and Virtual Reality in Construction: Drivers and Limitations for Industry Adoption. J. Constr. Eng. Manag. 2020, 146, 04020079. [Google Scholar] [CrossRef]
  14. Coupry, C.; Noblecourt, S.; Richard, P.; Baudry, D.; Bigaud, D. BIM-Based Digital Twin and XR Devices to Improve Maintenance Procedures in Smart Buildings: A Literature Review. Appl. Sci. 2021, 11, 6810. [Google Scholar] [CrossRef]
  15. Edirisinghe, R. Digital skin of the construction site Smart sensor technologies towards the future smart construction site. Eng. Constr. Archit. Manag. 2019, 26, 184–223. [Google Scholar] [CrossRef]
  16. Building Radar GmbH. Which Countries Spend the Most on Construction? Available online: https://www.buildingradar.com/construction-blog/which-countries-spend-the-most-on-construction/ (accessed on 16 November 2025).
  17. Royal Institution of Chartered Surveyors. Global Construction Monitor: Q4 2023. Technical Report, RICS. 2023. Available online: https://www.rics.org/content/dam/ricsglobal/documents/market-surveys/global-construction-monitors/rics-global-construction-monitor-q4-2023.pdf (accessed on 16 November 2025).
  18. Ratajczak, J.; Riedl, M.; Matt, D.T. BIM-based and AR Application Combined with Location-Based Management System for the Improvement of the Construction Performance. Buildings 2019, 9, 118. [Google Scholar] [CrossRef]
  19. Tavares, P.; Costa, C.M.; Rocha, L.; Malaca, P.; Costa, P.; Moreira, A.P.; Sousa, A.; Veiga, G. Collaborative Welding System using BIM for Robotic Reprogramming and Spatial Augmented Reality. Autom. Constr. 2019, 106, 102825. [Google Scholar] [CrossRef]
  20. Garbett, J.; Hartley, T.; Heesom, D. A multi-user collaborative BIM-AR system to support design and construction. Autom. Constr. 2021, 122, 103487. [Google Scholar] [CrossRef]
  21. Fenais, A.; Ariaratnam, S.T.; Ayer, S.K.; Smilovsky, N. Integrating Geographic Information Systems and Augmented Reality for Mapping Underground Utilities. Infrastructures 2019, 4, 60. [Google Scholar] [CrossRef]
  22. Dai, F.; Olorunfemi, A.; Peng, W.; Cao, D.; Luo, X. Can mixed reality enhance safety communication on construction sites? An industry perspective. Saf. Sci. 2021, 133, 105009. [Google Scholar] [CrossRef]
  23. Wu, W.; Hartless, J.; Tesei, A.; Gunji, V.; Ayer, S.; London, J. Design Assessment in Virtual and Mixed Reality Environments: Comparison of Novices and Experts. J. Constr. Eng. Manag. 2019, 145, 04019049. [Google Scholar] [CrossRef]
  24. Chung, S.; Cho, C.S.; Song, J.; Lee, K.; Lee, S.; Kwon, S. Smart Facility Management System Based on Open BIM and Augmented Reality Technology. Appl. Sci. 2021, 11, 10283. [Google Scholar] [CrossRef]
  25. Schranz, C.; Urban, H.; Gerger, A. Potentials of Augmented Reality in a bim Based Building Submission Process. J. Inf. Technol. Constr. 2021, 26, 441–457. [Google Scholar] [CrossRef]
  26. Manzoor, B.; Othman, I.; Pomares, J.C.; Chong, H.Y. A Research Framework of Mitigating Construction Accidents in High-Rise Building Projects via Integrating Building Information Modeling with Emerging Digital Technologies. Appl. Sci. 2021, 11, 8359. [Google Scholar] [CrossRef]
  27. May, K.W.; Chandani, K.C.; Ochoa, J.J.; Gu, N.; Walsh, J.; Smith, R.T.; Thomas, B.H. The Identification, Development, and Evaluation of BIM-ARDM: A BIM-Based AR Defect Management System for Construction Inspections. Buildings 2022, 12, 140. [Google Scholar] [CrossRef]
  28. Aghimien, D.; Ngcobo, N.; Aigbavboa, C.; Dixit, S.; Vatin, N.I.; Kampani, S.; Khera, G.S. Barriers to Digital Technology Deployment in Value Management Practice. Buildings 2022, 12, 731. [Google Scholar] [CrossRef]
  29. Mourtzis, D.; Angelopoulos, J.; Panopoulos, N. Unmanned Aerial Vehicle (UAV) path planning and control assisted by Augmented Reality (AR): The case of indoor drones. Int. J. Prod. Res. 2024, 62, 3361–3382. [Google Scholar] [CrossRef]
  30. Um, J.; Park, J.M.; Park, S.Y.; Yilmaz, G. Low-cost mobile augmented reality service for building information modeling. Autom. Constr. 2023, 146, 104662. [Google Scholar] [CrossRef]
  31. Ramos-Hurtado, J.; Munoz-La Rivera, F.; Mora-Serrano, J.; Deraemaeker, A.; Valero, I. Proposal for the Deployment of an Augmented Reality Tool for Construction Safety Inspection. Buildings 2022, 12, 500. [Google Scholar] [CrossRef]
  32. Bademosi, F.; Blinn, N.; Issa, R.R.A. Use of augmented reality technology to enhance comprehension of construction assemblies. J. Inf. Technol. Constr. 2019, 24, 58–79. [Google Scholar]
  33. Chai, C.; Mustafa, K.; Kuppusamy, S.; Yusof, A.; Soon Han Wai, C.S.L. BIM Integration in Augmented Reality Model. Int. J. Technol. 2019, 10, 1266–1275. [Google Scholar] [CrossRef]
  34. Hadavi, A.; Alizadehsalehi, S. From BIM to metaverse for AEC industry. Autom. Constr. 2024, 160, 105248. [Google Scholar] [CrossRef]
  35. Xia, P.; Xu, F.; Song, Z.; Li, S.; Du, J. Sensory augmentation for subsea robot teleoperation. Comput. Ind. 2023, 145, 103836. [Google Scholar] [CrossRef]
  36. Harikrishnan, A.; Abdallah, A.S.; Ayer, S.K.; El Asmar, M.; Tang, P. Feasibility of augmented reality technology for communication in the construction industry. Adv. Eng. Inform. 2021, 50, 101363. [Google Scholar] [CrossRef]
  37. Wu, S.; Hou, L.; Chen, H.; Zhang, G.K.; Zou, Y.; Tushar, Q. Cognitive ergonomics-based Augmented Reality application for construction performance. Autom. Constr. 2023, 149, 104802. [Google Scholar] [CrossRef]
  38. Chalhoub, J.; Ayer, S.K.; Ariaratnam, S.T. Augmented reality for enabling un- and under-trained individuals to complete specialty construction tasks. J. Inf. Technol. Constr. 2021, 26, 128–143. [Google Scholar] [CrossRef]
  39. Bes, P.; Strzalkowski, P. Analysis of the Effectiveness of Safety Training Methods. Sustainability 2024, 16, 2732. [Google Scholar] [CrossRef]
  40. Kyaw, A.H.; Xu, A.H.; Jahn, G.; van den Berg, N.; Newnham, C.; Zivkovic, S. Augmented Reality for high precision fabrication of Glued Laminated Timber beams. Autom. Constr. 2023, 152, 104912. [Google Scholar] [CrossRef]
  41. Nassereddine, H.; Seo, K.W.; Rybkowski, Z.K.; Schranz, C.; Urban, H. Propositions for a Resilient, Post-COVID-19 Future for the AEC Industry. Front. Built Environ. 2021, 7, 687021. [Google Scholar] [CrossRef]
  42. Irfan, M.; Rauniyar, A.; Hu, J.; Singh, A.K.; Chandra, S.S. Modeling barriers to the adoption of metaverse in the construction industry: An application of fuzzy-DEMATEL approach. Appl. Soft Comput. 2024, 167, 112180. [Google Scholar] [CrossRef]
  43. Gerger, A.; Urban, H.; Schranz, C. Augmented Reality for Building Authorities: A Use Case Study in Austria. Buildings 2023, 13, 1462. [Google Scholar] [CrossRef]
  44. Kim, J.; Jeong, J. Design and Implementation of OPC UA-Based VR/AR Collaboration Model Using CPS Server for VR Engineering Process. Appl. Sci. 2022, 12, 7534. [Google Scholar] [CrossRef]
  45. Pan, N.H.; Isnaeni, N.N. Integration of Augmented Reality and Building Information Modeling for Enhanced Construction Inspection-A Case Study. Buildings 2024, 14, 612. [Google Scholar] [CrossRef]
  46. Park, S.; Menassa, C.C.; Kamat, V.R. Integrating Large Language Models with Multimodal Virtual Reality Interfaces to Support Collaborative Human-Robot Construction Work. J. Comput. Civ. Eng. 2025, 39, 04024053. [Google Scholar] [CrossRef]
  47. Hoang, T.; Greuter, S.; Taylor, S.; Aranda, G.; Mulvany, G.T. An Evaluation of Virtual Reality for Fear Arousal Safety Training in the Construction Industry. In Proceedings of the 2021 IEEE International Symposium on Mixed and Augmented Reality Adjunct Proceedings (ISMAR-ADJUNCT 2021), Bari, Italy, 4–8 October 2021; pp. 177–182. [Google Scholar] [CrossRef]
  48. Wu, S.; Chen, H.; Hou, L.; Zhang, G.K.; Li, C.Q. Using Eye-Tracking to Measure Worker Situation Awareness in Augmented Reality. Autom. Constr. 2024, 165, 105582. [Google Scholar] [CrossRef]
  49. Addy, M.N.; Kwofie, T.E.E.; Agbonani, D.M.; Essegbey, A.E.E. Using the TOE theoretical framework to study the adoption of BIM-AR in a developing country: The case of Ghana. J. Eng. Des. Technol. 2024, 22, 1913–1935. [Google Scholar] [CrossRef]
  50. Kaiser, B.; Strobel, T.; Verl, A. Human-Robot Collaborative Workflows for Reconfigurable Fabrication Systems in Timber Prefabrication using Augmented Reality. In Proceedings of the 2021 27th International Conference on Mechatronics and Machine Vision in Practice (M2VIP), Shanghai, China, 26–28 November 2021. [Google Scholar] [CrossRef]
  51. Kontovourkis, O.; Georgiou, C.; Stroumpoulis, A.; Kounnis, C.; Dionyses, C.; Bagdati, S. Implementing Augmented Reality for the Holographic Assembly of a Modular Shading Device. In Proceedings of the 37th Conference on Education-and-Research-in-Computer-Aided-Architectural-Design-in-Europe (eCAADe)/23rd Conference of the Iberoamerican-Society-Digital-Graphics (SIGraDi), Univ Porto, Fac Architecture, Porto, Portugal, 11–13 September 2019. [Google Scholar]
  52. Qin, Y.; Bloomquist, E.; Bulbul, T.; Gabbard, J. Measuring The Impacts of Ar Hmd on Users’ Situation Awareness During Wood Frame Assembly Tasks. J. Inf. Technol. Constr. 2023, 28, 70–86. [Google Scholar] [CrossRef]
  53. El Kassis, R.; Ayer, S.K.; El Asmar, M.; Tang, P. Augmented Reality Communication on Active Construction Sites: A Pilot Study Exploring Non-Technological Factors. In Proceedings of the Construction Research Congress (CRC) on Project Management and Delivery, Contracts, and Design and Materials, Via Dept Civil & Environm Engn, Vecellio Construct Engn & Management Progr, Arlington, VA, USA, 9–12 March 2022; pp. 1202–1211. [Google Scholar]
  54. Vo, K.H.T. Augmented reality, virtual reality, and mixed reality: A pragmatic view from diffusion of innovation. Int. J. Archit. Comput. 2025, 23, 27–45. [Google Scholar] [CrossRef]
  55. Wortmeier, A.K.; Sousa Calepso, A.; Kropp, C.; Sedlmair, M.; Weiskopf, D. Configuring augmented reality users: Analysing YouTube commercials to understand industry expectations. Behav. Inf. Technol. 2024, 43, 371–386. [Google Scholar] [CrossRef]
  56. Furtado, L.S.; Bessa, I.S.; Gurjao, N.d.O.; Soares, J.B. Integrating smart city technologies for sustainable pavement infrastructure. Can. J. Civ. Eng. 2025, 52, 569–582. [Google Scholar] [CrossRef]
  57. Mohamed, M.; Tran, D. Exploring the Use of Mobile Technologies for Highway Construction Inspection. In Proceedings of the Construction Research Congress (CRC) on Project Management and Delivery, Contracts, and Design and Materials, Via Dept Civil & Environm Engn, Vecellio Construct Engn & Management Progr, Arlington, VA, USA, 9–12 March 2022; pp. 689–697. [Google Scholar]
  58. Senanayake, S.M.A.H.; Gunawardana, P.A.M.; Perera, B.A.K.S.; Rajaratnam, D. Examining the potential use of augmented reality in construction cost management tools and techniques. J. Eng. Des. Technol. 2024, 22, 1847–1869. [Google Scholar] [CrossRef]
  59. Shafei, H.; Rahman, R.A.; Lee, Y.S.; Ibrahim, C.K.I.C. Implications of Construction 4.0 technologies to enhancing well-being: A fuzzy TOPSIS evaluation. Constr. Innov. 2025, 25, 131–165. [Google Scholar] [CrossRef]
  60. Akinradewo, O.; Hafez, M.; Aigbavboa, C.; Ebekozien, A.; Adekunle, P.; Otasowie, O. Innovating Built Environment Education to Achieve SDG 4: Key Drivers for Integrating Augmented Reality Technologies. Sustainability 2024, 16, 8315. [Google Scholar] [CrossRef]
  61. Alhady, A.; Alanany, M.; Khodair, Y.; Salem, S.; El Maghraby, Y. Integrating building information modelling (BIM) and extended reality (XR) in the transportation infrastructure industry. Adv. Bridge Eng. 2024, 5, 22. [Google Scholar] [CrossRef]
  62. Classen, H.; Bartels, N.; Riedlinger, U.; Oppermann, L. Transformation of the AECO industry through the metaverse: Potentials and challenges. Discov. Appl. Sci. 2024, 6, 461. [Google Scholar] [CrossRef]
  63. Garcia, L.A.; Velarde, K.G.; Torres, A.F.L. Augmented Reality for the Development and Reinforcement of Spatial Skills: A Case Applied to Civil Engineering Students. Int. J. Eng. Pedagog. 2024, 14, 88–108. [Google Scholar] [CrossRef]
  64. Isingizwe, J.; Eiris, R.; Al-Bayati, A.J. Enhancing safety training engagement through immersive storytelling: A case study in the residential construction. Saf. Sci. 2024, 179, 106631. [Google Scholar] [CrossRef]
  65. Linares-Garcia, D.A.; Flores-Linares, G.; Roofigari-Esfahan, N. Framework and Case Studies for Context-Aware AR System (CaARS) for Ubiquitous Applications in the AEC Industry. In Proceedings of the Construction Research Congress (CRC) on Project Management and Delivery, Contracts, and Design and Materials, Via Dept Civil & Environm Engn, Vecellio Construct Engn & Management Progr, Arlington, VA, USA, 9–12 March 2022; pp. 1278–1288. [Google Scholar]
  66. Nassereddine, H.; Schranz, C.; Hatoum, M.B.; Urban, H. Mapping the capabilities and benefits of AR construction use-cases: A comprehensive map. Organ. Technol. Manag. Constr. 2022, 14, 2571–2582. [Google Scholar] [CrossRef]
  67. Palma, V.; Spallone, R.; Cicone, G.; Lops, G.; Rinauro, R. Scalable ar for bim on Telecommunication Network Sites. In Proceedings of the 9th International Workshop on 3D-ARCH 3D Virtual Reconstruction and Visualization of Complex Architectures, Mantua, Italy, 2–4 March 2022; Fregonese, L., Fassi, F., Remondino, F., Eds.; Volume 46-2, pp. 409–414. [Google Scholar] [CrossRef]
  68. Piaia, E.; Turillazzi, B.; Di Giulio, R.; Sebastian, R. Advancing the Decarbonization of the Construction Sector: Lifecycle Quality and Performance Assurance of Nearly Zero-Energy Buildings. Sustainability 2024, 16, 3687. [Google Scholar] [CrossRef]
  69. Tayebi, A.; Abbasianjahromi, H.; Aghakarimi, M. Using a hybrid method to assess the consequence of hazards on the project success factors. Eng. Constr. Archit. Manag. 2025; ahead-of-print. [Google Scholar] [CrossRef]
  70. Nguyen, L.; Htet, H.T.; Lee, Y.J.; Park, M.W. Augmented Reality Framework for Retrieving Information of Moving Objects on Construction Sites. Buildings 2024, 14, 2089. [Google Scholar] [CrossRef]
  71. Assumpcao, J.P.F.; Cuperschmid, A.R.M. Exploring Georeferenced Augmented Reality for Architectural Visualization with Unmanned Aerial Vehicles. ISPRS Int. J. GEO-Inf. 2024, 13, 389. [Google Scholar] [CrossRef]
  72. Komolafe, O.O.; Waugh, L.; Brett, C.A.; Lei, Z.; Bateman, S.; Pournasir, P.; Rea, D.J. The Effect of Augmented Reality on Performance, Task Loading, and Situation Awareness in Construction Inspection Tasks. In Proceedings of the 12th Symposium on Spatial User Interaction (SUI), Trier, Germany, 7–8 October 2024. [Google Scholar] [CrossRef]
  73. Lee, M.S.Z.; Yabuki, N.; Fukuda, T. Scene Understanding for Dimensional Compliance Checks in Mixed-Reality. Civileng 2024, 5, 1–29. [Google Scholar] [CrossRef]
  74. McCall, C.; Simmons, D.R. Exploring Disciplinary Technologies for Increased Accessibility in the Civil Engineering and Construction Industry: Starting the Conversation. In Advances in the Human Side of Service Engineering; Leitner, C., Ganz, W., Satterfield, D., Bassano, C., Eds.; Springer: Cham, Switzerland, 2021; pp. 331–337. [Google Scholar] [CrossRef]
  75. Mitterberger, D.; Doerfler, K. Rethinking Digital Construction: A Collaborative Future of Humans, Machines and Craft. Archit. Des. 2024, 94, 108–117. [Google Scholar] [CrossRef]
  76. Ramprasad, R.; Priya, S.R.; Narayanan, J. Augmenting Blueprints: A Mobile AR Viewer for Architectural Prototypes. In Proceedings of the International Conference on Advances in Computing, Communication and Applied Informatics (ACCAI), Chennai, India, 9–10 May 2024. [Google Scholar] [CrossRef]
  77. Skubs, D.; Cuperschmid, A.R.M. Hmds for Augmented Reality In Aeco: Fundamental Features for Device Selection. Arquitetura Rev. 2022, 18, 160–182. [Google Scholar] [CrossRef]
  78. Suo, J.; Waje, S.; Gunturu, V.K.T.; Patlolla, A.; Martani, C.; Dib, H.N. The rise of digitalization in constructions: State-of-the-art in the use of sensing technology for advanced building-assistance systems. Front. Built Environ. 2024, 10, 1378699. [Google Scholar] [CrossRef]
  79. Pavelka, K., Jr.; Pavelka, K.; Beloch, L. A Reconstruction of the Shrine of the Prophet Nahum: An Analysis of 3D Documentation Methods and Data Transfer Technology for Virtual and Augmented Realities. Appl. Sci. 2025, 15, 1000. [Google Scholar] [CrossRef]
  80. Lobo, L.; Uzcátegui, J. Modelo conceptual de análisis de fallas para edificios basado en WSN, BIM y realidad aumentada móvil, Conceptual model of fault analysis for buildings based in WSN, BIM and mobile augmented reality. Cienc. Ing. 2019, 40, 209–219. [Google Scholar]
  81. Ahmed, S. A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management. Organ. Technol. Manag. Constr. Int. J. 2019, 11, 1839–1852. [Google Scholar] [CrossRef]
  82. Elshafey, A.; Saar, C.C.; Aminudin, E.B.; Gheisari, M.; Usmani, A. Technology acceptance model for augmented reality and building information modeling integration in the construction industry. J. Inf. Technol. Constr. 2020, 25, 161–172. [Google Scholar] [CrossRef]
  83. Elghaish, F.; Matarneh, S.; Talebi, S.; Kagioglou, M.; Hosseini, M.R.; Abrishami, S. Toward digitalization in the construction industry with immersive and drones technologies: A critical literature review. Smart Sustain. Built Environ. 2021, 10, 345–363. [Google Scholar] [CrossRef]
  84. Cardenas-Robledo, L.A.; Hernandez-Uribe, O.; Reta, C.; Cantoral-Ceballos, J.A. Extended reality applications in industry 4.0.—A systematic literature review. Telemat. Inform. 2022, 73, 101863. [Google Scholar] [CrossRef]
  85. Rokooei, S.; Shojaei, A.; Alvanchi, A.; Azad, R.; Didehvar, N. Virtual reality application for construction safety training. Saf. Sci. 2023, 157, 105925. [Google Scholar] [CrossRef]
  86. Afzal, M.; Shafiq, M.T.; Al Jassmi, H. Improving Construction Safety with Virtual-Design Construction Technologies—A review. J. Inf. Technol. Constr. 2021, 26, 319–340. [Google Scholar] [CrossRef]
  87. Prebanic, K.R.; Vukomanovic, M. Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry. Sustainability 2021, 13, 12690. [Google Scholar] [CrossRef]
  88. Srivastava, A.; Jawaid, S.; Singh, R.; Gehlot, A.; Akram, S.V.; Priyadarshi, N.; Khan, B. Imperative Role of Technology Intervention and Implementation for Automation in the Construction Industry. Adv. Civ. Eng. 2022, 2022, 6716987. [Google Scholar] [CrossRef]
  89. Catbas, F.N.; Luleci, F.; Zakaria, M.; Bagci, U.; LaViola, J.J., Jr.; Cruz-Neira, C.; Reiners, D. Extended Reality (XR) for Condition Assessment of Civil Engineering Structures: A Literature Review. Sensors 2022, 22, 9560. [Google Scholar] [CrossRef]
  90. Hajirasouli, A.; Banihashemi, S.; Drogemuller, R.; Fazeli, A.; Mohandes, S.R. Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Constr. Innov. 2022, 22, 412–443. [Google Scholar] [CrossRef]
  91. Okoro, C.S.; Nnaji, C.; Adediran, A. Determinants of immersive technology acceptance in the construction industry: Management perspective. Eng. Constr. Archit. Manag. 2023, 30, 2645–2668. [Google Scholar] [CrossRef]
  92. Nassereddine, H.; Hanna, A.S.; Veeramani, D.; Lotfallah, W. Augmented Reality in the Construction Industry: Use-Cases, Benefits, Obstacles, and Future Trends. Front. Built Environ. 2022, 8, 730094. [Google Scholar] [CrossRef]
  93. Adebowale, O.J.; Agumba, J.N. Applications of augmented reality for construction productivity improvement: A systematic review. Smart Sustain. Built Environ. 2024, 13, 479–495. [Google Scholar] [CrossRef]
  94. Fenais, A.S.; Ariaratnam, S.T.; Ayer, S.K.; Smilovsky, N. A review of augmented reality applied to underground construction. J. Inf. Technol. Constr. 2020, 25, 308–324. [Google Scholar] [CrossRef]
  95. Rahman, M.H.; Ghasemi, A.; Dai, F.; Ryu, J. Review of Emerging Technologies for Reducing Ergonomic Hazards in Construction Workplaces. Buildings 2023, 13, 2967. [Google Scholar] [CrossRef]
  96. Guray, T.S.; Kismet, B. VR and AR in construction management research: Bibliometric and descriptive analyses. Smart Sustain. Built Environ. 2023, 12, 635–659. [Google Scholar] [CrossRef]
  97. Alkan, I.B.; Basaga, H.B. Augmented reality technologies in construction project assembly phases. Autom. Constr. 2023, 156, 105107. [Google Scholar] [CrossRef]
  98. Zoleykani, M.J.; Abbasianjahromi, H.; Banihashemi, S.; Tabadkani, S.A.; Hajirasouli, A. Extended reality (XR) technologies in the construction safety: Systematic review and analysis. Constr. Innov. 2024, 24, 1137–1164. [Google Scholar] [CrossRef]
  99. van den Oever, F.; Fjeld, M.; Saetrevik, B. A Systematic Literature Review of Augmented Reality for Maritime Collaboration. Int. J. Hum.-Comput. Interact. 2024, 40, 4116–4131. [Google Scholar] [CrossRef]
  100. Negi, P.; Singh, R.; Gehlot, A.; Kathuria, S.; Thakur, A.K.; Gupta, L.R.; Abbas, M. Specific Soft Computing Strategies for the Digitalization of Infrastructure and its Sustainability: A Comprehensive Analysis. Arch. Comput. Methods Eng. 2024, 31, 1341–1362. [Google Scholar] [CrossRef]
  101. Salinas, D.; Munoz-La Rivera, F.; Mora-Serrano, J. Critical Analysis of the Evaluation Methods of Extended Reality (XR) Experiences for Construction Safety. Int. J. Environ. Res. Public Health 2022, 19, 15272. [Google Scholar] [CrossRef]
  102. Akindele, N.; Taiwo, R.; Sarvari, H.; Oluleye, B.I.; Awodele, I.A.; Olaniran, T.O. A state-of-the-art analysis of virtual reality applications in construction health and safety. Results Eng. 2024, 23, 102382. [Google Scholar] [CrossRef]
  103. Gong, P.; Lu, Y.; Lovreglio, R.; Lv, X.; Chi, Z. Applications and effectiveness of augmented reality in safety training: A systematic literature review and meta-analysis. Saf. Sci. 2024, 178, 106624. [Google Scholar] [CrossRef]
  104. El Kassis, R.; Ayer, S.K.; El Asmar, M. Augmented Reality Applications for Synchronized Communication in Construction: A Review of Challenges and Opportunities. Appl. Sci. 2023, 13, 7614. [Google Scholar] [CrossRef]
  105. Hajirasouli, A.; Banihashemi, S.; Sanders, P.; Rahimian, F. BIM-enabled virtual reality (VR)-based pedagogical framework in architectural design studios. Smart Sustain. Built Environ. 2024, 13, 1490–1510. [Google Scholar] [CrossRef]
  106. Maqsoom, A.; Zulqarnain, M.; Irfan, M.; Ullah, F.; Alqahtani, F.K.; Khan, K.I.A. Drivers of, and Barriers to, the Adoption of Mixed Reality in the Construction Industry of Developing Countries. Buildings 2023, 13, 872. [Google Scholar] [CrossRef]
  107. Khorrami Shad, H.; Tak Wing Yiu, K.; Lovreglio, R.; Feng, Z. State-of-the-art analysis of the integration of augmented reality with construction technologies to improve construction safety. Smart Sustain. Built Environ. 2024, 13, 1434–1449. [Google Scholar] [CrossRef]
  108. Xu, Z.; Feng, Z.; Jelodar, M.B.; Guo, B.H.W. Augmented reality applications in construction productivity: A systematic literature review. Adv. Eng. Inform. 2024, 62, 102798. [Google Scholar] [CrossRef]
  109. Bressan, N.M.; Scarpa, M.; Peron, F. Case studies of eXtended reality combined with Building Information Modeling: A literature review. J. Build. Eng. 2024, 84, 108575. [Google Scholar] [CrossRef]
  110. El Asmar, P.G.; Chalhoub, J.; Ayer, S.K.; Abdallah, A.S. Contextualizing Benefits and Limitations Reported for Augmented Reality in Construction Research. J. Inf. Technol. Constr. 2021, 26, 720–738. [Google Scholar] [CrossRef]
  111. Alsharef, A.; Ovid, A.; Uddin, S.M.J.; Albert, A. Biggest Challenges Facing the Construction Industry. In Proceedings of the 2nd Joint Conference of the Construction Research Congress (CRC)/Construction-Institute (CI) Summit, Iowa State Univ, Des Moines, IA, USA, 20–23 March 2024; pp. 652–660. [Google Scholar]
  112. Assila, A.; Dhouib, A.; Monla, Z.; Zghal, M. Integration of Augmented, Virtual and Mixed Reality with Building Information Modeling: A Systematic Review. In Proceedings of the 14th International Conference on Virtual, Augmented and Mixed Reality (VAMR) Held as Part of the 24th International Conference on Human-Computer Interaction (HCII), Electr Network, Virtual, 26 June–1 July 2022; pp. 3–19. [Google Scholar] [CrossRef]
  113. Munoz-La Rivera, F.; Mora-Serrano, J.; Onate, E. A Critical Review of How EXtended Reality (XR) has Addressed Key Factors Influencing Safety on Construction Projects (fSCPs). Arch. Comput. Methods Eng. 2024, 31, 2015–2048. [Google Scholar] [CrossRef]
  114. Wang, K.; Guo, F.; Zhou, R.; Qian, L. Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Constr. Innov. 2024, 24, 1085–1116. [Google Scholar] [CrossRef]
  115. Park, J.; Lee, J.K.; Son, M.J.; Yu, C.; Lee, J.; Kim, S. Unlocking the Potential of Digital Twins in Construction: A Systematic and Quantitative Review Using Text Mining. Buildings 2024, 14, 702. [Google Scholar] [CrossRef]
  116. Salih, F.; El-adaway, I.H. Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects. J. Constr. Eng. Manag. 2024, 150, 04024078. [Google Scholar] [CrossRef]
  117. Nassereddine, H.; Hanna, A.S.; Veeramani, D. Augmented Reality in the Construction Industry: An Industry’s Perspective of Its Users, Phases, and Future Trends. In Proceedings of the Construction Research Congress (CRC) on Construction Research and Innovation to Transform Society, Arizona State Univ, Del E Webb Sch Construct, Tempe, AZ, USA, 8–10 March 2020; pp. 743–752. [Google Scholar] [CrossRef]
  118. Yang, Z.; Tang, C.; Zhang, T.; Zhang, Z.; Doan, D.T. Digital Twins in Construction: Architecture, Applications, Trends and Challenges. Buildings 2024, 14, 2616. [Google Scholar] [CrossRef]
  119. Okonta, E.D.; Vukovic, V.; Hayat, E. Prospective Directions in the Computer Systems Industry Foundation Classes (IFC) for Shaping Data Exchange in the Sustainability and Resilience of Cities. Electronics 2024, 13, 2297. [Google Scholar] [CrossRef]
  120. Toyin, J.O.; Azhar, S.; Sattineni, A.; Fasoyinu, A.A. Investigating the influence of ict application in construction jobsites: A systematic review and bibliometric analysis. J. Inf. Technol. Constr. 2024, 29, 444–479. [Google Scholar] [CrossRef]
  121. Larbi, J.A.; Tang, L.C.M.; Ababio, B.K.; Antwi-Afari, P. Developing an integrated digital delivery framework for designing and planning construction projects: A review of interoperable digital technologies. Int. J. Constr. Manag. 2025, 25, 347–362. [Google Scholar] [CrossRef]
  122. Li, S.; Wang, Q.C.; Wei, H.H.; Chen, J.H. Extended Reality (XR) Training in the Construction Industry: A Content Review. Buildings 2024, 14, 414. [Google Scholar] [CrossRef]
  123. Li, H.; Fang, S.; Chen, L.; Menadue, V.; Martin, S. Extended reality (XR)—A magic box of digitalization in driving sustainable development of the construction industry: A critical review. Sustain. Dev. 2024, 32, 2830–2845. [Google Scholar] [CrossRef]
  124. Monla, Z.; Assila, A.; Beladjine, D.; Zghal, M. Maturity Evaluation Methods for BIM-Based AR/VR in Construction Industry: A Literature Review. IEEE Access 2023, 11, 101134–101154. [Google Scholar] [CrossRef]
  125. Toyin, J.O.; Sattineni, A.; Wetzel, E.M.; Fasoyinu, A.A.; Kim, J. Augmented reality in US Construction: Trends and future directions. Autom. Constr. 2025, 170, 105895. [Google Scholar] [CrossRef]
  126. Balali, V.; Guo, X.; Fathi, S.; Heydarian, A. Perceptions of Augmented and Virtual Reality Technologies Adoption within the AEC Industry. In Proceedings of the Construction Research Congress (CRC) on Project Management and Delivery, Contracts, and Design and Materials, Via Dept Civil & Environm Engn, Vecellio Construct Engn & Management Progr, Arlington, VA, USA, 9–12 March 2022; pp. 1067–1076. [Google Scholar]
  127. Chellappa, V.; Mesaros, P.; Spisakova, M.; Kaleja, P.; Spak, M. Digital technologies (DTs) for safety education and training in construction. Work. J. Prev. Assess. Rehabil. 2024, 78, 625–639. [Google Scholar] [CrossRef]
  128. Zhang, X.; Peng, Y.; Zhao, X.; Sun, Z.; Li, W.; Fan, X. Challenges of on-site implementation of mixed reality technology in the AECO industry. Autom. Constr. 2024, 166, 105620. [Google Scholar] [CrossRef]
  129. Samsami, R. A Systematic Review of Automated Construction Inspection and Progress Monitoring (ACIPM): Applications, Challenges, and Future Directions. Civileng 2024, 5, 265–287. [Google Scholar] [CrossRef]
  130. Le, N.; Tran, D.; Sturgill, R. Content Analysis of Three-Dimensional Model Technologies and Applications for Construction: Current Trends and Future Directions. Sensors 2024, 24, 3838. [Google Scholar] [CrossRef] [PubMed]
  131. Martinez, M.P.; La Rivera, F.M.; Serrano, J.M. Critical analysis of the use of extended reality XR for training in civil engineering. Comput. Appl. Eng. Educ. 2024, 32, e22720. [Google Scholar] [CrossRef]
  132. Munoz-La Rivera, F.; Mora-Serrano, J.; Valero, I.; Onate, E. Methodological-Technological Framework for Construction 4.0. Arch. Comput. Methods Eng. 2021, 28, 689–711. [Google Scholar] [CrossRef]
  133. Raut, S.; Bhura, S.; Khushalani, J.; Kim, H.; Ramani, N.; Bajaj, R.; Jeswani, D. Revolutionizing construction engineering education: A virtual reality approach for enhanced training and optimization. J. Stat. Manag. Syst. 2024, 27, 395–403. [Google Scholar] [CrossRef]
  134. Wang, H.W.; Hu, Z.Z.; Lin, J.R. Bibliometric review of visual computing in the construction industry. Vis. Comput. Ind. Biomed. Art 2020, 3, 14. [Google Scholar] [CrossRef]
  135. Wang, X.; Wang, S.; Xiao, F.; Luo, X. Augmented reality-based knowledge transfer for facility management: A systematic review. J. Build. Eng. 2024, 98, 111186. [Google Scholar] [CrossRef]
  136. Li, H.; Zhang, Y.; Cao, Y.; Zhao, J.; Zhao, Z. Applications of artificial intelligence in the AEC industry: A review and future outlook. J. Asian Archit. Build. Eng. 2025, 24, 1672–1688. [Google Scholar] [CrossRef]
  137. Vassigh, S.; Bogosian, B.; Peterson, E. Performance-Driven VR Learning for Robotics. In Proceedings of the 5th International Conference on Computational Design and Robotic Fabrication (CDRF), Shanghai, China, 24 June 2023; pp. 356–367. [Google Scholar] [CrossRef]
  138. Chandi, I.; Musonda, I.; Alowo, R. Exploring Cost Factors hindering Augmented Reality Adoption for Construction Worker Protection. In Proceedings of the 10th International Conference on Civil, Structural and Transportation Engineering, ICCSTE 2025, Barcelona, Spain, 17–19 July 2025; Avestia Publishing: Orléans, ON, Canada, 2025. [Google Scholar]
  139. Alowa, A. The Role of Augmented Reality (AR) in Enhancing Construction Site Visualization and Planning. Int. J. 2025, 13, 1389–1396. [Google Scholar] [CrossRef]
  140. Page, M.J.; McKenzie, J.E.; Bossuyt, P.M.; Boutron, I.; Hoffmann, T.C.; Mulrow, C.D.; Shamseer, L.; Tetzlaff, J.M.; Akl, E.A.; Brennan, S.E.; et al. The PRISMA 2020 statement: An updated guideline for reporting systematic reviews. BMJ 2021, 372, n71. [Google Scholar] [CrossRef]
Figure 1. PRISMA 2020 flow diagram of the study identification, screening, eligibility, and inclusion process (File S1).
Figure 1. PRISMA 2020 flow diagram of the study identification, screening, eligibility, and inclusion process (File S1).
Electronics 15 00225 g001
Figure 2. Times cited and publications over time, from WoS.
Figure 2. Times cited and publications over time, from WoS.
Electronics 15 00225 g002
Figure 3. Example illustrating the use of 3D mapping technologies for data acquisition, processing, project refinement, and the subsequent reconstruction of the shrine [79].
Figure 3. Example illustrating the use of 3D mapping technologies for data acquisition, processing, project refinement, and the subsequent reconstruction of the shrine [79].
Electronics 15 00225 g003
Figure 4. On-site inspection process using AR-based smart FMSs in [24].
Figure 4. On-site inspection process using AR-based smart FMSs in [24].
Electronics 15 00225 g004
Figure 5. System’s functional display configuration in [24].
Figure 5. System’s functional display configuration in [24].
Electronics 15 00225 g005
Figure 6. Data processing and contents of cyber–physical system for BIM AR service in [30].
Figure 6. Data processing and contents of cyber–physical system for BIM AR service in [30].
Electronics 15 00225 g006
Figure 7. Development process for AR-based smart FMSs in [24].
Figure 7. Development process for AR-based smart FMSs in [24].
Electronics 15 00225 g007
Figure 8. AR tool used in [63].
Figure 8. AR tool used in [63].
Electronics 15 00225 g008
Figure 9. Meta UI and Spatial UI in the AR environment [48].
Figure 9. Meta UI and Spatial UI in the AR environment [48].
Electronics 15 00225 g009
Figure 10. Third-person perspective of the BIM-ARDM system [27].
Figure 10. Third-person perspective of the BIM-ARDM system [27].
Electronics 15 00225 g010
Figure 11. AR mobile application [29].
Figure 11. AR mobile application [29].
Electronics 15 00225 g011
Figure 12. Some challenges to the use of digital technologies for successful VM (Value Management) in construction (adapted from [28]).
Figure 12. Some challenges to the use of digital technologies for successful VM (Value Management) in construction (adapted from [28]).
Electronics 15 00225 g012
Table 1. Type of publication. Ranked within each group based on citation count.
Table 1. Type of publication. Ranked within each group based on citation count.
Type/GroupReferences
(a) Original work (65 references)[9,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32,33,34,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63,64,65,66,67,68,69,70,71,72,73,74,75,76,77,78,79,80]
(b) Survey/literature review (66)[6,7,8,10,11,12,13,14,15,81,82,83,84,85,86,87,88,89,90,91,92,93,94,95,96,97,98,99,100,101,102,103,104,105,106,107,108,109,110,111,112,113,114,115,116,117,118,119,120,121,122,123,124,125,126,127,128,129,130,131,132,133,134,135,136,137]
(c) Provide support for writing this paper (6 + 3)[2,3,4,5,138,139], not ranked by citation count [1,16,17]
Table 2. The citation counts, obtained from Semantic Scholar, for the top three articles in each group of Table 1 (bar: year of publication).
Table 2. The citation counts, obtained from Semantic Scholar, for the top three articles in each group of Table 1 (bar: year of publication).
(a) [9] 167 Citations[18] 96 Citations[19] 91 Citations
Electronics 15 00225 i001Electronics 15 00225 i002Electronics 15 00225 i003
(b) [7] 343 Citations[6] 329 Citations[8] 238 Citations
Electronics 15 00225 i004Electronics 15 00225 i005Electronics 15 00225 i006
(c) [4] 9707 Citations[5] 4911 Citations[3] 2159 Citations
Electronics 15 00225 i007Electronics 15 00225 i008Electronics 15 00225 i009
Table 3. The citation counts, obtained from WoS, for the top three articles in each group of Table 1 (Group C is not ranked in WoS) (line: citations; bar: year of publication).
Table 3. The citation counts, obtained from WoS, for the top three articles in each group of Table 1 (Group C is not ranked in WoS) (line: citations; bar: year of publication).
(a) [9] 153 Citations[18] 74 Citations[19] 83 Citations
Electronics 15 00225 i010Electronics 15 00225 i011Electronics 15 00225 i012
(b) [7] 258 Citations[6] 276 Citations[8] 185 Citations
Electronics 15 00225 i013Electronics 15 00225 i014Electronics 15 00225 i015
Table 4. Definitions and content of studies classified as “Original Work” in 2025.
Table 4. Definitions and content of studies classified as “Original Work” in 2025.
2025
[46]Proposes a novel multimodal interaction system for human–robot collaboration in construction and evaluates its effectiveness via a study.
[54]Explores AR, virtual reality (VR), and mixed reality (MR) adoption in the AEC industry using surveys and interviews.
[56]Examines Smart City and Industry 4.0 advances in asphalt pavements, highlighting Internet of Things (IoT), AI, AR, and smart infrastructure.
[59]Assess and ranks the implications of various construction 4.0 technologies on enhancing well-being in the construction industry.
[69]Proposes a new method for assessing safety hazards in construction.
[79]Reviews modern methods of documentation and visualization for cultural heritage, comparing digital photogrammetry and terrestrial laser scanning, and exploring their integration with VR/AR for restoration projects, exemplified by the reconstruction of the Prophet Nahum shrine in Iraq.
Table 5. Definitions and content of studies classified as “Survey/Literature review” in 2025.
Table 5. Definitions and content of studies classified as “Survey/Literature review” in 2025.
2025
[121]A systematic review, proposing a system architecture design for digital technologies in integrated digital delivery.
[125]A systematic review (2006–2023) on AR in U.S. construction, identifying application areas, benefits, drivers, and proposing a conceptual model for future implementation.
[136]A literature review (2022–2023) on AI applications in construction, highlighting key trends, themes, and future directions including digital twins, blockchain, AR, and VR.
Table 6. Trends of AR in the construction industry—description.
Table 6. Trends of AR in the construction industry—description.
Trend CategoryDescription
Integration with BIM, IoT, and Digital TwinsCombines AR with BIM models, IoT sensors, and digital twins for real-time visualization, progress tracking, and automated inspections.
Training, Education, and Cognitive ErgonomicsEnhances learning outcomes via immersive environments. Studies focus on AR display methods and ergonomics in complex tasks.
Safety Management and Hazard DetectionAR is used to identify hazards, visualize safety data, and train workers with real-time feedback and alerts using wearable or mobile devices.
Inspection, Monitoring, and Quality ControlAR supports construction inspection, monitoring hidden structures, and real-time progress verification. UAV and mobile AR use is increasing.
Collaboration and Remote WorkflowsEnables synchronized, real-time communication among stakeholders, including off-site experts and on-site teams.
Mobile AR and UAV IntegrationUse of smartphones/tablets and drones for AR visualization, enabling affordable, mobile, and aerial applications.
Lifecycle IntegrationAR is applied from design to facility management.
Human–Robot CollaborationAR supports shared workflows between robots and humans for precision tasks (e.g., beam fabrication, bricklaying).
Public Engagement and Smart CitiesAR fosters stakeholder and citizen engagement, allowing visualization of construction impacts and infrastructure simulation.
Table 7. Trends of AR in the construction industry—references.
Table 7. Trends of AR in the construction industry—references.
Trend CategoryReferences
Integration with BIM, IoT, and Digital Twins[9,12,14,18,20,24,25,26,27,30,31,32,33,34,38,44,45,46,49,55,58,64,65,66,67,68,70,73,75,76,78,80,82,83,84,87,90,94,96,99,100,107,108,115,116,118,119,120,121,122,124,125,128,129,133,134,135,136]
Training, Education, and Cognitive Ergonomics[6,7,10,13,14,22,24,26,32,34,36,37,38,39,40,42,46,47,49,50,52,55,56,58,59,60,62,63,66,69,73,74,76,81,83,84,86,87,91,97,98,99,100,103,104,106,107,110,113,118,125,127,131,132,133,137]
Safety Management and Hazard Detection[6,11,12,22,24,25,26,31,34,37,39,40,41,47,48,56,58,59,60,64,66,69,72,73,81,86,94,97,98,101,103,107,113,115,118,124,125,127,128,132]
Inspection, Monitoring, and Quality Control[15,18,25,27,30,33,34,36,38,45,54,56,60,62,66,67,68,73,76,79,80,81,83,86,89,90,93,94,97,100,101,104,106,107,112,120,122,124,125,126,128,129,130,132,134]
Collaboration and Remote Workflows[6,10,11,14,20,22,24,28,33,34,36,40,41,42,43,44,45,47,49,50,54,55,56,59,60,61,62,66,67,68,72,74,79,80,82,83,86,87,88,90,94,99,104,106,109,114,115,120,121,122,124,125,131,132,135]
Mobile AR and UAV Integration[12,20,29,30,32,45,56,60,61,65,71,75,76,83,88,98,99,108,129,134]
Lifecycle Integration[6,7,13,14,40,41,43,54,65,66,82,83,84,88,90,91,94,100,112,113,117,122,128,130]
Human–Robot Collaboration[8,29,44,46,50,75,122]
Public Engagement and Smart Cities[7,13,25,56,60,62,87,97]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Marinho, J.; Sá, F.; Durães, J.; Fonseca, I.; Martins, N.C. A Systematic Literature Review of Augmented Reality’s Development in Construction. Electronics 2026, 15, 225. https://doi.org/10.3390/electronics15010225

AMA Style

Marinho J, Sá F, Durães J, Fonseca I, Martins NC. A Systematic Literature Review of Augmented Reality’s Development in Construction. Electronics. 2026; 15(1):225. https://doi.org/10.3390/electronics15010225

Chicago/Turabian Style

Marinho, José, Filipe Sá, João Durães, Inácio Fonseca, and Nuno Cid Martins. 2026. "A Systematic Literature Review of Augmented Reality’s Development in Construction" Electronics 15, no. 1: 225. https://doi.org/10.3390/electronics15010225

APA Style

Marinho, J., Sá, F., Durães, J., Fonseca, I., & Martins, N. C. (2026). A Systematic Literature Review of Augmented Reality’s Development in Construction. Electronics, 15(1), 225. https://doi.org/10.3390/electronics15010225

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop