Asnor, A.S.; Al-Mohammad, M.S.; Wan Ahmad, S.; Almutairi, S.; Rahman, R.A.
Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia. Sustainability 2022, 14, 6231.
https://doi.org/10.3390/su14106231
AMA Style
Asnor AS, Al-Mohammad MS, Wan Ahmad S, Almutairi S, Rahman RA.
Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia. Sustainability. 2022; 14(10):6231.
https://doi.org/10.3390/su14106231
Chicago/Turabian Style
Asnor, Asri Syahmi, Mohammad S. Al-Mohammad, Saffuan Wan Ahmad, Saud Almutairi, and Rahimi A. Rahman.
2022. "Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia" Sustainability 14, no. 10: 6231.
https://doi.org/10.3390/su14106231
APA Style
Asnor, A. S., Al-Mohammad, M. S., Wan Ahmad, S., Almutairi, S., & Rahman, R. A.
(2022). Challenges for Implementing Environmental Management Plans in Construction Projects: The Case of Malaysia. Sustainability, 14(10), 6231.
https://doi.org/10.3390/su14106231