1. Introduction
Uganda is a country located in East Africa, with a total land area of about 241,559 km
2 of which 37,000 km
2 is covered by water [
1]. It is endowed with a large number of natural resources such as abundant rainfall, fertile soils, gold, copper, cobalt, oil, and natural gas reserves [
2]. Being a landlocked country, Uganda relies on neighboring countries Tanzania and Kenya, which have a coastline, to export and import goods [
2]. The country’s medium-sized economy has been growing at an average growth domestic product (GDP) rate of 7% per annum before 2016 and 4.5% after 2016 [
3]. In addition, national electricity demand has been growing at an average rate of 10~12% per annum [
4]. Uganda also has an abundance of energy resources, such as hydropower, biomass, solar, geothermal, and peat energies. The country has an estimated 2000 MWe potential of hydroelectric power along the Nile River, 450 MW of geothermal energy along the western rift valley, 1650 MWe of biomass cogeneration (often at sugar manufacturing plants), 460 million tons of biomass in stock with a sustainable annual output of 50 million tons, an average of 5.1 kWh/m
2/day of solar energy, and approximately 250 million tons of peat (800 MWe). The total renewable energy power generation potential is estimated to be 5300 MWe [
2,
5]. Nevertheless, the power generation potential from these sources, even if fully utilized, cannot meet the projected growth, including the national development goals set out in Vision 2040 [
6]. Uganda’s total installed electricity capacity was 1237.49 MWe as of October 2020, generated by four sources as follows: 83% hydropower (1023.59 MWe), 8% thermal power (100 MWe), 5% cogeneration or biomass (63.9 MWe), and 5% grid-connected solar power (60 MWe) [
7].
In 2007, the Ugandan government established “Vision 2040” to transform Uganda from a peasant to an industrialized and largely urban society. To achieve the goals of this vision, Uganda would develop and generate modern energy to drive the industrial and service sectors. It was estimated that Uganda would require 41,738 MWe by 2040, which would increase electricity consumption per capita to 3668 kWh. In addition, access to the national power grid would significantly increase to 80% [
8].
Uganda Vision 2040 further states that the required capacity is to be generated from different energy sources, namely: hydropower (4500 MWe), thermal power (1500 MWe), nuclear power (24,000 MWe), solar power (5000 MWe), biomass (1700 MWe), peat (800 MWe), and geothermal power (4300 MWe) [
8]. The energy sources and their contribution were to be determined after detailed feasibility studies on the energy mix. The vision also emphasizes the role of nuclear energy in overcoming the energy deficit. The role of nuclear energy was envisioned preferably based on the uranium resources available in the country and plans were made to invest in the development of the necessary nuclear infrastructure to support the early development and use of nuclear energy for electricity generation [
8].
The Ugandan Energy Policy draft of 2019 is in effect, strategically directed towards energy security, sustainability, and economic competitiveness. Among the key issues facing Uganda’s energy sector is vulnerability to climate change, as the country’s energy balance is 88% biomass and electricity capacity mix is dominated by hydropower at 84% [
9]. As in other Sub-Saharan African nations that largely depend on hydropower, weather changes, such as floods and dry spells, have jeopardized power supply for a long time, leading to frequent power outages [
4]. These adverse climate changes could disrupt energy supply and raise the stakes of energy security. Therefore, Uganda’s energy policy emphasizes the need to optimize the energy mix to ensure energy security and mitigate climate change [
9]. In order to diversify its energy mix, Uganda has taken steps towards the introduction of nuclear power. Uganda Vision 2040 roadmap incorporates the development of significant nuclear capacity as part of the energy mix for Uganda’s future energy needs [
4]. An energy policy that includes nuclear power was drafted and a Nuclear Energy Program Implementing Organization (NEPIO) was established [
9]. Uganda’s NEPIO has completed several studies on different infrastructure issues and drafted a Nuclear Power Roadmap for Uganda that makes recommendations for key decisions on the development of the infrastructure for nuclear power in the short, medium, and long term [
10]. Potential sites for nuclear power plant construction have been identified in the Kyoga, Kagera, and Aswa regions of Uganda [
11]. The base scenario is for two 1000 MWe nuclear reactor units by 2031 [
12]. In May 2018, Uganda signed a memorandum of understanding on cooperation in the peaceful uses of nuclear energy with China [
11]. In June 2017, Uganda’s Ministry of Energy and Mineral Development signed an agreement with Rosatom, Russia covering nuclear infrastructure and nuclear research centers with research reactors [
11].
The Integrated Nuclear Infrastructure Review (INIR) team of the IAEA also visited Uganda in December 2021 and evaluated Uganda’s nuclear power infrastructure development using Phase One of the IAEA’s milestones approach [
12]. The end of Phase one marks the readiness of a country to make a knowledgeable commitment to a nuclear power program [
13]. The IAEA INIR team recommended that Uganda’s Nuclear Power Roadmap needs to be updated and completed by conducting further studies that provide a basis for informed decisions and commitments for the nuclear power program. Other areas pointed out by the INIR team include preparedness of the electric grid, financing, radiation protection, environmental protection, etc. [
10]. Globally, nuclear power projects have been facing major challenges, mainly due to construction delays caused by cost overruns. A notable example is Georgia’s Vogtle Units 3 and 4 in the United States of America. The project involving two 1117 MWe Westinghouse AP1000 reactors was approved in 2009 and it was expected to cost approximately US
$14 billion [
14]. The project is now 5 years behind schedule and costs have surged to US
$28.5 billion before completion [
15]. Other projects, such as Flamanville Unit 3 in France, V.C. Summer 2 and 3 in the USA have faced similar challenges [
16,
17]. To overcome these challenges that have hampered the commercial nuclear industry for decades, cutting edge new nuclear technologies referred to as small modular reactors (SMRs) have been proposed. SMRs are advanced nuclear reactor units with a generating capacity up to 300 MWe per unit, about one-third of that of conventional nuclear power plants. SMRs being modular makes it possible to manufacture the systems and components and ship them as a unit to the installation site [
18]. SMRs have been designed as an option to provide flexible power generation for a wide range of consumers and applications [
19]. In addition, they offer better upfront capital cost affordability, are suitable for cogeneration and non-electrical applications, and are capable of operating in remote regions with less developed infrastructure [
19]. All of these features are suitable for Uganda’s energy system because one of the challenges in accelerating access to energy is the cost of infrastructure and grid connectivity for rural electrification. A single power plant should not exceed 10 percent of the total grid capacity installed [
18]. Yet, using this analogy, Uganda’s grid of 1237 MWe would not be capable of handling its proposed 2000 MWe large nuclear power. Therefore, based on Uganda’s grid infrastructure, where sufficient transmission lines and grid capacity are lacking, SMRs can be installed on-grid or off-grid, providing low carbon power to industries and the population [
18]. Compared to existing reactors, the proposed SMR designs are generally simple, and SMR safety concepts often rely on passive systems and the reactor’s unique safety features, such as low power and operating pressure. There over 70 designs of SMRs undergoing different stages of development in many countries around the world. Below is
Table 1 showing a brief summary of some SMR designs at advanced stages of development.
The water-cooled reactor represents a major SMR design using integrated light water reactor (LWR) technology. It represents the most mature technology as it operates like most large power plants today. The gas-cooled high-temperature SMR provides information on modular HTGRs under development and construction [
21]. HTGR provides high temperature heat (≥ 750 °C) that can be used for more efficient power generation, various industrial applications, and cogeneration. The fast neutron spectrum SMR provides a fast neutron spectrum with all the different coolant options. These coolants include sodium-cooled fast reactors (SFRs), heavy metal-cooled fast reactors (HLMCs, or lead or lead-bismuth), gas-cooled fast reactors (GFRs), and molten salt fast reactors (MSFRs). A molten salt SMR refers to an SMR using advanced reactor technology for molten salt fuel (and cooling) [
21]. This study focused on integral pressurized water small modular reactors, represented as i-PWR (SMR), because of much experience with operating light water reactors throughout the world on a large scale, unlike other SMR designs that use moderators and coolants that have not operated before.
Previous studies have used the MESSAGE (model for energy supply strategy options and their general environmental consequences) code to construct long-term energy strategies for optimization. Egypt employed the MESSAGE code to optimize electrical generation technologies in order to reduce carbon emissions over a 45-year time frame. Findings of that study were that nuclear power is the best choice of electricity-generating technology for satisfying Egypt’s future electricity demand while also lowering CO
2 emissions. In Nigeria, another study was conducted utilizing the MESSAGE code to find the optimum energy supply method to meet a future energy demand [
22]. The study was based on two scenarios, one modeling the electricity generation mix without carbon emission constraints and the second scenario imposing carbon emission constraints. The results showed that both nuclear and fossil fuel power plants are optimal power generation technologies that meet Nigeria’s future energy needs, with nuclear power causing the least environmental damage [
22]. The adoption of nuclear power was identified as the best long-term power generation strategy for Saudi Arabia [
23]. The MESSAGE code was used to model the optimal strategy for the introduction of nuclear energy in Saudi Arabia. The results of the study showed that renewable and nuclear energy technologies will be the most competitive future strategies for power supply in Saudi Arabia until 2050. Michealson and Jiang in their paper reviewed the integration of SMRs in renewable energy microgrids; key issues and approaches were examined to show how SMRs can be effectively integrated into microgrids as a clean and sustainable energy supply. Issues related to unit sizing, operation, and control were identified; however, the paper did not dig deeper into the existing literature of this subject [
24]. Budnitz and his colleagues’ study reviewed the expansion of nuclear power technology to new countries; they analyzed the technical attributes of SMRs, their pros and cons in regards to economics, grid compatibility, and safety. In their major conclusions, the need for a strong national and international regulatory regime was emphasized [
25].
The main objective of comprehensive energy system analysis is to formulate medium- and long-term supply strategies that meet a projected demand and requirements of sustainable development in all its social, economic, and environmental dimensions, thereby ensuring secure energy supply [
26]. This study aimed to evaluate the potential role of SMRs if they were integrated into Uganda’s future energy system. This was performed by modeling the entire electricity-generating mix from available energy resources, including SMRs, to obtain an optimal long-term energy supply strategy. This was modeled in the MESSAGE code using three scenarios; the first scenario was based on Uganda’s existing energy sources, the second scenario was based on Uganda Vision 2040, which aims to use new energy sources including large nuclear reactors to diversify its future energy mix, and the last scenario represents our proposal to Uganda to consider integrating SMRs into the future energy mix. To validate the results from MESSAGE modeling, an economic analysis was performed using levelized cost of energy (LCOE) analysis. This was conducted by calculating the LCOE of different electricity-generating technologies and compared them with that of nuclear technologies.
2. Materials and Methods
The study employed two approaches to carry out analysis; the first approach used the MESSAGE code to optimize the future electricity generation mix of Uganda, and in the second approach, an economic analysis through LCOE calculation was performed to determine the economic competitiveness of small modular reactors with alternative technologies.
2.1. The MESSAGE Code
The MESSAGE is a model developed for optimizing the energy system (i.e., energy supply and use). The model was originally developed at the International Institute for Applied Systems Analysis (IIASA), and the International Atomic Energy Agency (IAEA) added a user interface to facilitate its use [
27]. The underlying principle of the MESSAGE model is the optimization of an objective function under a set of constraints that define the feasible range containing all possible solutions to the problem. The value of the objective function helps to select the solution that is the most suitable according to the defined criteria [
27]. This objective function minimizes total discounted systems costs, which include the investment cost, the operating cost, and any additional penalty cost defined for the limits, bounds, and constraints on the relationships (such as the gas emission limits). The equation for this objective function is expressed by the following mathematical formula:
where
is the sum of all costs incurred in period t and
, where r is the discount rate [
28].
The present value is calculated by discounting all costs incurred at later dates from the base year of the case study, and the sum of the discounted costs is used to find the optimal solution. Discounting makes the costs incurred at different points in time comparable; the discount rate determines the weighting of the different time periods in the optimization. In principle, it should be equal to the long-term real interest rate, without taking into account inflation or other opportunity costs [
27]. The modeling method is based on the construction of a network of energy flows describing the entire energy system, starting from domestic energy resources (oil and gas, uranium, coal mines, etc.), through the primary and secondary levels, to the given demand at the end-use level, divided by consumption types such as heat, fuel, electricity, and so on. This method compares the performance of a given technology with its alternatives based on a life cycle analysis under different national or local conditions. When an energy resource or consumption can be met by different options, such as meeting heat demand by oil, NG, electricity, or solar energy, the optimal solution selects the most appropriate option in terms of the calculated discounted cost of the unit of energy delivered, taking into account the total technology cost of investment, operation and maintenance (O&M), and the fuel cost at constant base year prices. This approach provides a realistic assessment of the long-term role of an energy supply option under competitive conditions. Environmental aspects can be analyzed by considering and, if necessary, limiting the amounts of air pollutants emitted by different technologies at different stages of the energy supply chain. This helps in evaluating the impact of environmental regulations on the development of the energy system, which may give advantages to the use of some clean technologies, such as nuclear power and renewable energy.
The MESSAGE was used because it is one of the most suitable models for assessing the potential role and competitiveness of SMRs [
29]. Other software tools for energy planning include LEAP, WASP, FINPLAN, and POWERWORLD [
30]. The main advantages of the MESSAGE code are:
- (i)
Ability to consider technical, economic, environmental, regulatory, and policy constraints on power generation technology.
- (ii)
Ability to find the optimal mix of energy supply assets to be built or expanded over time to meet the expected future energy demands while minimizing overall system costs.
2.2. Model Description of Ugandan Energy System
Uganda’s national energy mix was modeled considering the available data and public information on the technologies participating in national electricity generation (resources, capacities, activities, and economic parameters (costs, efficiency, load factors, etc.)), according to the existing legal framework. To compensate for the lack of data, internationally agreed upon data from studies in the domain have been used. The study defined the base year as 2015, with the national energy mix keeping its dominant hydropower characteristic and other producers of electricity, namely biomass, thermal, and solar power plants, and the time horizon for the performed analysis was assumed to be 2050. For electricity demand evolution, two scenarios were considered. The first scenario is from an energy demand forecast from 2015~2040 completed by AF-Consult Switzerland Ltd. contracted by the government of Uganda [
6]. The demand forecast was obtained through the addition of the total energy consumption of the on-grid customers in each of the years of the forecast period. On top of this, the suppressed demand, the losses, and the export load were added. The results of the study reported a 9.8% annual average growth rate in gross energy consumption being 5963 GWh demand in the year 2015 and 27,771 GWh demand in 2040. The second scenario was based on Uganda’s historical data from 1980~2019 for total electricity consumption and total carbon emissions and adopted the constant growth method to predict future values for the entire time horizon until 2050. The average annual growth rate (AAGR) of electricity consumption was 7.0%, which was calculated using the data obtained from the US Energy Information Administration (EIA) from 1980 to 2019 [
31], while the AAGR in carbon emissions was 5.5%. The results were plotted and are shown in
Figure 1 below. The first scenario, which reports AAGR of 9.8%, was selected for Uganda’s electricity demand evolution in MESSAGE modeling for conservativeness.
To meet the projected demand in energy sustainably and counter the rising carbon emissions in Uganda’s energy system, a system analysis was performed based on available resources and information. Uganda’s energy system is divided into a supply network that includes final, secondary, and primary energy levels, as well as domestic energy resources (oil, gas, uranium, biomass, peat, etc.). Technologies are defined by activity and capacity. Activity indicates input and output energy, efficiency, variable operation and maintenance costs, and user-imposed limits and constraints on the activity. Capacity describes the installed capacity, investment cost, fixed operation and maintenance cost, plant factor, construction time, and economic life, as well as the imposed limits on installed capacity, investment cost, and penetration factor. According to the modeling framework of the MESSAGE, the power system representation consists of time frame, load region, electric load curve, energy levels, energy forms, technologies, resources, demand, and constraints. These elements are briefly introduced below.
2.2.1. Time Frame
The study period covers the time horizon from 2015 to 2050, with a time step of 5 years. The year 2015 represents the base year, while the year 2020 is the start year in the optimization process (first model year).
2.2.2. Load Regions and Load Curves
Fluctuations in electricity demand, is represented by annual load profiles, usually termed as load regions and load curves. According to the variability characteristics of the Ugandan load curve, a day is divided into three time zones, the load peaks from the 19th to the 23rd hour in the evening, then off-peaks from 24 to 6 h at night and the load demand becomes modest between 7 h to 18 h during day time [
31]. The load profile was assumed to be the same for all modeling years. Due to the nature of electricity as a non-storage form of energy, implicit coupling between power production and consumption must be considered when power production is to follow the required time-varying demand. Therefore, the modeling of the power grid requires specifying an annual hourly load curve. In this analysis, the time-load curve of future power demand was adopted from a previous study dealing with forecasting peak demand in Uganda [
31]. With the Ugandan grid being dominated by hydropower and a portion of a solar power, which face production fluctuations due to seasonal changes, stable sources such as SMRs could help to load follow when integrated with renewables in those circumstances where hydropower and solar PV are unavailable given that the grid size characteristics are similar.
2.2.3. Hydro System Modeling
There are three types of hydropower facilities that can be modeled in the MESSAGE: run of river hydro, hydro with the rivers system and storage, and hydro cascade with pumped storage. The type that was modeled in this study is the hydro with rivers system and storage because it is the most common hydro system in Uganda along the Nile River. For modeling in the MESSAGE, a technology was introduced with two rivers and a water storage system. River 1 brings water from natural sources and provides in flow to the storage; the hydropower plant takes water from the storage and generates electricity by discharging water in downstream River 2. The storage system has a maximum capacity and allows an overflow of excess water down the course of River 2.
2.2.4. Energy Levels
The introduction of energy levels is essential for the construction of the physical flow model of the national energy system. Energy levels classify the different stages of the conversion processes to produce and supply a particular form of energy along the energy chain. This helps illustrate how a form of energy is delivered. Four energy levels are considered in this analysis, consisting of resources, primary energy, secondary energy, and final energy. The final energy level is identical to the energy demand. The energy levels are interconnected by energy conversion technologies, such as extraction, treatment, generation, transportation, and distribution, as shown in
Figure 2. Import and export of energy forms are modeled at either the primary or secondary level, reflecting the real situation of each fuel type.
Resources represent the first stage in the structured energy chain and refer to available finite domestic energy resources, such as fossil (oil, gas, and coal), nuclear (uranium and thorium), and traditional (wood) resources. In modeling energy resources, the MESSAGE provides the ability to define up to three different grades (or cost categories) of a resource, i.e., a categorization of the product from the same resource. Uganda’s fossil resources are limited to oil and natural gas (NG). Proven geological oil reserves are estimated at nearly 6.5 billion barrels of oil of which 1.4 billion barrels are recoverable [
32]. With the East African oil pipeline project recently getting the go-ahead, Uganda is set to produce its first oil yield as early as 2025 and production in the next five years is expected to jump to 230,000 barrels per day from zero in 2021 [
33]. Proven geological reserves of natural gas in Uganda are estimated at 500 billion cubic feet [
34]; however, no information regarding resource utilization or development for electricity generation has been available; thus, NG was excluded from technology modeling. Uganda’s Ministry of Energy and Minerals has previously stated that the country has significant uranium deposits but estimates of the reserves are unknown as the minerals have not been commercially investigated [
35]. The first nuclear fuel supplies for Uganda’s planned power plants are expected to come from imports [
6].
Extracted fuel oil was defined at this energy level. This is directly used as fuel for thermal power plants.
Many forms of energy can be recovered from primary sources, namely NG after processing at gas factories, liquefied petroleum gas (produced at gas factories, oil refineries, and by direct import), gasoline and kerosene, diesel, and electricity. Electricity is the only energy form that has been defined at this level.
Only electricity has been included as the main form of energy to represent electricity supply in all consumption sectors (industry, domestic, and residential).
2.3. Scenarios Formulation
Three scenarios for optimizing the future electricity-generating mix were devised and chosen for analysis. These include;
- (i)
The business as usual (BAU) scenario
This scenario looked at the situation where Uganda continues to rely on the existing energy mix as of 2020, which is comprised of hydropower, solar power, thermal power, and biomass, to analyze its future satisfaction of demand. Constraints were imposed on maximum capacity development for each technology according to the potential of each national resource. That is, 4500 MWe for hydropower, 1700 MWe for biomass, 5000 MWe for solar power, and 4300 MWe for thermal power [
8]. The purpose of this scenario was to evaluate the worst scenario for Uganda if it only develops current technologies to their full potential.
- (ii)
The reference scenario
This scenario is based on Uganda’s plans for development of new electricity-generating technologies; these include geothermal, large nuclear reactor, and peat [
8,
9]. Uganda is looking forward to the construction of two large nuclear reactor units, each with a capacity of 1000 MWe, with a predicted start-up date of 2032 [
36]. However, until now the exact reactor type has not been decided. Due to much experience with the operation of light water-cooled reactors in the nuclear industry, this scenario assumed that the reactor type to be constructed by Uganda is an advanced pressurized water reactor, represented in this study as advanced PWR. The modeling for geothermal and peat was also completed by imposing constraints on total installed capacities based on the potential of these resources described in Uganda Vision 2040 [
8]. This scenario analyzed the role of new electricity-generating technologies in expanding Uganda’s future electricity-generating system in scenario (i).
- (iii)
The optimistic scenario
In this scenario, this study proposed SMRs to be integrated in Uganda’s future energy system, which would look like the reference scenario above to factor in Uganda’s financial and infrastructure environment. With respect to the nature of the current SMR development, the majority of the designs are based on light water reactor technology due to mature experience with the operation of large light water nuclear reactors. Therefore, this study proposed an integral pressurized water reactor type of SMRs, represented as i-PWR (SMR), with a projected starting capacity of 100 MWe in 2035. A constraint of 100 MWe maximum annual capacity addition was imposed on the growth rate of SMRs in the model. All other assumptions of this scenario are similar to the reference scenario.
2.4. The Levelized Cost of Energy (LCOE)
The study also performed an economic analysis based on the levelized cost of energy (LCOE). The levelized cost of energy is the principal tool for comparing plant-level unit costs for different baseload technologies over their operating lifetimes [
37]. The LCOE corresponds to the average price that consumers have to pay for the electricity supplied to offset all costs incurred by the plant owner or operator, such as the cost of capital (including expected remodeling, operation and maintenance costs, decommissioning, and fuel cost capital [
38,
39]. The main objective of the economic analysis was to assess the future nuclear energy generation cost competitiveness compared to other competing technologies for electricity generation in Uganda, namely hydropower, solar, solar hybrid, peat, geothermal, biomass, and thermal power plants. The economic analysis was performed by calculating the LCOE for each technology using the equation given below [
40].
where
is the overnight capital cost in USD
$/kW,
is the capital recovery factor,
is the capacity factor in percentage,
is the fixed operation and maintenance cost in US
$/kW-year,
is the variable operation and maintenance cost in US
$/MWh,
is the fuel cost in US
$/MWh, and HR is heat rate in BTU/kWh.
The units for the LCOE are US
$/MWh; therefore, all variables in the equation were converted to similar units before the calculation. Capital recovery factor (CRF) is the ratio of a constant annuity to the present value of receiving that annuity for a given length of time [
25]. It is calculated using the number of periods (
n) and the discount rate per period
i, in the following equation:
LCOE analysis has been used widely by academia, national organizations, and inter-governmental organizations to compare the competitiveness of different electricity technologies, for example, to make policy decisions between fossil fuel sources and renewable energy sources [
38,
41,
42,
43]. Limitations to the LCOE approach have been addressed in many studies, including uncertainty of future costs, treatment of discount rates and inflation rate based on assumptions, and inability to deal with wider system costs [
43,
44,
45,
46]. Studies providing alternative approaches to the LCOE have been completed; these are based on analyzing the total systems cost rather than plant level costs to account for intermittence and variability [
47,
48,
49,
50].
Sensitivity analysis was performed, highlighting the effect of various perturbations on the LCOE (e.g., discount rate, fixed O&M costs, and overnight capital costs). To confirm the validity of the economic analysis, the LCOE’s robustness index (RI) was calculated, taking into account the simultaneous fluctuations of several input parameters of nuclear and alternative power plants. The robustness index (RI) can be defined as the ratio of the costs associated with alternative sources divided by the costs of nuclear sources. This relationship is commonly referred to as the relative cost-competitive ratio between nuclear energy and alternative technologies. When tolerance limits are defined, the higher the RI value, the better the performance. A given nuclear technology is “more robust” when the indicator value is far from the acceptable limit and “less robust” when the indicator value is close to the acceptable limit. Current competitive analysis assumes a tolerance of 1.0. If the RI ratio is greater than 1.0, nuclear technology is cost competitive with alternative technologies [
51].
Table 2 and
Table 3 below show input data used for MESSAGE code simulation and LCOE calculations.
Figure 3 shows the approach followed by the study for analysis.
4. Discussion
In the BAU scenario, the electricity generation mix is limited to the existing technologies as of 2020, that is, hydro, solar, biomass, and thermal power plants. An electricity shortage of 156 MWe begins in 2035 and the deficit expands to 2109 MWe in the last year due to inadequate generation capabilities of the energy mix. This scenario shows that even if the existing electricity-generating technologies are utilized to their full potential, they cannot meet the future electricity demand as shown by the results in this scenario. For example, if fully utilized, the full potential of hydro resources add up to a total of 4500 MWe [
8]; moreover, some of the existing hydro power plants, such as Nalubaale Hydroelectric Power Station with a capacity of 180 MWe, is about to reach the end of its design life after operating for 68 years. In addition, this scenario predicts an energy mix that is dominated by renewables (100% contribution) at the end of the modeling period, which makes the Ugandan electricity generation systems vulnerable to changes in climate conditions such as floods, which could devastate the country’s generation capacity. This scenario shows that the existing electricity generation mix is insufficient to meet Uganda’s electricity demand in the future, which calls for energy mix diversification to bring in new technologies that are more efficient and do not depend on climate conditions, such as nuclear and geothermal power.
The reference scenario was formulated based on Uganda Vision 2040 and Uganda’s energy policy draft of 2019 [
9] to diversify the energy mix by adding new electricity technologies, such as peat, geothermal, and nuclear energy, to increase generation capacity, and by reducing the impact of climate changes on the electricity generation supply. The results show that the total electricity generation capacity increased by 34% at the end of the modeling period and the electricity capacity grew beyond peak demand, which offset the electricity deficit that was seen in the BAU scenario. The optimistic scenario shows that for nuclear power to play a significant role in the future energy system, SMRs should be adopted as the total share of nuclear, increased from 21% in the reference scenario to 30%. This scenario shows that SMRs are competitive with other electricity technologies, which justifies the need for Uganda to consider SMRs in its future energy mix, helping to provide a stable and clean source of energy to compliment the intermittent hydroelectric power and solar power plants. A high discount rate gives more weight or importance to present expenditures than to future ones, while a low discount rate reduces these differences, favoring technologies that have high investment costs but low operating costs, which means that capital-intensive technologies such as nuclear power plants should come in at low discount rates. The results obtained for the LCOE were compared to those obtained in the surveyed literature. LCOE values from a study conducted by the US Energy Information Administration [
52] for geothermal, biomass, solar hybrid, solar (PV), Adv-PWR, and hydropower technologies were compared with the calculated values from this study, while LCOE comparison for SMRs and thermal power was performed with different studies, respectively [
56,
57]. No literature was available for LCOE comparison with peat power plants. LCOE values for geothermal, solar hybrid, solar (PV), Adv-PWR, and i-PWR (SMR) deviated by smaller margins, while significant differences were reported for thermal and biomass plants, as shown in
Figure 8. The disparity in LCOE values for thermal power plants is majorly due the fact the literature study used the 2003 US dollar for calculating costs while this study used the 2020 US dollar. Meanwhile, the disparity in LCOE values for biomass is due to differences in costs assumed in either studies. For example, this study used United States generic costs due to the absence of data for Uganda; this can lead to discrepancies in calculated values. For example, LCOE values for biomass are likely to be far less in Uganda due to an abundance of fuel for this resource, significantly cutting fuel costs. For SMRs, actual LCOE values in Uganda are likely to be higher than those calculated in this study or used as a reference in other studies due to high costs that will be incurred in developing infrastructure for SMRs, considering that the country has little nuclear infrastructure. However, these costs are expected to be higher for the first SMRs and relatively lower for the one of a kind SMRs due technology learning and sufficient infrastructure development in the future. The calculated LCOE values for solar hybrid are higher than those of solar (PV) due to additional costs required for the installation of the battery storage for a hybrid solar PV plant; however, a hybrid solar plant comes with the advantages of better efficiency due to its ability to store power and provide it whenever required.