Wang, D.; Liu, G.; Li, K.; Wang, T.; Shrestha, A.; Martek, I.; Tao, X.
Layout Optimization Model for the Production Planning of Precast Concrete Building Components. Sustainability 2018, 10, 1807.
https://doi.org/10.3390/su10061807
AMA Style
Wang D, Liu G, Li K, Wang T, Shrestha A, Martek I, Tao X.
Layout Optimization Model for the Production Planning of Precast Concrete Building Components. Sustainability. 2018; 10(6):1807.
https://doi.org/10.3390/su10061807
Chicago/Turabian Style
Wang, Dong, Guiwen Liu, Kaijian Li, Tongjing Wang, Asheem Shrestha, Igor Martek, and Xiaobo Tao.
2018. "Layout Optimization Model for the Production Planning of Precast Concrete Building Components" Sustainability 10, no. 6: 1807.
https://doi.org/10.3390/su10061807
APA Style
Wang, D., Liu, G., Li, K., Wang, T., Shrestha, A., Martek, I., & Tao, X.
(2018). Layout Optimization Model for the Production Planning of Precast Concrete Building Components. Sustainability, 10(6), 1807.
https://doi.org/10.3390/su10061807