Next Article in Journal
Multi-Objective Optimization in Construction Project Management Based on NSGA-III: Pareto Front Development and Decision-Making
Previous Article in Journal
A Method to Optimize Dormitory Environments Based on Personnel Behavior Regulation
 
 

Order Article Reprints

Journal: Buildings, 2024
Volume: 14
Number: 2113

Article: A Reconstruction Methodology of Dynamic Construction Site Activities in 3D Digital Twin Models Based on Camera Information
Authors: by Jingyao He, Pengfei Li, Xuehui An and Chengzhi Wang
Link: https://www.mdpi.com/2075-5309/14/7/2113

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop