Li, J.; Ameen, A.M.S.; Mohammad, T.A.; Al-Ansari, N.; Yaseen, Z.M.
A Systematic Operation Program of a Hydropower Plant Based on Minimizing the Principal Stress: Haditha Dam Case Study. Water 2018, 10, 1270.
https://doi.org/10.3390/w10091270
AMA Style
Li J, Ameen AMS, Mohammad TA, Al-Ansari N, Yaseen ZM.
A Systematic Operation Program of a Hydropower Plant Based on Minimizing the Principal Stress: Haditha Dam Case Study. Water. 2018; 10(9):1270.
https://doi.org/10.3390/w10091270
Chicago/Turabian Style
Li, Jing, Ameen Mohammed Salih Ameen, Thamer Ahmad Mohammad, Nadhir Al-Ansari, and Zaher Mundher Yaseen.
2018. "A Systematic Operation Program of a Hydropower Plant Based on Minimizing the Principal Stress: Haditha Dam Case Study" Water 10, no. 9: 1270.
https://doi.org/10.3390/w10091270
APA Style
Li, J., Ameen, A. M. S., Mohammad, T. A., Al-Ansari, N., & Yaseen, Z. M.
(2018). A Systematic Operation Program of a Hydropower Plant Based on Minimizing the Principal Stress: Haditha Dam Case Study. Water, 10(9), 1270.
https://doi.org/10.3390/w10091270