Peng, W.; Ma, J.; Chen, X.; Ji, Y.; Sun, J.; Ding, J.; Zhang, D.
Optimization of the Schedule for the Whole Process in Hot Strip Manufacturing. Metals 2020, 10, 717.
https://doi.org/10.3390/met10060717
AMA Style
Peng W, Ma J, Chen X, Ji Y, Sun J, Ding J, Zhang D.
Optimization of the Schedule for the Whole Process in Hot Strip Manufacturing. Metals. 2020; 10(6):717.
https://doi.org/10.3390/met10060717
Chicago/Turabian Style
Peng, Wen, Jianyang Ma, Xiaorui Chen, Yafeng Ji, Jie Sun, Jinggou Ding, and Dianhua Zhang.
2020. "Optimization of the Schedule for the Whole Process in Hot Strip Manufacturing" Metals 10, no. 6: 717.
https://doi.org/10.3390/met10060717
APA Style
Peng, W., Ma, J., Chen, X., Ji, Y., Sun, J., Ding, J., & Zhang, D.
(2020). Optimization of the Schedule for the Whole Process in Hot Strip Manufacturing. Metals, 10(6), 717.
https://doi.org/10.3390/met10060717