Ultimate Pit Limit Optimization Method with Integrated Consideration of Ecological Cost, Slope Safety and Benefits: A Case Study of Heishan Open Pit Coal Mine
Abstract
Share and Cite
Xu, X.; Zhu, Z.; Ye, L.; Gu, X.; Wang, Q.; Zhao, Y.; Liu, S.; Zhao, Y. Ultimate Pit Limit Optimization Method with Integrated Consideration of Ecological Cost, Slope Safety and Benefits: A Case Study of Heishan Open Pit Coal Mine. Sustainability 2024, 16, 5393. https://doi.org/10.3390/su16135393
Xu X, Zhu Z, Ye L, Gu X, Wang Q, Zhao Y, Liu S, Zhao Y. Ultimate Pit Limit Optimization Method with Integrated Consideration of Ecological Cost, Slope Safety and Benefits: A Case Study of Heishan Open Pit Coal Mine. Sustainability. 2024; 16(13):5393. https://doi.org/10.3390/su16135393
Chicago/Turabian StyleXu, Xiaochuan, Zhenguo Zhu, Luqing Ye, Xiaowei Gu, Qing Wang, Yunqi Zhao, Siyi Liu, and Yuqi Zhao. 2024. "Ultimate Pit Limit Optimization Method with Integrated Consideration of Ecological Cost, Slope Safety and Benefits: A Case Study of Heishan Open Pit Coal Mine" Sustainability 16, no. 13: 5393. https://doi.org/10.3390/su16135393
APA StyleXu, X., Zhu, Z., Ye, L., Gu, X., Wang, Q., Zhao, Y., Liu, S., & Zhao, Y. (2024). Ultimate Pit Limit Optimization Method with Integrated Consideration of Ecological Cost, Slope Safety and Benefits: A Case Study of Heishan Open Pit Coal Mine. Sustainability, 16(13), 5393. https://doi.org/10.3390/su16135393