The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project

Faculty of Built Environment, University of New South Wales; Sydney 2052, Australia
*
Author to whom correspondence should be addressed.
Received: 23 November 2018 / Revised: 29 December 2018 / Accepted: 2 January 2019 / Published: 8 January 2019
Full-Text   |   PDF [574 KB, uploaded 8 January 2019]   |  

Abstract

The Construction Industry is a complex and fragmented industry worldwide with regards to its supply chain, products, and processes, and is faced with a similar dilemma as faced by manufacturers during its time in past decades. Scope, time, and cost are the triple constraints of project management and leading factors in defining the project performance. Productivity and efficiency of each construction project is measured through its triple constraints, therefore the factors that affect project success are significantly important. Despite the importance of understanding project performance indicators, few empirical studies have been conducted over the last decade in terms of analyzing the factors that determine the performance of high-rise buildings in Engineering, Procurement, and Construction (EPC) projects. Hence, the aim of this paper is to analyze and rank EPC critical activities across large-scale residential construction projects in Iran, by using the TOPSIS method as a multi-attribute group decision-making technique. Results indicate that engineering design, project planning and controls are significant factors contributing to the project performance. In addition, engineering has a pivotal role in project performance and this significance is followed by the construction phase. On the contrary, all believe procurement is more important than Construction phase. View Full-Text
Keywords: EPC projects; project Performance; triple constraints; TOPSIS EPC projects; project Performance; triple constraints; TOPSIS
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited (CC BY 4.0).
SciFeed

Share & Cite This Article

MDPI and ACS Style

Kabirifar, K.; Mojtahedi, M. The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project. Buildings 2019, 9, 15.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Buildings EISSN 2075-5309 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top