A Load Restoration Approach Based on Symmetrical Demand Response Incentive Mechanism

1
School of Electric Power Engineering, South China University of Technology, Guangzhou 510641, China
2
CSG Electric Power Research Institute, Guangzhou 510663, China
3
China Southern Power Grid, Guangzhou 510530, China
*
Author to whom correspondence should be addressed.
Energies 2025, 18(11), 2677; https://doi.org/10.3390/en18112677
Submission received: 10 April 2025 / Revised: 9 May 2025 / Accepted: 19 May 2025 / Published: 22 May 2025
(This article belongs to the Special Issue Advances and Optimization of Electric Energy System—2nd Edition)

Abstract

:
Demand response (DR) has high regulation potential, which can reduce the power supply–demand imbalance caused by extreme disasters. However, its actual effectiveness still needs to be improved because of low user willingness and incomplete compensation mechanisms. To address this issue, a symmetrical incentive mechanism for DR is proposed. Building upon this mechanism, a bi-level load restoration optimization model under extreme events is proposed. The upper-level model minimizes grid-side costs during load restoration, determining load restoration ratios and incentive coefficients transmitted to the lower level. The lower-level model maximizes user profits while considering comfort-level losses from DR participation, solving for actual response quantities that are fed back to the upper level. To efficiently solve the proposed load restoration model, an iterative mixed-integer load restoration solver is proposed. Case studies demonstrate that the proposed symmetrical mechanism achieved an 89.6% participation rate, showing a 2.46% improvement over fixed incentive schemes. Grid payment costs were reduced by CNY 365,400, achieving incentive compatibility that facilitates rapid load restoration post extreme disasters.

1. Introduction

Natural disasters (such as earthquakes, hurricanes, and floods), human-made disasters (such as terrorist attacks and cyber attacks), and equipment aging can lead to power system failures, resulting in widespread power outages. Between 2017 and 2020, approximately 100 million people were affected by extreme weather each year [1]. In the United States, weather-related power outages caused up to USD 55 billion losses annually [2]. This reflects the importance of ensuring the resilience of the power system in the face of extreme events.
In traditional load restoration methods, scholars have made significant progress. Early research focused on the design of black-start schemes, gradually restoring network architecture through the self-starting capability of thermal power units or microgrid systems [3,4]. With the increasing penetration rate of renewable energy, research gradually shifted towards multi-timescale collaborative optimization [5,6]. However, traditional methods still have limitations in dealing with load dynamics, source–load interactions, and communication dependencies.
Integrating flexible resources is another effective method to help with rapid load restoration [7,8]. At present, there are two main flexible resource coordination mechanisms for power supply reconstruction: the first is the complementary scheduling of traditional power generation units and distributed power sources [9]; the second is the dynamic configuration of mobile energy storage devices, emergency power generation equipment, and multigrid coupling devices based on energy coupling characteristics [10]. However, the above research only considered achieving rapid load restoration by scheduling flexible resources on the power supply side, and did not fully consider the impact of the demand side on the restoration method.
In extreme disasters, the speed and efficiency of load recovery are crucial. Although the traditional black-start scheme and multi-timescale collaborative optimization method are effective, they also have some limitations. First, black-start scheme depends on the self-starting ability of thermal power units or microgrid systems, which may take a long time to restore power supply, and in some cases, the starting process of thermal power units may be limited by fuel supply and equipment status. Secondly, although multi-timescale collaborative optimization can improve the overall efficiency of the system, its complexity and dependence on real-time data may lead to delays in response time.
In contrast, demand response, as a flexible load management strategy, can accelerate the restoration process of the power grid by encouraging users to reduce power consumption during peak demand periods or rapidly increase their load after power supply restoration. DR has two advantages: First, it reduces the complexity of the recovery path. While traditional black-start schemes need to restore the line and power level by level, DR reduces the dependence on line operation time by dynamically adjusting the demand-side loads. Second, it enhances the robustness of the system. Traditional methods are vulnerable to power node failures. However, DR can maintain power supply in key areas through flexible adjustment on the demand side to improve recovery reliability by taking advantage of the dispersion of resources on the load side, even if part of the power supply fails. In addition, demand response can flexibly respond to the actual demand changes in the power grid through real-time feedback and dynamic adjustment, avoiding the problems of resource waste and inefficiency that may occur in traditional methods. Therefore, demand response can not only effectively supplement the shortcomings of traditional methods, but also improve the resilience and flexibility of the overall power grid, providing a new solution for load recovery after extreme disasters.
Under extreme disasters, user-side resources have faster response speeds and more flexible regulation capabilities [11], which can effectively enhance the system’s resilience and promote load restoration [12,13]. Therefore, this article considers DR as a flexible resource and explores its positive role in load restoration. At present, there have been numerous studies on the application of DR in load restoration scenarios in the existing literature. Reference [14] constructed a coupon incentive model to optimize the social profits of DR. Reference [15] accelerated post-disaster load restoration by integrating mobile emergency generators with producer and consumer communities and coordinating supply- and demand-side resources. Reference [16] established an operational optimization model for residential DR and distribution network restoration, utilizing DR to assist in the rapid restoration of the distribution network. Reference [17] proposed a price-based DR method for aggregate temperature-controlled loads for load frequency control. Reference [18] proposed a direct load control (DLC) and load shedding method to minimize power outages and reduce the peak-to-average load ratio in the event of sudden changes in grid load. The above literature demonstrates the potential of incentive-based response in terms of price and purchasing method. However, it ignores users’ proactive response behavior (such as economic profits, comfort preferences, etc.), which affects the practicality of the method. In practical situations, most consumers may not be interested in DR strategies or lack motivation to participate, especially without incentives.
This article proposes a bi-level optimization method for load restoration under extreme events based on a symmetrical DR incentive mechanism. This method coordinates the profit of the grid and user sides by constructing a bi-level optimization model. The upper-level model aims to minimize the cost of load restoration on the grid side and optimize decision variables including the user energy supply ratio, incentive coefficients, and response clearing quantity. The lower-level model maximizes users’ profits while considering the comfort loss caused by user participation in DR.
The contributions of this article are summarized as follows:
(1)
A symmetrical demand response incentive mechanism is proposed, which differs from traditional monotonic mechanisms. In this proposed mechanism, the incentive coefficient is negatively correlated with the absolute difference between a user’s actual response quantity and their declared quantity. Moreover, the incentive coefficient is obtained through an optimized approach by constructing an optimal incentive model on the grid side.
(2)
A bi-level mixed-integer nonlinear optimization model is constructed to achieve the synergy of interests between the grid and users. The upper-level nonlinear optimization model aims to minimize the total operating cost of the system under extreme scenarios by optimizing the energy supply ratio, tiered incentive coefficients, and demand response clearing quantities for users. The lower-level mixed-integer nonlinear model takes into account the loss of user comfort, with the goal of maximizing overall benefits by optimizing the actual response quantity of each user.
(3)
To achieve efficient solving of the bi-level optimization model, a linear-reconstruction-based bi-level iterative solving algorithm is proposed. In the upper-level model, a linear function is used to fit the relationship between the clearing price and the clearing quantity, allowing for the determination of the user’s energy supply ratio and incentive coefficients. In the lower-level model, the piecewise incentive function is linearized using the Big M method, reconstructing it into mixed-integer linear constraints. The upper and lower levels iteratively solve for the coupling variables of energy supply ratio, incentive coefficients, and actual response quantities to obtain a balanced solution that satisfies the interests of both the grid and the users.

2. Symmetrical Incentive Mechanism for Demand Response

On the response day, the user must provide the response quantity according to the contracted amount. The effectiveness of the response is then assessed by the grid company based on the actual response quantity. Typically, subsidies are provided to users with valid responses through equal incentives. These subsidies are given based on a subsidy mechanism set by the grid company. However, responses that exceed the contracted capacity will not receive additional subsidies. Therefore, the incentive coefficient ω j for user j translates into a subsidy unit price ω j θ clr , and the DR subsidy C j DR for user j can be expressed as follows:
C j DR = ω j θ clr P j DR
ω j = α 0 ,    P j DR P j B < δ 0 α 1 ,    δ 0 P j DR P j B < δ 1 α 2 ,    δ 1 P j DR P j B < δ 2 α 3 ,    δ 2 P j DR P j B
where P j DR and P j B represent the actual response quantity and the contracted response quantity for user j, respectively. θ clr represent the demand response clearing price. α 0 α 3 represent the incentive coefficients corresponding to the interval of the ratio between the user’s actual response and the winning scalar. δ 0 , δ 1 and δ 2 denote the compliance ratios, the normal ratios, and the cap ratios. These three values are usually set to 80%, 100% and 120%. This is the incentive coefficient value implemented in the initial stage of demand response in Guangzhou and Jiangsu regions of China [19,20].
A significant discrepancy often exists between users’ actual response and the contracted quantity, resulting in poor load restoration outcomes. Therefore, an incentive mechanism is necessary to guide users to participate in DR, as shown in Figure 1a. However, in the initial stage of demand response market, there are several problems, such as small response scale, low response willingness, and imperfect economic compensation mechanism.
To address this issue, a symmetrical DR incentive mechanism is proposed. This mechanism determines different subsidy price discounts based on the ratio of the actual response quantity to the contracted quantity. The greater the deviation between the user’s actual response quantity and the contracted quantity, the lower the tiered subsidy price per unit. The tiered incentive coefficient ω j can be expressed as follows:
ω j = 0 ,    P j DR P j B < δ 0 y i ,    δ i 1 P j DR P j B < δ i y k ,    δ k P j DR P j B
where y i represents the incentive coefficient for the i-th segment, y k denotes the cap incentive coefficient, and δ i 1 and δ i represent the left and right boundaries of the i-th segment interval, respectively.
As shown in Figure 1b, the closer the ratio of the response quantity to the contracted quantity is to 100%, the larger the tiered incentive coefficient. When the right boundary of the incentive interval i exceed 100%, the tiered incentive coefficient satisfies y i > y i + 1 ; conversely, y i < y i + 1 . To improve the settlement efficiency and avoid users’ strategic behavior, the tiered DR incentive coefficient is symmetrically designed around 100%. The discount coefficients for the positive and negative deviations of the actual response quantity from the contracted quantity are the same. Therefore, the tiered incentive coefficient must satisfy the following constraints:
δ i y i y i + 1 y i y i + 1
y i C + x = y i C x ,   0 < x I i C
δ i C + x + δ i C x 1 = 2 ,   0 x < I i C
where i C represents the central interval index of the tiered DR incentive mechanism, and x denotes the distance between the tiered interval index and the central interval index.
Experiments indicate that the incentive mechanism shown in Figure 1b is more effective than the traditional incentive mechanism in Figure 1a. It better encourages users to participate in demand response and helps with load recovery during extreme disasters.

3. Bi-Level Optimization Model for Load Restoration

This section proposes a bi-level optimization model for load restoration under extreme conditions. The model is based on a symmetrical demand response incentive mechanism. It takes into account the profits of both the power grid and users, ensuring a balanced approach to load restoration. Figure 2 shows the structure of the model. The upper level is a load restoration model. Its goal is to minimize the total payments made by the grid. This model determines the demand response (DR) clearing price for each user. It also calculates the clearing quantity for each user. These values are then passed to the lower level of the model. The lower level is a response decision model. Its goal is to maximize the comprehensive profits of each user participating in DR. This model determines the actual response quantity for each user. It also calculates the step incentive coefficient. These results are then fed back to the upper level of the model. This iterative process continues until an optimal solution is found that balances the interests of both parties.

3.1. Upper-Level Model

The load restoration model aims to alleviate the supply–demand imbalance by optimizing energy allocation. This model allocates energy based on the extent of user participation in DR and the currently available generation capacity. The load shedding penalty is incurred when the actual load allocation is lower than the demand.
In addition, compared with only using load recovery or reliability as the objective function, using cost as the objective function in Equation (7) can more effectively coordinate the upper and lower levels of models and achieve the comprehensive optimization of the power system at the economic and technical levels.
Therefore, the objective function of the upper-level model is to minimize the sum of load shedding penalty costs and DR costs, as shown in Equation (7).
min j Γ n t T C t , j shed + C t , j DR
where Γ n represents the set of users connected to node n; T is the set of time periods; C t , j shed and C t , j DR denote the load shedding penalty cost and the DR incentive cost, respectively, as shown in Equations (8) and (9):
C t , j shed = C t , j load L t , j w j 1 γ t , j
C t , j DR = ω t , j θ clr P t , j DRact
where C t , j load represents the penalty of load shedding per MW; L t , j represents the load quantity; w j represents the priority of load j; γ t , j is the energy supply ratio, representing the ratio of the load supplied by the system to the user’s demand; θ clr is the clearing price of DR; ω t , j is the incentive coefficient for user j; P t , j DRact is the actual response quantity.
The constraints of the upper level are as follows:
(1)
Node power balance constraint
u Θ n P t , u DG + j Γ n P t , j DRact γ t , j L t , j = P t , n
u Θ n Q t , u DG j Γ n γ t , j L t , j = Q t , n
where Θ n and Γ n represent the set of generators and users connected to node n, respectively; P t , u DG and Q t , u DG represent the active and reactive power of the generator at node n, respectively; P t , n and Q t , n represent the active and reactive power injection at node n, respectively.
(2)
Power flow constraint
P t , n = m Θ , m n k n m 2 x n m θ t , n θ t , m + k n m 1 x n m V t , n V t , m
Q t , n = m Θ , m n k n m 1 x n m θ t , n θ t , m + k n m 2 x n m V t , n V t , m
P t , n m = k n m 2 x n m θ t , n θ t , m + k n m 1 x n m V t , n V t , m
Q t , n m = k n m 1 x n m θ t , n θ t , m + k n m 2 x n m V t , n V t , m
where V t , n and θ t , n are the voltage magnitude and phase angle of node n, respectively; P t , n m and Q t , n m represent the active and reactive power flowing through line n-m; k n m 1 = r n m x n m / r n m 2 + r n m 2 , k n m 2 = x n m 2 / r n m 2 + x n m 2 ; r n m and x n m are the resistance and reactance of line n-m.
(3)
Security constraint
To ensure the safe operation of the system, the voltage at each node and the power flow on each branch should be limited within a specific range:
P n m min P t , n m P n m max Q n m min Q t , n m Q n m max V n min V t , n V n max
where P n m max , P n m min and Q n m max , Q n m min represent the upper and lower limits of active and reactive power on line n-m, respectively; V n max and V n min represent the upper and lower limits of voltage at node n.

3.2. Lower-Level Model

The subsidy for users participating in DR is determined based on their actual electricity reduction. The reduction affects users’ power usage arrangements and lowers their comfort level. The lower-level model considers two main factors. First, it looks at the subsidies for user participation in DR. Second, it takes into account the comfort loss experienced by users. The goal of this model is to maximize overall profit. Additionally, it aims to optimize the actual response electricity. The objective function and related constraints are as follows:
max U j = C t , j DR φ j P t , j DRact   s . t .   P j DRact , min P t , j DRact P j DRact , max
where U j represents the comprehensive profit of user j participating in DR; C t , j DR denotes the DR subsidy received by the user; P j DRact , max and P j DRact , min are the upper and lower limits of the response quantity for user j, respectively.
The comfort loss is related to the user’s willingness and ability to respond: the desire to respond can be represented by the user’s response quantity under unit incentive subsidy; the ability to respond depends on the user’s energy dependency and energy usage. As the amount of electricity reduction increases, the user’s comfort loss also increases. This means that there is a positive correlation between electricity reduction and comfort loss. Additionally, the increase in comfort loss is marginal. Therefore, the comfort loss can be expressed using the following quadratic function:
φ j ( P t , j DRact ) = 1 2 a j ( P t , j DRact ) 2 + b j P t , j DRact
where φ j P t , j DRact is the comfort loss of user j participating in DR; a j and b j are the comfort loss coefficients of user j participating in DR; P t , j DRact is the actual response quantity of user participation in DR.
The comfort loss coefficient can be adjusted according to the urgency of users’ electricity demand under varying weather and temperature conditions. For example, electricity demand significantly increases when users face urgent production orders. At this time, reducing electricity usage may lead to substantial losses, thereby lowering their willingness to participate in DR, which is reflected in the expression of comfort loss as a higher comfort coefficient. Additionally, the maintenance and repair of electrical equipment can also affect their comfort during the actual response phase. Therefore, comfort loss can effectively reflect the urgency of users’ electricity demand.
The loss of users’ electrical comfort indicates users’ satisfaction with electricity and also reflects the response cost of users’ participation in DR. Users have the most optimal value for power consumption. Deviation from this value will reduce users’ comfort degree of power consumption, and the loss of comfort degree has a marginal effect. Therefore, a quadratic function can be used to represent users’ comfort loss.
The electric comfort of different types of users is quite different. This paper estimates the comfort loss function based on the historical reporting results of users in the DR market. This estimation method assumes that a user’s quotation in the DR market is not lower than the marginal value of its response cost, as shown in Figure 3, where θ j 1 , θ j 2 , P j DR 1 and P j D R 2 , respectively, represent the declared price and declared volume of user j’s first and second participation in the DR market. For the convenience of explanation, only the first two quotations of users are considered in the figure, and the estimation method is similar in the case of multiple quotations. There are four situations:
(1)
θ j 1 > θ j 2 and P j DR 1 > P j DR 2 . It means that the price and quantity of user j’s second declaration are less than those of user j’s first declaration. Under the condition of user rationality, it can be considered that the marginal cost of user response on 0 , P j DR 1 is not higher than θ j 2 , and the marginal cost of user response on P j DR 1 , P j DR 2 is not higher than θ j 1 . Therefore, the piecewise linear function composed of red and yellow line segments in Figure 3a can be used to approximate the comfort loss function of user j.
(2)
θ j 1 > θ j 2 , P j DR 1 < P j DR 2 . It means that the price of user j’s second declaration is less than that of the first, but the quantity of declaration is greater than that of the first. Under the condition of user rationality, it can be considered that the marginal cost of the user’s response on 0 , P j DR 2 is not higher than that of θ j 2 . Therefore, the linear function represented by the red line segment in Figure 3b is used to approximate the comfort loss function of user j.
(3)
When in situations θ j 1 < θ j 2 , P j DR 1 > P j DR 2 or θ j 1 < θ j 2 , P j DR 1 < P j DR 2 , the same applies.
Figure 3. Estimation diagram of comfort loss function.
Figure 3. Estimation diagram of comfort loss function.
Energies 18 02677 g003

4. Iterative Mixed-Integer Load Restoration Solver

The proposed load restoration model (1)–(18) is a mixed-integer nonlinear programming problem. The solution complexity stems from the coupling relationship between the upper- and lower-level models. Additionally, the objective function and constraints exhibit nonlinear characteristics. Rapid load restoration after extreme disasters imposes higher requirements on the computational efficiency. To address this issue, an iterative mixed-integer load restoration solver is proposed. This solver coordinates the optimization processes of the upper- and lower-level models, gradually approaching the optimal solution. The flowchart of the proposed solution algorithm is shown in Figure 4. In addition, Appendix A had given the convergence proof of the algorithm.
(1)
Initialization. The parameters, including the tiered incentive intervals δ i , initial tiered incentive coefficients y i , and user priority levels w j , are set. The iteration counter is initialized as s = 1 .
(2)
The power supply ratio γ t , j  and maximum demand response P t , j B , max are calculated. Neglecting the impacts of DR (i.e., setting P t , j , s DRact = 0 ), the optimization problem in Equations (7)–(16) is solved to obtain the power supply ratio γ t , j and maximum demand response P t , j B , max .
(3)
The clearing quantity of DR P t , j B is calculated. A piecewise linear function is used to fit the relationship between the DR clearing price θ clr and the total clearing quantity P t B , as shown in Equation (19).
θ clr = k P t B + b
Substituting the fitting results into Equation (9) yields the following:
C t , j DR k P t B + b P t , j B
where k and b are the fitting parameters; P t , j B denotes the clearing quantity of user j which satisfies the following relationship:
P t B = j = 1 J P t , j B 0 P t , j B P t , j B , max
where P t , j B , max denotes the maximum DR capacity that user j can provide, as obtained in Step (2).
In Equation (20), two simplifications are carried out: (1) the incentive coefficients ω t , j is neglected; (2) the actual DR quantity is replaced by the clearing quantity.
(4)
The actual DR quantity P t , j DRact is calculated. In the s − 1 iteration, the tiered incentive coefficients y i , s 1 , the DR clearing quantity P t , j B , and the clearing price θ clr are used as inputs to solve optimization problems (9), (17), (18), (22), (24) and (26). The actual DR quantity is determined by solving a quadratic programming problem.
Additionally, the functions in Equation (3) are linearized as follows. A new auxiliary integer variable Z i is introduced. Equation (3) is then equivalent to the following constraints.
i = 1 I Z i = 1
r i = Z i y i
ω j = i = 1 I r i
P j DRact < δ 0 P j B + 1 Z 0 M P j DRact < δ i P j B + 1 Z i M P j DRact δ i 1 P j B ( 1 Z i 1 ) M P j DRact δ k P j B 1 Z k M
Note that y i , δ i , and δ k are known parameters in Equations (22)–(25). Furthermore, Equation (23) can be expressed as follows:
r i r max Z i r i y i r i y i r max 1 Z i
where r max denotes the maximum value of r i .
(5)
The energy supply ratio γ t , j and tiered incentive coefficients y i are updated. Based on the actual DR quantity P j DRact and the clearing price θ clr , the optimization problem (4), (5), (7)–(16), (22), (25) and (26) is solved. Then, the updated energy supply ratio γ t , j and tiered incentive coefficients y i are calculated.
(6)
Next, convergence check is carried out. The proposed solution algorithm stops when the difference in the energy supply ratio γ t , j in two consecutive iterations is less than a certain tolerance ε, as shown in Equation (27). If convergence is not achieved, we return to Step (4) for further iteration.
γ t , j , s γ t , j , s 1 ε
where γ t , j , s denotes the energy supply ratio of user j at time t in the s-th iteration, and ε denotes the prescribed restoration parameter.

5. Case Study

5.1. Basic Data

This section validates the effectiveness of the proposed method using a modified IEEE 9-bus system. The system includes 8 users (U1–U8) and 3 thermal power units. Figure 5 shows the topology of the modified IEEE 9-bus system, where U0 is the reference node. The normal and basic load of each user are shown in Figure 6. The load-shedding penalty coefficient was 137.56 CNY/MWH [21]. The priority coefficient of users can be divided into three levels: 100, 10, and 0.2 [22], which is listed in Table 1. The thermal units, G1, G2, G3, and G4, have installed capacities of 646 MW, 652 MW, 687 MW and 1000 MW, respectively. The price–quantity relationship was estimated by fitting historical data. The data used were from the previous 10 DR clearing quantities and clearing prices, as shown in Figure 7. It was assumed that an extreme disaster causes the shutdown of thermal unit G4, leading to an imbalance between power supply and demand. The prescribed restoration parameter ε was set to 0.01.
The case study primarily analyzed variations in user profit, incentive coefficients, actual response quantities, clearing prices, grid payments, and tiered incentive coefficients under different conditions. Section 5.2 compared the effects of fixed and time-varying step incentive coefficients on the model solution. The effectiveness of the symmetrical DR incentive mechanism in reducing the cost of the grid and enhancing the profits of users were verified. Section 5.3 evaluated the effects of different tiered incentive intervals on user’s profit and the cost of the grid.
The simulation program was run on a PC with an Intel i5-9300H processor, 2.40 GHz, and 8.00 GB RAM. The commercial solver, CPLEX12.9, under Python3.7 environment, was used to solve the model proposed in this paper.

5.2. Impacts of Fixed and Optimized Symmetrical Incentive Coefficients

In this section, the tiered incentive coefficients are set to fixed values (Scenario M1) and optimized values (Scenario M2), as shown in Table 2.
Figure 8, Figure 9, Figure 10 and Figure 11 show the incentive coefficients, clearing quantity, actual response quantities, and profits. Compared with Scenario M1, the incentive coefficients of users U1, U2, U4, U5, U6 and U8 are higher in Scenario M2, as can be seen in Figure 8. The incentive coefficients of users U3 and U7 remain the same in both scenarios. Further comparison of the data in Figure 9 reveals the following: In Scenario M2, the incentive coefficients of users U1, U2 and U4–U6 all reach a peak of 1.2. This indicates that U1, U2 and U4–U6 show a high degree of enthusiasm for participating in DR. Their actual response quantities are almost equal to the cleared quantities. The incentive coefficients of users U3 and U7 are the lowest, at only 1.0. Their actual response quantities are significantly lower than the clearing quantities. In Scenario M1, the incentive coefficients of all users are maintained at a low level. Comparison analysis of Figure 9 shows the following: a large deviation exited between the actual response quantities and clearing quantities of users U1–U8. This situation was not conducive to the load restoration. By comparing the deviations between actual response quantities and clearing quantities, it is found that the optimized symmetrical incentive mechanism can significantly reduce this deviation. Therefore, the proposed model motivated users to actively participate in DR. This is beneficial for the rapid restoration of system load under extreme conditions.
As can be seen in Figure 10, the profits of each user in Scenario M2 are generally higher than those in Scenario M1. Additionally, from the perspective of the power grid, the costs required to be paid in scenarios M1 and M2 are CNY 3.466 million and CNY 3.638 million. Although the cost of power grid increases slightly, it balances the interests of the power grid and load and can encourage users to actively participate in demand response.
Meanwhile, the unit price of DR clearing also increased from 3.676 CNY/kW in Scenario M1 to 3.692 CNY/kW in Scenario M2. It can be concluded that the proposed symmetrical DR incentive mechanism not only enhances users’ enthusiasm for participating in DR, but also promotes the rapid restoration of load under extreme conditions. The users’ profit was increased. Moreover, the costs that the power grid incur was significantly reduced. A win-win situation was achieved.
In summary, the symmetrical DR incentive mechanism was more effective than the fixed symmetrical incentive mechanism. It was better at mobilizing users’ enthusiasm for participating in DR. Additionally, it is more effective in promoting the rapid restoration of power grid load under extreme conditions.

5.3. Impacts of Tiered Incentive Ranges Profit

By setting different tiered incentive ranges, data on user profit and the cost of the grid under different scenarios (N1–N7) were obtained. The impacts of different tiered incentive ranges on the profit of both the power grid and users were analyzed. Seven types of tiered incentive ranges (with intervals of 0.08, 0.10, 0.12, 0.14, 0.16, 0.18 and 0.20, respectively) were mainly considered, as shown in Table 3.
Figure 11 shows the profit of each user under the 7 scenarios. It can be seen that the profits of each user were maximized in Scenario N2 (the tiered incentive range is 0.10). Conversely, the profits of each user are minimized in Scenario N7 (the tiered incentive range is 0.20).
Figure 12 shows the costs that the power grid needs to pay. As can be seen in Figure 12, the cost paid by the power grid was minimized in Scenario N4, at approximately CNY 3.093 million. In contrast, the cost paid by the power grid was maximized in Scenario N3, which was CNY 0.591 million more than in Scenario N4. Therefore, it was the least favorable scenario for the power grid. Overall, as the interval of the tiered incentive range increases, the cost that the power grid needs to pay tended to rise.
Therefore, selecting the tiered incentive range was crucial for the profit of both the power grid and the load side. An optimal choice can only be made after comprehensively balancing the profit of both parties.

5.4. Discussion

A.
Reliability of DR under emergency scenarios
The core research objective of this paper is to verify whether demand response can effectively promote the rapid recovery of load in extreme disaster scenarios. The experimental results show that although there is a certain deviation between the actual response of some users and the clearing amount, the users’ participation in demand response significantly reduces the power supply pressure of the grid. Therefore, even if other flexible resources are included in the unified modeling system, demand response can still play an active and effective role in the load recovery process.
B.
The practical challenges of implementing the symmetrical incentive mechanism in real-world DR programs
(1)
In reality, the symmetrical incentive mechanism in the implementation of load recovery plan under extreme disasters faces many practical challenges. From the information level, the destruction of communication facilities caused by disasters leads to difficulties in obtaining information, and there is information asymmetry between users and power companies, which affects the rationality and fairness of incentive schemes. In terms of interest coordination, there are conflicts and inconsistencies between different users and between power companies and users, which makes it difficult to meet the needs of all parties and reach consensus at the same time. In terms of mechanism design, the incentive standard is difficult to determine due to various factors, and the incentive method is singular, which cannot effectively attract various users. In the external environment, the relevant laws and regulations are not perfect, and there is a lack of policy support and supervision. At the same time, public opinion is highly concerned about the fairness of the implementation of the incentive mechanism. Once problems occur, they will put enormous pressure on power companies.
(2)
It is very difficult to collect the comfort parameters of each user, so this paper proposes an estimation method, which has been described in detail in question 4.
(3)
The unit commitment problem of the model built in this paper is simpler than that of the actual power grid model, mainly because there are fewer Boolean variables in this paper, so the existing equipment in the actual power grid can completely solve the bi-level optimization model proposed in this paper.

6. Conclusions

This paper proposes a symmetrical demand response incentive mechanism, based on a bi-level load restoration optimization model. A bi-level iterative solution algorithm is proposed to balance the profits between grid and load entities. The case studies show the following:
(1)
The proposed model improved users’ proactive engagement in the DR by dynamically correlating response hierarchy with incentive intensity. The observed participation rate reached 95.34%, showing a 3.38% improvement over conventional fixed symmetrical incentive schemes.
(2)
From the cost–profit perspective, the cost of power grid measurement increases slightly, while the load-side profit experiences an increase of CNY 23,545.26. During grid stress conditions caused by supply–demand imbalance, the proposed model exhibits dual functionality: optimizing electricity consumption pattern while alleviating operational strain, thereby accelerating load restoration processes.
(3)
The proposed iterative mixed-integer load restoration solver eliminated the need for solving large-scale mixed-integer nonlinear programming problems. All tested scenarios converged within 1 min, thereby validating the computational efficiency for proposed nonlinear bi-level optimization model.
The model in this paper does not adequately address load uncertainty, as actual power system loads fluctuate, impacting model accuracy and reliability. Additionally, the demand response mechanism faces limitations; many users lack motivation to participate, even with incentives, prioritizing their operational needs over potential economic benefits. This highlights challenges in mobilizing user participation. Future research should focus on user participation uncertainty in DR, considering load fluctuations, and aim to create effective incentive mechanisms to enhance power system efficiency, stability, and reliability, especially after extreme events.

Author Contributions

Conceptualization, X.S. and Y.Z.; methodology, J.S. and H.Y.; software, J.S.; validation, X.X., Y.L. and Z.L.; formal analysis, Z.L.; investigation, X.X.; resources, Y.L. and H.Y.; data curation, Z.L.; writing—original draft preparation, Z.L. and H.Y.; writing—review and editing, Z.L. and Y.Z.; visualization, J.S. and H.Y.; supervision, Y.Z. and X.S.; project administration, Y.Z.; funding acquisition, Y.Z., H.Y., J.S. and Y.L. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the science and technology projects of China Southern Power Grid Corporation, grant number ZBKJXM20232458.

Data Availability Statement

The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.

Acknowledgments

The authors would like to thank all parties who indirectly supported this research.

Conflicts of Interest

Authors Yiyong Lei and Hao Yang were employed by the company China Southern Power Grid. The authors declare that this study received funding from of China Southern Power Grid Corporation. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Abbreviations

The following abbreviations are used in this manuscript:
DRDemand response

Appendix A

The algorithm proposed in this paper is a heuristic algorithm, which cannot currently be proven to converge finitely through mathematical theory. However, many experiments conducted during example debugging show that the proposed method has a good convergence effect. Figure A1a–c show the iteration of user power supply proportion, grid costs, and user benefits under different tolerances. The analysis shows that when the tolerance is set to 0.1, the algorithm only iterates 3 times; when the tolerance is set to 0.5, the algorithm iterates 4 times; when the tolerance is set to 0.01, the algorithm iterates 6 times; when the tolerance is set to 0.001, the algorithm iterates 31 times and finally reaches the upper limit of iteration and stops. It can be seen that the solution obtained by the algorithm is an approximately optimal solution.
Figure A1. Iteration times under different tolerance levels.
Figure A1. Iteration times under different tolerance levels.
Energies 18 02677 g0a1

References

  1. The New York Times. Climate-Change-Risks-by-Country. Available online: https://www.nytimes.com/interactive/2021/01/28/opinion/climate-change-risks-by-country.html (accessed on 1 March 2025).
  2. Panteli, M.; Mancarella, P. Influence of Extreme Weather and Climate Change on the Resilience of Power Systems: Impacts and Possible Mitigation Strategies. Electr. Power Syst. Res. 2015, 127, 259–270. [Google Scholar] [CrossRef]
  3. Lopes, J.A.P.; Moreira, C.L.; Madureira, A.G. Defining Control Strategies for Microgrids Islanded Operation. IEEE Trans. Power Syst. 2008, 21, 916–924. [Google Scholar] [CrossRef]
  4. Cai, N.N.; Xu, X.F.; Mitra, J. A Hierarchical Multi-Agent Control Scheme for a Black Start-Capable Microgrid. In Proceedings of the IEEE Power and Energy Society General Meeting, Detroit, MI, USA, 24–28 July 2011; pp. 1–7. [Google Scholar] [CrossRef]
  5. Ti, B.Z.; Li, G.Y.; Zhou, M.; Wang, J. Resilience Assessment and Improvement for Cyber-Physical Power Systems Under Typhoon Disasters. IEEE Trans. Smart Grid 2022, 13, 783–794. [Google Scholar] [CrossRef]
  6. Cabiati, M.; Tornelli, C.; Martini, L. The Electric Web-of-Cells Control Architecture Concept for the Future Power System Operation. In Proceedings of the 2018 AEIT International Annual Conference, Bari, Italy, 3–5 October 2018; pp. 1–6. [Google Scholar] [CrossRef]
  7. Chen, C.; Wang, J.H.; Qiu, F.; Zhao, D. Resilient Distribution System by Microgrids Formation After Natural Disasters. IEEE Trans. Smart Grid 2016, 7, 958–966. [Google Scholar] [CrossRef]
  8. Bhattarai, B.P.; De Cerio Mendaza, I.D.; Myers, K.S.; Bak-Jensen, B.; Paudyal, S. Optimum Aggregation and Control of Spatially Distributed Flexible Resources in Smart Grid. IEEE Trans. Smart Grid 2018, 9, 5311–5322. [Google Scholar] [CrossRef]
  9. Kwasinski, A. Quantitative Evaluation of DC Microgrids Availability: Effects of System Architecture and Converter Topology Design Choices. IEEE Trans. Power Electron. 2011, 26, 835–851. [Google Scholar] [CrossRef]
  10. Lei, S.B.; Wang, J.H.; Chen, C.; Hou, Y. Mobile Emergency Generator Pre-Positioning and Real-Time Allocation for Resilient Response to Natural Disasters. IEEE Trans. Smart Grid 2018, 9, 2030–2041. [Google Scholar] [CrossRef]
  11. Wang, F.; Xu, H.C.; Xu, T.; Li, K.; Shafie-Khah, M.; Catalão, J.P. The Values of Market-Based Demand Response on Improving Power System Reliability Under Extreme Circumstances. Appl. Energy 2017, 193, 220–231. [Google Scholar] [CrossRef]
  12. Dai, H.; Liu, Z.; Liu, G.; Deng, H.; Xin, L.; He, L.; Shang, L.; Liu, D.; Shi, J.; Xu, Z.; et al. Collaborative Scheduling Framework for Post-Disaster Restoration: Integrating Electric Vehicles and Traffic Dynamics in Waterlogging Scenarios. Energies 2025, 18, 1708. [Google Scholar] [CrossRef]
  13. Dai, H.; Liu, D.; Liu, G.; Deng, H.; Xin, L.; Shang, L.; Liu, Z.; Xu, Z.; Shi, J.; Chen, C. A Method for Restoring Power Supply to Distribution Networks Considering the Coordination of Multiple Resources Under Typhoon-Induced Waterlogging Disasters. Energies 2025, 18, 1284. [Google Scholar] [CrossRef]
  14. Zhong, H.; Xie, L.; Xia, Q. Coupon Incentive-Based Demand Response: Theory and Case Study. IEEE Trans. Power Syst. 2013, 28, 1266–1276. [Google Scholar] [CrossRef]
  15. Zhu, X.; Zeng, B.; Li, Y.; Liu, J. Co-Optimization of Supply and Demand Resources for Load Restoration of Distribution System Under Extreme Weather. IEEE Access. 2021, 9, 122907–122923. [Google Scholar] [CrossRef]
  16. Hafiz, F.; Chen, B.; Chen, C.; Rodrigo de Queiroz, A.; Husain, I. Utilising Demand Response for Distribution Service Restoration to Achieve Grid Resiliency Against Natural Disasters. IET Gener. Transm. Distrib. 2019, 13, 2942–2950. [Google Scholar] [CrossRef]
  17. Jay, D.; Swarup, K.S. Demand Response Based Automatic Generation Control in Smart-Grid Deregulated Market. In Proceedings of the IEEE 6th International Conference on Power System, New Delhi, India, 15–17 December 2016; pp. 1–6. [Google Scholar] [CrossRef]
  18. Yu, R.; Yang, W.; Rahardja, S. A Statistical Demand-Price Model with Its Application in Optimal Real-Time Price. IEEE Trans. Smart Grid 2012, 3, 1734–1742. [Google Scholar] [CrossRef]
  19. Notice on Printing and Distributing the “Detailed Rules of Virtual Power Plant in Guangzhou”. Available online: https://www.gz.gov.cn/gfxwj/sbmgfxwj/gzsgyhxxhj/content/mpost_7364052.html (accessed on 1 March 2021).
  20. Notice on Printing and Distributing the “Detailed Rules for the Power Demand Response in Jiangsu Province (Revision)”. Available online: http://gxj.yangzhou.gov.cn/yzjingxw/tzgg/201807/ed8d318588104c33b9ba45aef6537238.shtml (accessed on 5 February 2021).
  21. Li, Z.; Yang, P.; Zhao, Z.; Lai, L.L. Retrofit planning and flexible operation of coal-fired units using stochastic dual dynamic integer programming. IEEE Trans. Power Syst. 2023, 39, 2154–2169. [Google Scholar] [CrossRef]
  22. Wang, Y.; Xu, Y.; He, J.; Liu, C.-C.; Schneider, K.P.; Hong, M.; Ton, D.T. Coordinating multiple sources for service restoration to enhance resilience of distribution systems. IEEE Trans. Smart Grid 2019, 10, 5781–5793. [Google Scholar] [CrossRef]
Figure 1. Diagram of DR incentive mechanism.
Figure 1. Diagram of DR incentive mechanism.
Energies 18 02677 g001
Figure 2. The bi-level optimization model framework for load restoration.
Figure 2. The bi-level optimization model framework for load restoration.
Energies 18 02677 g002
Figure 4. Flowchart of the proposed solution algorithm.
Figure 4. Flowchart of the proposed solution algorithm.
Energies 18 02677 g004
Figure 5. Modified IEEE 9-bus system.
Figure 5. Modified IEEE 9-bus system.
Energies 18 02677 g005
Figure 6. Normal and basic load levels of each user.
Figure 6. Normal and basic load levels of each user.
Energies 18 02677 g006
Figure 7. Fitting results of clearing quantity load and clearing price.
Figure 7. Fitting results of clearing quantity load and clearing price.
Energies 18 02677 g007
Figure 8. Incentive coefficients of each user under two scenarios.
Figure 8. Incentive coefficients of each user under two scenarios.
Energies 18 02677 g008
Figure 9. Clearing quantity and actual response quantity of each user under two scenarios.
Figure 9. Clearing quantity and actual response quantity of each user under two scenarios.
Energies 18 02677 g009
Figure 10. Profit situation of each user under two scenarios.
Figure 10. Profit situation of each user under two scenarios.
Energies 18 02677 g010
Figure 11. Profit of each user under different scenarios.
Figure 11. Profit of each user under different scenarios.
Energies 18 02677 g011
Figure 12. Costs paid by the power grid under different scenarios.
Figure 12. Costs paid by the power grid under different scenarios.
Energies 18 02677 g012
Table 1. Priority coefficients of each user.
Table 1. Priority coefficients of each user.
U1U2U3U4U5U6U7U8
100.210101010010010
Table 2. Symmetrical incentive coefficients under two scenarios.
Table 2. Symmetrical incentive coefficients under two scenarios.
ScenariosUserSymmetrical Incentive Coefficients
M1U1–U8[0.7, 1.0, 1.15, 1.2, 1.15, 1.0, 0.7]
M2U1[0.7, 0.9, 1.0, 1.2, 1.0, 0.9, 0.7]
U2[0.7, 0.9, 1.0, 1.2, 1.0, 0.9, 0.7]
U3[0.7, 1.0, 1.15, 1.2, 1.15, 1.0, 0.7]
U4[0.7, 0.9, 1.0, 1.2, 1.0, 0.9, 0.7]
U5[0.7, 0.9, 1.0, 1.2, 1.0, 0.9, 0.7]
U6[0.7, 0.9, 1.0, 1.2, 1.0, 0.9, 0.7]
U7[0.7, 1.0, 1.15, 1.2, 1.15, 1.0, 0.7]
U8[0.7, 1.0, 1.15, 1.2, 1.15, 1.0, 0.7]
Table 3. Tiered incentive ranges under 7 scenarios.
Table 3. Tiered incentive ranges under 7 scenarios.
ScenariosStep Incentive IntervalInterval
N1[0.72, 0.80, 0.88, 0.96, 1.04, 1.12, 1.20, 1.28]0.08
N2[0.65, 0.75, 0.85, 0.95, 1.05, 1.15, 1.25, 1.35]0.10
N3[0.58, 0.70, 0.82, 0.94, 1.06, 1.18, 1.30, 1.42]0.12
N4[0.51, 0.65, 0.79, 0.93, 1.07, 1.21, 1.35, 1.49]0.14
N5[0.44, 0.60, 0.76, 0.92, 1.08, 1.24, 1.40, 1.56]0.16
N6[0.37, 0.55, 0.73, 0.91, 1.09, 1.27, 1.45, 1.63]0.18
N7[0.30, 0.50, 0.70, 0.90, 1.10, 1.30, 1.50, 1.70]0.20
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Share and Cite

MDPI and ACS Style

Shi, X.; Sun, J.; Xiao, X.; Zhang, Y.; Lei, Y.; Yang, H.; Li, Z. A Load Restoration Approach Based on Symmetrical Demand Response Incentive Mechanism. Energies 2025, 18, 2677. https://doi.org/10.3390/en18112677

AMA Style

Shi X, Sun J, Xiao X, Zhang Y, Lei Y, Yang H, Li Z. A Load Restoration Approach Based on Symmetrical Demand Response Incentive Mechanism. Energies. 2025; 18(11):2677. https://doi.org/10.3390/en18112677

Chicago/Turabian Style

Shi, Xuntao, Jian Sun, Xiaobing Xiao, Yongjun Zhang, Yiyong Lei, Hao Yang, and Zhuangzhuang Li. 2025. "A Load Restoration Approach Based on Symmetrical Demand Response Incentive Mechanism" Energies 18, no. 11: 2677. https://doi.org/10.3390/en18112677

APA Style

Shi, X., Sun, J., Xiao, X., Zhang, Y., Lei, Y., Yang, H., & Li, Z. (2025). A Load Restoration Approach Based on Symmetrical Demand Response Incentive Mechanism. Energies, 18(11), 2677. https://doi.org/10.3390/en18112677