A Novel Model for Economic Recycle Quantity with Two-Level Piecewise Constant Demand and Shortages

1
Department of Industrial Engineering, College of Engineering, Prince Sattam Bin Abdulaziz University, Al-Kharj 11942, KSA, Saudi Arabia
2
Mechanical Engineering Department, Faculty of Engineering (Shoubra), Benha University, Cairo 11637, Egypt
3
Department of Mathematics, Jahangirnagar University, Savar 1342, Bangladesh
4
Department of Mathematics, University of Mississippi, Oxford, MS 38655, USA
*
Author to whom correspondence should be addressed.
Computation 2024, 12(1), 13; https://doi.org/10.3390/computation12010013
Submission received: 10 October 2023 / Revised: 21 December 2023 / Accepted: 2 January 2024 / Published: 11 January 2024

Abstract

This paper focuses on the production systems that may produce a proportion of recyclable defective products. The developed model is called an Economic Recycle Quantity (ERQ) model with the assumption of a full recovery of defective items. The defective parts are collected during the production-off time and can be used during the next production cycle of the same category. The demand rate of the non-defective items is a two-level piecewise factor—one during the production-run time and another during the production-off time. The developed model aims to optimize the total inventory cost, the order quantity, and the amount of recyclable defective items that represent the ERQ. The mathematical formulations of the model are deduced theoretically. The model was solved analytically, and the optimal results are illustrated. Sensitivity analysis is carried out to investigate the effect of varying system parameters and validate the proposed model. Results of the sensitivity analysis show that the consideration of defective part recycling reduces the total inventory cost where the raw material is reduced. The cost reduction is about 1%; of course, the environmental impact is more appreciated. Furthermore, the managerial implications are described, and the future perspectives are discussed.
Keywords: Economic Recycle Quantity (ERQ); inventory; shortages; production-run time; production-off time Economic Recycle Quantity (ERQ); inventory; shortages; production-run time; production-off time

Share and Cite

MDPI and ACS Style

Attia, E.-A.; Miah, M.M.; Arif, A.S.; AlArjani, A.; Hasan, M.; Uddin, M.S. A Novel Model for Economic Recycle Quantity with Two-Level Piecewise Constant Demand and Shortages. Computation 2024, 12, 13. https://doi.org/10.3390/computation12010013

AMA Style

Attia E-A, Miah MM, Arif AS, AlArjani A, Hasan M, Uddin MS. A Novel Model for Economic Recycle Quantity with Two-Level Piecewise Constant Demand and Shortages. Computation. 2024; 12(1):13. https://doi.org/10.3390/computation12010013

Chicago/Turabian Style

Attia, El-Awady, Md Maniruzzaman Miah, Abu Sayeed Arif, Ali AlArjani, Mahmud Hasan, and Md Sharif Uddin. 2024. "A Novel Model for Economic Recycle Quantity with Two-Level Piecewise Constant Demand and Shortages" Computation 12, no. 1: 13. https://doi.org/10.3390/computation12010013

APA Style

Attia, E.-A., Miah, M. M., Arif, A. S., AlArjani, A., Hasan, M., & Uddin, M. S. (2024). A Novel Model for Economic Recycle Quantity with Two-Level Piecewise Constant Demand and Shortages. Computation, 12(1), 13. https://doi.org/10.3390/computation12010013

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.