Open AccessArticle
Sustainability 2018, 10(1), 231; https://doi.org/10.3390/su10010231

Sustainability Evaluation of Power Grid Construction Projects Using Improved TOPSIS and Least Square Support Vector Machine with Modified Fly Optimization Algorithm

1
School of Economics and Management, North China Electric Power University, Beijing 102206, China
2
State Grid Economic and Technological Research Institute Co., Ltd., Beijing 102210, China
*
Author to whom correspondence should be addressed.
Received: 16 December 2017 / Revised: 7 January 2018 / Accepted: 15 January 2018 / Published: 18 January 2018
Full-Text   |   PDF [1092 KB, uploaded 18 January 2018]   |  

Abstract

The electric power industry is of great significance in promoting social and economic development and improving people’s living standards. Power grid construction is a necessary part of infrastructure construction, whose sustainability plays an important role in economic development, environmental protection and social progress. In order to effectively evaluate the sustainability of power grid construction projects, in this paper, we first identified 17 criteria from four dimensions including economy, technology, society and environment to establish the evaluation criteria system. After that, the grey incidence analysis was used to modify the traditional Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS), which made it possible to evaluate the sustainability of electric power construction projects based on visual angle of similarity and nearness. Then, in order to simplify the procedure of experts scoring and computation, on the basis of evaluation results of the improved TOPSIS, the model using Modified Fly Optimization Algorithm (MFOA) to optimize the Least Square Support Vector Machine (LSSVM) was established. Finally, a numerical example was given to demonstrate the effectiveness of the proposed model. View Full-Text
Keywords: improved TOPSIS; MFOA; LS-SVM; sustainability evaluation; power grid construction projects improved TOPSIS; MFOA; LS-SVM; sustainability evaluation; power grid construction projects
Figures

Figure 1

This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. (CC BY 4.0).
SciFeed

Share & Cite This Article

MDPI and ACS Style

Niu, D.; Li, Y.; Dai, S.; Kang, H.; Xue, Z.; Jin, X.; Song, Y. Sustainability Evaluation of Power Grid Construction Projects Using Improved TOPSIS and Least Square Support Vector Machine with Modified Fly Optimization Algorithm. Sustainability 2018, 10, 231.

Show more citation formats Show less citations formats

Note that from the first issue of 2016, MDPI journals use article numbers instead of page numbers. See further details here.

Related Articles

Article Metrics

Article Access Statistics

1

Comments

[Return to top]
Sustainability EISSN 2071-1050 Published by MDPI AG, Basel, Switzerland RSS E-Mail Table of Contents Alert
Back to Top